post bridge 中文意思是什麼

post bridge 解釋
波斯特布里奇
  • post : n 1 (被指定的)地位,崗位;職位,職守。2 【軍事】哨所,站;哨兵警戒區;〈轉義〉哨兵,衛兵。3 基...
  • bridge : n 1 橋,橋梁;【造船】艦橋,船橋。2 鼻樑;(假牙上的)齒橋;【音樂】弦柱,弦馬;【電學】電橋;【...
  1. For years, reconciliation in post - war mostar was slower than anywhere else in bosnia. but the reconstruction of the city ' s old bridge last year has helped reunite muslim and croat communities separated by the river

    出生在美國舊金山的李小龍因出演多部功夫影片而風靡世界,他在32歲時因腦部水腫而去世。
  2. The factory undertakes the composing of the following business mainly : white marbl carved stone crouches the lion, the sleeping white marbl carved stone lion leak from the lion, white marbl carved stone, white marbl kylin, white marbl mythical wild animal ( pixiu ), white marbl dragon and phenix lamp pole, white marbl ornamental column, the cattle opening up virgin soil, white marbl figure of the buddha, the top of a pillar stone, white marbl fairy maiden, white marbl personage, white marbl carved stone elephant ( figure in stone ), white marbl dolmen, white marbl shi ting, stone bridge, white marbl stele, white marbl check dragon post, white marbl balustrade, granite dysmorphism, stone strip, flat piece of stone, foundation stone, door block, jade article treating, emboss, ornamental column, dragon post, lettering, silica sand, white marbl woollen cloth, ancient times build gardens ( breast board, platform ming dynasty, artificial stone with textures cut with an axe, rockery design, flowerpot, eroded limestone, mechanism cobblestone, mushroom stone etc. ), rockery fountain, nursery stock flowers and plants etc. paper of, saying that the stone table, stone bench, stone light, board carve characters on a seal, the column, vase post, window cover with, the door pocket, geomantic omen ball wait, and managing

    本廠主要承做以下業務:漢白玉石雕蹲獅、漢白玉石雕走獅、漢白玉石雕臥獅、漢白玉麒麟、漢白玉貔貅(皮休) 、漢白玉龍鳳燈柱、漢白玉華表、拓荒牛、漢白玉佛像、柱頂石、漢白玉仙女、漢白玉人物、漢白玉石雕大象(石像) 、漢白玉石牌坊、漢白玉石亭、石橋、漢白玉石碑、漢白玉盤龍柱、漢白玉欄桿、花崗巖異形、石條、石板、漢白玉奠基石、門墩、玉器加工、浮雕、華表、龍柱、刻字、硅砂、漢白玉毛料、古建園林(欄板、臺明、剁斧石、板道、石桌、石凳、石燈、牌匾刻字、圓柱、花瓶柱、窗套、門套、風水球等,並經營假山石、花盆、太湖石、機制鵝卵石、蘑菇石等) 、假山噴泉、苗木花卉等。
  3. After the destruction of the post you fall back onto the bridge and cover the road from above and my left flank.

    端掉了哨所,你得回過頭來向橋靠攏,從上面和我的左翼用火力封鎖公路。
  4. Application of prestressed concrete in plate girder bridge with post - tensioning method without splice

    后張無粘結部分預應力砼在板梁橋中的應用
  5. Ignoring the jerking of her chest muscles and holding her breath resolutely, she pushed away from the post and swam along the bridge shadow. the bridge was long, but it had to lead to shallow water. she kept going

    顧不得胸肌的抽搐,拼全力憋住呼吸,她離橋墩那根支柱,沿著橋的影子游去。橋是很長,但總有淺水橋端。她不停地游。
  6. Discussion on the post - evaluation method of the bridge reinforcement

    橋梁加固后評價的方法淺議
  7. Prestressing force post tensioning type application in bridge construction

    預應力后張法在橋梁施工中的應用
  8. The leading businesses include sculpture of stainless steel, sculpture of glass fibre reinforced plastic, all kinds of figure or animal stone carving, relief sculpture, mural paintings, stonelamp, roman post, railing of bridge, mushroom stone, stone of upstairs, construction of rockery, fountain, level - dividing water project with all kinds of stone materials, and construction of all kinds of ancient architecture such as sideway pavilion, platform, building, pavilion, pavilion on a terrace, corridor, bridge and ancient boat

    公司主要業務:不銹鋼雕塑玻璃鋼雕塑石雕石刻各種人物動物浮雕壁畫石燈羅馬柱橋欄蘑菇石臺階石各種石料的假山噴泉疊水工程的營建,亭臺樓閣榭廓橋舫各類古建築的營造。景區公園廣場園林綠化的規劃設計施工。
  9. Customers from huizhou, shenzhen and dongguan should pass humen bridge and the nansha dadao of panyu district to shiqiao, then drive on the guangzhou ? zhuhai line of 105 national road until you reach the traffic post of midea group in beijiao ( the crossing of sanhong bridge ), then turn right to sanle lu and drive along to lecong crossroads, turn left and drive along for 200m and you will reach sunlink north section furniture city of lecong ; or you can drive in the direction to foshan through guangzhou - shenzhen highway until you reach shunde lunjiao crossroads ( longzhou lu ) where you can drive to foshan and longjiang

    惠州、深圳、東莞方向客人,經虎門大橋番禺南沙大道到市橋走105國道廣珠線到北?美的集團交通崗(即三洪橋大橋路口)右轉?三樂路直行到樂從立交橋左轉200米即到樂從順聯北區家私城,或走廣深高速往佛山方向,在順德倫教立交橋(龍洲路) ,可往佛山、龍江方向。
  10. Post - tensioned pre - cast concrete simple - supported girder for railway bridge pro - stress

    預應力混凝土鐵路橋簡支梁靜載彎曲試驗方法及評定標準
  11. This is machine is special for producing round flat corrugated ducts used in expressway, bridge, train and large - span post - tension concrete project

    Sb - jg - 110型卷管機,是用於卷製作為橋梁建築預應力施工中預留孔道的螺紋管的機器。
  12. In the transversal vibration test of the steel supporting post on the flange of qinshen railway bridge, the practical techniques of instrument selection, the provision of static eliminater and the way of data sampling are mainly discussed

    摘要針對秦沈線橋上翼緣板接觸網鋼柱的橫向振動測試,著重論述了儀器的選型、抗靜電干擾措施以及數據採集中的具體技術。
  13. In 1993, china started up three gold projects including gold - bridge, gold - check post, gold - tariff, which marked that the building of chinese e - government began. in 1999, the project of the government going into the network marked that the building of chinese e - government roundly have putted in practice

    我國1993年啟動的「三金工程」 (金橋、金卡、金關)標志著我國電子政府建設開始起步, 1999年的「政府上網工程」標志著我國電子政府建設全面實施。
  14. In this paper, the reinforcement method with steel plate adhering to a real queen - post girder in bridge was analyzed by using the space entity simulation model, and the effect was validated by load test on site

    摘要針對某座橋梁下部結構蓋梁採用粘鋼法進行加固,對其加固效果採用有限元模型進行模擬分析計算,並通過現場荷載試驗進行驗證。
  15. Especially the bridge engineering has to be concerned with high, new and difficult technologies. new technologies firstly adopted are post - tensioned prestressed concrete simply - supported box girder, assembly two - way prestressed concrete simply - supported t - girder, reinforced concrete continuous rigid frame, and steel - concrete composite continuous girder. all these have formed a series of new bridge structures taking prestressed concrete simply - supported box girder as main feature

    由於秦沈客運專線的特殊技術要求,在鐵路建設史上首次採用了后張法預應力混凝土箱形簡支梁、裝配式雙向預應力混凝土t形簡支梁、鋼筋混凝土剛構連續梁、鋼與混凝土結合連續梁等橋跨結構,形成了以預應力簡支箱梁橋跨結構為主要特徵的一系列橋梁新結構。
  16. As a whole, marxism is the only idealistic bridge that connects the modernity with the post modernity, the unsurpassable theory in its significance. therefore, we are in duty bound to associate theoretic with facts to enrich the meaning of marxism, make it vivid and vigorous. hence, people would be glad to return to marxism, that is, accept the back of it agreeably

    據此,本文得出結論:馬克思主義哲學是一座從現代走向後現代必經的思想橋梁,是「不可超越的意義視界」 ,通過實際行動把馬克思主義與現實相結合產生的新的活生生的馬克思主義,使人們接受馬克思的返回或返回到馬克思,這就是我們哲學工作者義不容辭的責任。
  17. Secondly, rules to set indicators - system and the indicators - system are built according to the characteristics of highway and bridge project post - evaluation. an grey comprehensive cluster post - evaluation algorithm is built with the help of grey cluster evaluation, methodology of with and without comparison, ahp etc. dates of evaluating objects are computed through contrasts value and threshold value. the steps of grey comprehensive cluster post - evaluation algorithm are given

    其次,根據路橋投資項目后評價的特徵,指出路橋投項目綜合后評價指標體系設置原則,並設立綜合后評價指標體系;結合灰色聚類評估方法、對比法、層次分析法、專家調查法等建立灰色綜合聚類后評價模型的演算法,通過建立的對比值、前後變化閾值實現對指標數據的獲取,進而提出了論文所建立的灰色綜合聚類后評價模型的演算法和步驟。
  18. Application of post - tensioned prestressing technology to qilin bridge

    后張法預應力技術在麒麟大橋工程中的應用
  19. Secondly author calculates and analyses normal stress and shear stress of the girder for a assembling post - tensioned concrete skew girder bridge with a span of 40 m due to the actions of the dead load, temperature changes, shrinkage and creep of concrete and live loads, and calculates and analyses normal stress and shear stress of diaphragms due to the actions of the subordinate phase dead load, temperature changes, shrinkage and creep of concrete and live loads

    其次重點對跨徑為40m標準設計的裝配式后張預應力混凝土斜梁橋在恆載、溫度變化、混凝土收縮和徐變、活載作用下主梁的正應力、豎向變形和恆載、活載作用下主梁的剪應力進行計算分析。計算分析橫隔板在二期恆載、溫度變化、混凝土收縮、活載作用下的正應力、剪應力。
  20. However, several questions related to the post - earthquake health, in other words, the residual behavior of the retrofitted bridge columns remained unanswered

    然而,加固柱在經歷地震作用后的殘余性能方面,還存在研究盲區。
分享友人