potential surface analysis 中文意思是什麼

potential surface analysis 解釋
潛力面分析
  • potential : adj 1 可能的;【語法】可能語氣的。2 潛在的;有潛勢的;【物理學】位的,勢的。3 〈罕用語〉有力的。n...
  • surface : n 1 表面;地面;水面;廣場,空地。2 外觀,外表,皮毛。3 【幾】面;切口;【航空】翼面。adj 表面的...
  • analysis : n. (pl. -ses )1. 分解,分析;【數學】解析。2. 梗概,要略。3. 〈美國〉用精神分析法治療(= psychoanalysis)。
  1. Methods : after cultured scs combined with fn were grafted into hemi - resected lumbar spinal cords of adult rats, we used surface recording of spinal cord evoked potential ( scep ) and image analysis system to compare the latent period of scep and count the axon number between the therapeutic group and the control group

    方法:將體外培養的雪旺細胞結合纖連蛋白植入大鼠半切損傷的脊髓內,用脊髓誘發電位及圖像分析方法比較治療組和對照組誘發電位潛伏期,再生軸突計數及二者間的關系。
  2. The above analysis showed that this heavy rainfall event took on obvious meso - scale characters and was the combination of the three flows, so we can deduce : ( 1 ) surface southeasterly wind and topography may play the main role in this event ; ( 2 ) the easterly cold air rushing into the southern shaanxi province in the lower troposphere was strongly relative to the form of surface cold - front type of occlusion ; ( 3 ) there were two reasons for the secondary circulation ' s strengthen in the evening, one was the effect of a mountain - valley wind and the other may be latent heat leading to ascending motion ; ( 4 ) the shape of potential instability stratification corresponded well with the development of the warm - moisture advection ; and ( 5 ) the vapor providing essential thermodynamics was transported by a southwesterly low - level jet from the bay of bengal and the south china sea. furthermore, with the effect of terrain, the southern shaanxi province became the center of this extremely heavy rain process

    中尺度結構分析表明,本次暴雨具有明顯的中尺度特徵,是由三支氣流共同作用的結果,分析發現( 1 )地面東南風和地形在這次大暴雨過程起主要作用; ( 2 )東路冷空氣主要是通過中低層侵入陜南地區的,並與地面冷式錮囚鋒的形成密不可分; ( 3 )夜博士論文:中尺度地形對陜南暴雨的影響研究間垂直次級環流發展加強可能有兩個原因,一個是由於地形山谷風的作用,另一個是降水的潛熱釋放激發了上升運動: ( 4 )位勢不穩定層結的形成與低層暖濕平流的發展有很好的對應關系; ( 5 )本次暴雨的水汽主要靠偏南風急流將孟加拉灣和中國南海的水汽輸送至西北地區東部,為暴雨的發生提供了必要熱力條件。
  3. Through the thermodynamic analysis for the sandstorm weather according to the simulated potential temperature, potential vorticity field, it is found that this sandstorm weather occurred in the condition of the atmospheric stratification stability, the area of the high potential temperature value and the potential temperature gradient have a good corresponding relationship with the surface cold air and cold front, so are the strength of potential vorticity and the different developing stage of sandstorm

    利用輸出的位溫、位勢渦度場,對沙塵暴天氣進行熱動力條件分析,發現本次沙塵暴天氣發生在大氣層結穩定狀態下,位溫大值區及位溫梯度與地面暖低壓的強弱和移動有著很好的對應關系,位渦的水平分佈特徵和強弱變化對沙塵暴的出現時間和落區有一定的指示意義。
  4. In other words, the process of analyzing relaxation zone related to one safety factor can also be regarded as the process of searching potential slide surface related to the same safety factor. elastic wedge model is used for analysis of relaxation zone of cutting homogeneous slope. on the basis of elastic plane - strain theory, the relaxation zone can be calculated according to mohr - coulomb or drucker - prager law and single tension intensity principle which are both related to one safety factor after three - dimensional stress field of the cutting slope is got

    提出均質邊坡開挖鬆弛區可以用彈性理論中的楔形體理論分析,在平面應變問題的基礎上得到開挖坡體的三向應力場之後,可運用考慮安全儲備后的強度條件(主要為摩爾?庫侖或德魯克?布拉格強度準則和單軸抗拉強度準則)解析坡體分步開挖過程中的鬆弛區范圍,給出了具體的計算步驟,並通過算例較詳細地說明了操作過程。
  5. Through analysis of potential vorticity in isobaric surface field, in low - troposphere a positive potential vorticity disturbance exist and form incline disturbance column northward before rainstorm generation, at the same time have also reflected positive potential vorticity disturbance for severe convection weather trigger role in lower - troposphere ; soon positive potential vorticity disturbance in high - troposphere downward, form one vertical disturbance column, now corresponding precipitation develop stage ; in the prosperous stage of rainstorm that maintains isolines of horizontal distribution and still have straight positive potential vorticity disturbance in 600 - 700 hpa isobaric surface field ; when near ground arises negative potential vorticity disturbance, precipitation also weaken

    通過對等壓面的位渦分析,發現了在暴雨發生前,在對流層低層有正位渦擾動存在並向北形成傾斜的擾動柱,同時也反映了對流層低層正位渦擾動對強對流天氣的觸發作用;隨后高層正位渦向下擾動,形成一個垂直擾動柱,這時對應降水的發展階段:在暴雨的鼎盛階段, 600 700hpa上空維持水平分佈的等值線,在其上還有正的位渦擾動;當近地面出現負的位渦擾動時,降水隨之也減弱。
  6. Through analysis of potential vorticity in equity - entropy surface field, a relatively high potential vorticity center in cyclone top in low - troposphere have discovered, and make cyclone develop in a more deep cyclone circulation by this ; and an anticyclone circulation zone with more severe low potential vorticity in high - troposphere

    通過對等熵面的位渦分析,發現了對流層中低層的位渦場,在氣旋上方有一個相對高位渦中心,由此使得氣旋在一個比較深厚的氣旋性環流中發展;而對流層高層則是一個伴有較強位渦低值的反氣旋環流區。
  7. Based on the method of limitation analysis of soil plasticity, researching from the soil arching mechanism of soil - nailing retaining, the upper limit of the critical height of soil - nailing slopes and the minimum horizontal length from coping of the potential slide surface to the edge of deep excavation are obtained through the analysis to weight of soil and vertical loading and the mechanism of soil and soli - nailing acting reciprocally

    摘要基於土的塑性極限分析方法,以均質土坡為例,從土釘支護結構的準粘聚力理論出發,綜合考慮土體自重、坡頂的條形荷載,以及土釘與土體的相互作用的機理,推導出了土釘支護的臨界高度的上限值和潛在螺旋曲線滑動面在坡頂方向距基坑邊沿的最小水平距離解析表達式,可供基抗支護設計參考。
  8. In this paper, based on the previous research result, by using theory of electrochemical mechanism, probability math, reliability theory, basic theory of pre - stressed concrete structures, structure optimum design, theory of control, maintenance strategy decision theory of structures and etc., the research on steel corrosion monitoring method, structural corrosion damage model, reliability analysis, the maintenance and repair method that based on corrosion control, the optimum structural design method of new bridge structures that consider durability and the optimum maintenance strategy decision theory are carried out. 2. corrosion mechanism and monitoring technique it is widely accepted that the corrosion of steel in concrete structure is a electrochemical process, include the formation of anode & cathode area on metal surface and potential difference between different ' area

    本文在已有理論研究的基礎上,針對預應力混凝土橋梁建設及使用中存在的影響結構耐久性的實際問題,綜合運用電化學理論、概率理論、結構可靠性理論、混凝土和預應力混凝土結構基本理論、結構優化理論及控制維修決策等理論和方法,詳細研究了基於電化學理論的鋼筋銹蝕檢測方法、預應力混凝土橋梁結構的腐蝕損傷模型、可靠性分析、基於腐蝕控制的維修方法、橋梁結構方案選型及優化設計以及在役橋梁結構的優化維修決策等問題第二章混凝土結構的腐蝕機理及檢測技術目前普遍認為,結構混凝土中鋼筋的腐蝕是一種電化學的過程,包括在金屬表面形成陽極(腐蝕)和陰極(鈍化)區域以及不同區域間的電位差等。
  9. The determination of potential downslide surface is one of the most important content, so a method is brought forward. based on the result of 3d nonlinear finite element analysis, a method to determinate the potential downslide surface and safety factor for analyzing sliding force has been put forward

    邊坡可能下滑面的確定一直是邊坡穩定分析的一個重要內容,本文提出了根據三維非線性有限元穩定分析結果確定邊坡可能滑裂面及指定安全系數的下滑力的分析方法,為邊坡加固提供參考。
  10. Analysis of ground surface potential distribution under single - pole operation mode of hvdc transmission lines on special soils

    輸電線路單極模式運行時的地表電位計算
分享友人