pouring box 中文意思是什麼

pouring box 解釋
澆注箱, 中間包, 中間罐, 冒口保溫箱
  • pouring : 澆鑄, 澆注
  • box : n 1 箱,櫃,匣,盒;罩殼;錢櫃;〈美口〉保險箱;郵箱,信箱;〈英國〉禮盒;禮物(旅行用)衣箱。2 ...
  1. Also call to pour the type to open the bore box a box for, department on the box the front - panel openning having pouring the bore. because of openning to there is bore, voice in the box to can then radiate the outside. pour the type the box the low frequency extension for ratio closeness type box to be good friends with the amount, but the bass usually and not and so fructify the tightly packed. comparison " infinite baffle " infinite baffle

    也稱倒相式開孔箱,系在音箱面板上開有倒相孔槽的一類音箱。由於開有孔,箱內的聲音便可以輻射到外面來。倒相式音箱比密閉式音箱的低頻延伸要好些,但低音往往不那麼結實緊湊。
  2. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  3. Abstract : the shaft well of the xiezhuang coal mine has been designed of a poured - in - place reinfcrced concret box structure. sliding and pouring method, an alternate procedure for the construction of a coal mine shaft well project, the procedures are as following : 1, the progress of each storey " s construction has been carried out step by step duly 2, the construction of slabs and 3, during construction, the light - type network structure has been used as a complementary operating platform for the sliding formwork construction. these synchronization procedures have achieved comprehensive economic benefit and social efficiency

    文摘:協莊礦副立井井塔為現澆鋼筋混凝土箱形結構,採用滑一澆一工藝進行煤礦井塔施工,施工順序為塔壁逐層滑升,梁板逐層跟進,施工中利用井塔屋面輕型網架結構作為滑模輔助操作平臺,同步滑升,取得了較好的綜合經濟效益和社會效益。
  4. The shaft well of the xiezhuang coal mine has been designed of a poured - in - place reinfcrced concret box structure. sliding and pouring method, an alternate procedure for the construction of a coal mine shaft well project, the procedures are as following : 1, the progress of each storeys construction has been carried out step by step duly 2, the construction of slabs and 3, during construction, the light - type network structure has been used as a complementary operating platform for the sliding formwork construction. these synchronization procedures have achieved comprehensive economic benefit and social efficiency

    協莊礦副立井井塔為現澆鋼筋混凝土箱形結構,採用滑一澆一工藝進行煤礦井塔施工,施工順序為塔壁逐層滑升,梁板逐層跟進,施工中利用井塔屋面輕型網架結構作為滑模輔助操作平臺,同步滑升,取得了較好的綜合經濟效益和社會效益。