power station 中文意思是什麼

power station 解釋
水電站
  • power : n 1 力,力量;能力;體力,精力;(生理)機能;〈常 pl 〉才能。2 勢力,權力,權限;威力;政權;權...
  • station : n 1 站,臺,車站;航空站,機場。2 派出所;署,局,所。3 【無線電】電臺,電視臺。 4 駐地,部戍地,...
  1. The first power station of jinping mountain lies in the west section of the yanglongjiang river from santan to shoupagou gully, with a double - curved arch dam of 305 - meter height and a normal water storage of 1880metres. the exposed strata of the damsite are marbles and arenaceous rocks of triassic and solution fissures have been developed in the marbles of the left - bank ' s dam abutment, and they have become a stratum of strong leakage. as a result, it has been an important problem for the dam foundation to stop leakage

    錦屏一級電站位於西雅礱江的三灘至手爬溝河段,壩型為305米高雙曲拱壩,正常蓄水位標高1880米。壩址區出露的地層為三疊系雜谷腦組二段大理巖和三疊系雜谷腦組三段的砂板巖。在勘探過程中,發現左岸壩肩大理巖體中的構造裂隙和溶蝕裂隙發育,且成為強滲透地層,為此壩基的防滲成為重要問題。
  2. The selection of neutral - point earthing ways of the hydrogenerator of left - bank power station in the three gorges project should be related to one - point earthing protection of the stator of its generator within one hundred percent framework

    三峽工程左岸電站水輪發電機中性點接地方式的選擇應和發電機100 %范圍定子一點接地保護相關聯。
  3. Because of the technical complexity of the turbine for the three gorges project and on the basis of several important technical problems which have been defined in the international bidding documents for 14 generating units in the left bank power station, the owner of the project has decided another some important technical problems based on appraisal and comparison in the bid appraisal stage after the bidding documents are analyzed and the tender documents are cleared by the tenderers

    由於三峽工程水輪機技術上的復雜性和挑戰性,在左岸電站14臺機組國際招標文件已明確了若干重大技術問題的基礎上,在機組議評標階段,對招標文件進行分析和投標商對投標文件進行澄清說明后,經評議比選,業主又決策了幾個重大技術問題,主要有:水輪機設計水頭的確定,負傾角葉片水輪機的應用,兩套水力設計,舍棄初期轉輪,蝸殼進行水壓試驗等。
  4. Such as : the liner of coal bunker of power station, the lining of dust cyclone and classifying cyclone, the liner of chemical storage tank and warehouse for corrosion material, the floor material for chemical plants and low friction vehicle testing surface etc

    玄武巖鑄石板主要用於襯砌火電廠煤倉,各種規格旋風器,鋪設各類化工廠地面,汽車剎車試驗場地面等,也用於襯砌酸洗槽或儲存腐蝕性物品的貯存室。
  5. The cast basalt tiles may be used in all kinds of ways. such as : the liner of coal bunker of power station, the lining of dust cyclone, the liner of chemical storage tank and warehouse for corrosion material, the floor material for chemical plants and lowfriction vehicle testing surface etc

    玄武巖鑄石板主要用於襯砌火電廠煤倉,各種規格旋風除塵器、旋流器、鋪設各類化工廠地面,汽車剎車試驗場地面等,也可用於襯砌酸洗槽或儲存腐蝕性物品的貯存室。
  6. Guide for procurement of power station equipment - part 6 - 3 : turbine auxiliaries ; condensator plant ; german version en 45510 - 6 - 3 : 1998

    發電廠設備購置說明.第6 - 3部分:渦輪機輔助設備.冷凝
  7. The building located in the tianjing dagon power station and us floor plane means a eleetron maik

    該工程位於天津大港發電廠內,建築的平面構思為一個電力符號。
  8. The main production includes heat - pipe, heat - pipe exchanger setting, rubber tyre hot water deaerate power station, boiler deaerator, tyre forming machine, rubber cutting machine, vulcanize, vulcanizing pot and the special carbon steel or stainless steel pot for oil, chemical engineering, medicine, chemical fertilizer field use

    濟南仙峰泰山化工設備有限公司主要生產熱管、熱管換熱器、橡膠輪胎廠子午胎斜交胎熱水除氧動力站、鍋爐除氧器、輪胎成型機、切膠機、硫化機、硫化罐,還有石油、化工、化肥、醫藥、冶金、建材等行業使用的各種碳鋼、不銹鋼、有色金屬的塔、罐、釜、換熱器等產品。
  9. Firstly, simulate flow field of rear smoke channel, plot velocity magnitude and ash concentration distribution in section of entry of heat pipe air preheater, compare with data which were measured in guiyang power station, verify simulation to be reasonable and right. secondly, simulate all kinds of factors which affect flow field ' s uniformity such as length, thickness, location of diffluent board, ash concentration, ash diameter, and so on, find the chiefly factors. thirdly, install guide board in curve channel in rear smoke channel, then simulate its " flow field, plot velocity magnitude and ash concentration distribution

    在此基礎上模擬在冬夏兩季不同情況下,不同流速對熱管空氣預熱器壁面溫度的影響;然後對影響整個流場分佈的各種因素:包括分流板長度、厚度、偏離中心流道位置的偏離度、飛灰濃度、飛灰粒徑等因素進行數值模擬;最後提出在分流煙道轉彎處加裝導流板,並模擬加裝導流板后的流場分佈,得到下級空氣預熱器出口、熱管空氣預熱器進口處的斷面速度場分佈、濃度場分佈,以論證加裝導流板能達到流場均勻化的作用。
  10. Namely : high wear - resisting rubber, screen mesh of polyurethane ( pu ), become the domestic biggest producer specializing in high wear - resisting screen mesh, the practical experience for many years, craft is it develop high - quality to apply, durable new product have all over foot industrial demand modernized polyurethane, becoming can produce the production bases of different high wear - resisting screen mesh at home, whom products can select rubber or polyurethane screen mesh for use at home separately coloured, ferrous metal mine enterprise, power station and building materials sift subsystem use, well received by ore dressing circle from home, this mean square garden screen mesh of our company credit can trust among user

    即:高耐磨橡膠、聚氨酯( pu )篩網,成為國內專業生產高耐磨篩網的最大廠家,有著多年的實踐經驗,將現代化的聚氨酯工藝應用於開發優質、耐用的新產品來滿足工業需求,成為國內能生產各種高耐磨篩網的生產基地,產品可以分別選用橡膠或聚氨酯篩網在國內的有色、黑色金屬礦山企業、水電站及建材篩分系統使用,受到國內選礦界的好評,這就意味著我公司的方園牌篩網在用戶中信用完全可以信賴。
  11. Research on the assessment system for water economization and power generating improvement of gongboxia power station

    公伯峽水電站節水增發考核方法研究
  12. An electric power station is a factory in which energy is converted from one form or another into electrical energy.

    電站是把這種能或那種能轉變成電能的地方。
  13. Already the home of the worlds largest and most efficient straw - fired power station, and europes biggest plant powered by poultry litter, the uk is to build a biomass - fired power station with an electrical capacity of 44 megawatts

    作為已經擁有了世界上規模最大,效率最高的秸稈燃燒發電廠,以及歐洲最大的養殖家禽的廢棄物發電廠的國家,英國正在建設一座發電能力
  14. To apply the real - time observation system will increase the safety and equability of production ; it provides scientific and rational reference to aid in operating power station properly and economically. according to the characteristics of the power station of chengdu banknote complex, the real - time observation system is developed, during the period of developing and designing this system, 1 have mostly completed following works : 1

    對動力站實施實時監測系統,將大大提高動力站運行的安全性和平穩型,對提高產品質量、實現安全運行起到積極的作用;同時,可以為科學合理調度運行機組提供理論依據,從而實現最佳經濟運行,為企業創造效益。
  15. Design code for diesel power station of oil - gas field

    油氣田柴油機發電站設計規范
  16. The schematic flow of low temperature geothermal fluids through a power station in italy is presented in example b.

    例子B是義大利一個電站利用低溫地熱流體的流程示意圖。
  17. High temperature pressure power station globe valves

    高溫高壓電站截止閥
  18. Guangdong nuclear power station gnps

    廣東核電站廣東核電站
  19. Building up the math - model of transient for the all hinge of riverbed power station with the kaplan turbine, building a simulation software for this kind of system and calculate the transient which take into account the effect of the ground swell on the riverbed. this program also can calculate the different kind of the kaplan turbine

    針對轉槳機組河床逕流式電站的樞紐系統,建立了全樞紐過渡過程的計算模型,並且編制了相應的計算程序,進行了計及河床涌浪的全樞紐系統的過渡過程模擬計算,該程序能對同一樞紐中含有不同型號機組的電站同時進行過渡過程計算。
  20. Carry out underground and above ground ido tanks cleaning and leakage inspection for clp power in castle peak power station in 2006

    2006年于中電青山發電廠進行地底、地面油缸清理及壓力測試工作。
分享友人