plot program 中文意思是什麼

plot program 解釋
計劃程序
  • plot : n 1 陰謀(事件),策劃。2 (小說、戲劇等的)情節。3 【炮兵】測算表。vt ( tt )1 密謀,圖謀;策劃...
  • program : 按遺傳密碼工作
  1. So according to the technology regulation of reclamation engineering, hydraulic calculation must be carried out in the design of final closure. this paper firstly introduces the progression and present situation of reclamation engineering, emphasizing on the features of present reclamation and on the experiences and theories of home and abroad ; using fortran perfects the hydraulic calculation program of the closure and makes the program to meet different conditions ( such as considering flood, the variation of time interval, multi - entrance, multi - reservoir capacity ), and after comparing and analyzing a great deal of schemes, the reasonable computation scheme was brought up ; the interface of the program was carried out by the programming language vb to make the process of calculation become easier and more distinct, so the result can be analyzed and handled more directly ; vb is used in the later management of the result to plot the graphic chart of the isoline of the maximum of hydraulic element ( the velocity of flow, the drop height and the rate of flow ) automatically ; finally it was applied in the reclamation project of dongbidao of fuqing

    本文首先介紹圍海工程的發展進程與國內外圍海的開發現狀,重點介紹了我國目前圍海工程的特點及在圍海工程實踐中積累的經驗和理論;利用fortran語言完善堵口工程龍口水力計算程序,使程序可以滿足圍海工程復雜工況下(如考慮內港洪水、計算時段的變化、多口門、多庫容、多水閘)的龍口水力計算,並進行大量方案的比較和分析,提出合理計算方案;利用面向對象的可視化編程語言vb進行界面開發,使計算過程有良好的人機界面,更直觀地對計算結果進行分析和處理;計算結果的后處理採用vb編程實現龍口水力要素最大值等值線圖的繪制;並運用所編軟體對福建省福清市東壁島圍墾工程進行龍口水力計算,為堵口合龍提供科學依據。
  2. By surveying the sample plot, the relations between the stabil ity of the mountai n slope of soil preparation for planting by using explosion and other factors s uch as precipitation, terrain , were studied. by using the method of quantitative t heory i, the interrelation between the damaged degrees of soil preparation progra ms by using explosion in low mountain area with abundant precipitation and terrain factors was systematically analysed, and the mathematical models relate d were developed. the results show that the precipitation in early days and the m aximum precipitation per day are the primary factors causing the soil prepara tion program damaged. the main terrain factors of the mountain slope that affect the program stability are according to their importance, slope, position and dir ection. the suitable mountain slope for soil preparation by using explosion is th e slope of less than 25

    通過典型標準樣地調查資料,探討了造林爆破整地工程的坡地穩定性與降水、地形等因子的相互關系,應用數量化理論,對在有充分降水條件下的低山丘陵區的爆破整地工程損失程度與地形因子之間的關系進行了系統分析,並建立了相應的數學模型,研究指出,充分的前期降水和日最大降雨量是引起爆破整地工程損失的激發因素;影響爆破整地工程穩定性的主要地形因子是地面坡度,其次為坡位、坡向,實施爆破整地工程的地面坡度以不超過25為宜。
  3. This thesis analyses the background of the plot tendency of the news report, expound the inevitability of the media entering the market by the law of the value, and explain the audiences " choices by the law of psychology. with the changes of the tv culture, the mode of the thinking of the program makers is changing etc. all of these aspects sum up the one point that is how to attract the spectators " eyeballs

    本文分析了新聞報道故事化傾向產生的背景,用價值規律說明了媒體走向市場化運作的必然,用受眾心理規律解釋了受眾對媒體的選擇,由於電視文化理念的變化帶來的節目製作者思維方式的變化等等,所有這些因素歸結於一點,就是電視如何爭取更多觀眾的眼球。
  4. On the basis of the third chapter, the forth chapter more detailed tells the research aim, system confine and the input data needed to be collected of the distribution center operation system simulation. it also provides the flow chart and program plot of the simulation mould, builds the simulation mould of the distribution center operation system. it steers the realization of the distribution center operation system simulation

    第四章在第三章的基礎上,進一步闡述了配送中心作業管理系統模擬的研究目的和系統邊界以所需採集的輸入數據,並給出了模擬模型的流程圖和程序框圖,建立了配送中心作業管理系統的模擬模型,為配送中心作業管理系統模擬的實現起到了指導作用。
  5. On january 5, 2007 year i save first plot project to be in ning hai sell one ' s own things, in the course price falls many intense contest, final mostly the company takes next old the city zone with 450 million yuan total prices 146 mus gold plot, west plot backer ( the program is building ) for park of xu xia ' s guest, south, the east is urban road, change is being torn open in, similar program is high - end residence village, the project enjoys the commercial form a complete set with old mature the city zone namely, the landscape landscape that holds ning hai concurrently again ( park of xu glow guest and ) of a covered corridor or walk of landscape of big brook travel, it is a god - given gold treasure ground

    2007年1月5日年我省首個地塊項目在寧海出讓,在經過多次激烈的競價下,最終大都公司以4 . 5億元的總價拿下老城區146畝的黃金地塊,地塊西面靠山(規劃為徐霞客公園正在建造) ,南面、東面為城市道路,北面正在拆遷,同樣規劃為高端住宅小區,項目即享有老城區成熟的商業配套,又兼有寧海的山水景觀(徐霞客公園和大溪旅遊景觀長廊) ,是一塊難得的黃金寶地。
  6. On nov. 10th, the 32nd acm - icpc first - electing competition of asia region in 2007 and “ mstc cup ” the undergraduate program - designing challenge competition was held in the announcing plot of meeting center

    11月10日, 2007年第32屆acm icpc亞洲區預選賽(北京賽區)暨"微軟杯"大學生程序設計挑戰賽在北京航空航天大學如心會議中心大報告廳開幕。
  7. On nov. 10th, the 32th acm - icpc first - electing competition of asia region in 2007 and “ mstc cup ” the undergraduate program - designing challenge competition was held in the announcing plot of ruxin meeting center

    11月10日, 2007年第32屆acm icpc亞洲區預選賽(北京賽區)暨"微軟杯"大學生程序設計挑戰賽在北京航空航天大學如心會議中心大報告廳開幕。
  8. The data used by calculation program and post - processing are formed by dialog boxes, and fed back by figure. a finite element program which considers the influence of axial deformation can analyze the prestressed concrete frame structure, then the structure is designed according to the code of concrete structure gbj10 - 89. post - processing can give the result of calulation by text file and graph, and plot construction drawings in autocad

    前處理模塊通過對話框採集數據來建模,並利用圖形反饋建模結果;計算核心利用考慮了軸向變形的桿系有限元程序計算荷載效應和預應力效應,並按《混凝土結構設計規范》 gbj10 ? 89計算承載能力極限狀態和正常使用極限狀態;后處理模塊通過文本文件和圖形顯示來完成結果查詢,並直接在autocad環境下生成施工圖。
分享友人