power supply room 中文意思是什麼

power supply room 解釋
電氣室
  • power : n 1 力,力量;能力;體力,精力;(生理)機能;〈常 pl 〉才能。2 勢力,權力,權限;威力;政權;權...
  • supply : vt ( plied) 供給;供應;配給;補充,填補,彌補(不足、損失等)。 Cows supply us (with) milk ...
  • room : n 1 室,房間。2 場所,席位,位置,地位,空間。3 餘地,餘裕;機會。4 〈pl 〉一套房間;寄宿舍;出租...
  1. Locale needs special person to control, play - and - plug. inputting entry of six groups has 6v power supply with eidolon. if matching meeting transmitter hc - 808 hc - 706 and interface transmitter, you can build up a small meeting expanding sound system, which makes conference room installed easily and use every time

    與界面話筒配接可廣泛的應用在現有教學擴音設備的升級改造,替代原有手持話筒領夾無線話筒,教師講課無需攜帶任何設備,徹底擺脫話筒的束縛,無需專人管理,即開即用。
  2. In the hardware design, the paper completes modules ’ design like outside memory, patulous a / d, patulous d / a, rs232 communication, ecan communication, led control, keyboard control, distant control, emulation, reset, logic voltage switch, dsp supply power regulate and ac - dc power circuit, as well as room layout design like anterior panel, back panel etc. and dsp transfers data with peripheral equipments except outside memory using serial ports. besides, the whole circuit is configured in interrupt response. thus, it can meet system demand as well as take full advantage of tms320f2812 ’ s hardware resource. in the software design, the paper finishs programs like the interface programms intercommunicates with people, the distant control program, ad and da modules ’ control program, in addition, the paper select the velocity and acceleration state - feedback algorithm and is written in the program. the software design uses dsp integrate exploiting environment named ccs2. 2 of ti inc. as software instrument, and programs with the combination of c language and assembly language. moreover, in order to maintenance or modify the software expediently and shorten software ’ s exploitation time, the design adopt software modularization technique. finally, some air cylinder experiments are carried out to proved that the pneumatic controller is very practical

    在硬體設計中,本文完成了片外存儲器擴展、 a / d擴展、 d / a擴展、 rs232通信介面、 ecan通信總線介面、液晶顯示控制、鍵盤控制、遠程控制、模擬、復位、邏輯電平轉換、 dsp工作電源校正電路和ac - dc電源等模塊設計以及控制器前面板、後面板等的空間布局設計。其中dsp與除外部存儲器的外圍設備之間的數據傳送全部採用串口通信,同時系統電路配置成中斷響應方式,這樣既滿足了系統要求,又充分利用了tms320f2812的硬體資源。在軟體設計中,本文完成了人機界面功能模塊、遠程控制模塊、 ad擴展模塊、 da擴展模塊、速度和加速度狀態反饋的控制演算法的程序設計。
  3. The ultra amusing ultra q remote control sweeps clear the vehicle, 1 to 8 proportions, 8 channels entire directions remote control, when advance backlash on the automobile body work lantern festival glitters, is concurrent music, the careful design remote control conforms to the kinesiology, the unique double throwout lever remote control way, on about remote control two throwout levers each control two powers wheels, slightly cause the vehicle the radius of turn to be more nimble, and marches forward when the vehicle simultaneously opens sweeps the plate to sweep clear and to turn fights controls remotely into the reality, sweeps the plate starts when also can send out delightful music, sweeps the plate also to be able control during rotation rocks, behind in the automobile body work theater box puts has continuously may skid and may open the cover the trash can, the trash can also may take out, turns fights may independently control remotely, the handling room vehicle door may start, the remote control is away from in the city surpasses 30 meters, the spacious area may achieve above 50 meters, holds controls nimbly is convenient, the luminous automobile body paint surface, works first - class, the use industry packs the ni - cd battery to take the power supply, may repeatedly charge 300 above time

    超好玩超q的遙控清掃車, 1比8比例, 8通道全方向遙控,前進後退時車身上的工作燈會閃爍,並發出音樂聲,精心設計的遙控器符合人體工學,獨特的雙推桿遙控方式,遙控器上的兩個推桿各控制左右兩個動力輪,使得車的轉彎半徑更小更靈活,並且在車行進時同時開啟掃盤清掃和翻斗遙控成為現實,掃盤啟動時也會發出悅耳的音樂聲,掃盤在轉動的同時還會左右晃動,車身後部的工作廂內放有一直可滑動並可開啟蓋子的垃圾桶,垃圾桶還可以取出,翻斗可以獨立遙控,操作室車門可開,遙控距離在城市中超過30米,空曠地區更可達到50米以上,操控靈活方便,光亮的車身漆面,做工一流,使用工業包裝ni - cd電池組作為動力源,可反復充電300次以上。
  4. Inspect fire protection equipments for power supply room and emergency generator room and ensure proper operation of all equipments and system

    檢查配電室及發電機房消防設備情況並保持完好狀態。
  5. Abstract : based on the current environment for mobile communications equipment control system problem analysis, mobile communications equipment with its own characteristics, the use of mobile communication system of communication resources from the monitoring system in principle, environment and the power supply and other related monitoring of the collection, was the setting up base stations and other areas, the mobile communications emergency room surveillance system programs and the realization of the program based on the specific application

    摘要:本文通過對當前移動通信機房環境監控系統存在問題的分析,結合移動通信機房自身的特點,利用移動通信系統的通信資源,從監控系統的實現原理,環境和動力源等相關監控量的採集,基站側設置等方面進行分析,提出了移動通信機房應急性監控系統的實現方案以及基於該方案的具體應用。
  6. The communication and automation control room of the china research institute of electric power automation applies the xbrothers security and facility control system which includes : the air conditioning control system, ; the ups control system ; the leaking control system ; the electric power supply system ; the temperature and humidity control system ; the video surveillance system ; the access control system ; the ventilating control system ; the fire alarm system ; the intruder alarm system ; the internet network system and ; the communications management system

    系統將通信機房和自動化機房內包括:空調監控系統ups監控系統漏水監控系統機房配電系統監控系統機房環境溫濕度監測系統視頻監視系統門禁監測系統新風機監測系統煙霧報警監控系統報警系統web瀏覽系統通信管理站系統等設備系統在同一系統平臺上集中監控管理。
  7. The central control room of the local power supply bureau is built in the guangzhou power supply corporation building in the south er road, tianhe district. it adopts the xbrothers professional security and facility control system

    廣州市供電局機房位於廣州天河南二路廣州市供電局辦公大樓內,其機房設備集中監控系統採用我司自主研製的
  8. A new drainage way with floor descended is introduced which solves the problem of seeper drainage. ( 3 ) fire water supply systems of high - rise residential buildings in this chapter, the requirements on fire water supply systems of common high - rise residential buildings and of business - living buildings are compared. fire water supply systems of high - rise residential buildings including their facilities installation of hydrant systems, water supply of sprinkler systems, sprinkler systems of garage and power room and reservoir designs are analyzed and summarized

    ( 3 )高層住宅消防給水系統對高層普通住宅和商住樓在消防給水系統上的要求進行比較,從消火栓給水系統設施設置、自動噴淋滅火系統供水方式、車庫和發電機房滅火系統和貯水池等方面對高層住宅消防給水系統進行分析和總結,探討安全可靠、經濟實用的系統做法,以供今後類似系統設計參考。
  9. The china before reforming and opening, goods production and sale are make a plan by the government, next company foundation plans production, supply power very low, so customer deals in the market in be in inferior position position, kan price capacity is very small, the room that commodity can offer an alternative is very little, and often need to rely on bill to buy goods

    改革開放前的中國,商品生產和銷售都是由政府制定計劃,然後企業根據計劃生產,供給力很低,所以消費者在市場交易中處於劣勢地位,侃價能力很低,商品可供選擇的餘地很小,而且經常需要靠票據來購買商品。
  10. Also its equipment environment is poor, and the power supply and grounding conditions cannot even begin to compare with those in the machine room

    以太網接入網路層次復雜,而且大部分設備靠近用戶,設備環境較差,電源、接地都不能與機房相比。
  11. ( 3 ) fire water supply systems of high - rise residential buildings in this chapter, the requirements on fire water supply systems of common high - rise residential buildings and of business - living buildings are compared. fire water supply systems of high - rise residential buildings including their facilities installation of hydrant systems, water supply of sprinkler systems, sprinkler systems of garage and power room and reservoir designs are analyzed and summarized. safe and economical systems are discussed as a reference to similar systems

    ( 3 )高層住宅消防給水系統對高層普通住宅和商住樓在消防給水系統上的要求進行比較,從消火栓給水系統設施設置、自動噴淋滅火系統供水方式、車庫和發電機房滅火系統和貯水池等方面對高層住宅消防給水系統進行分析和總結,探討安全可靠、經濟實用的系統做法,以供今後類似系統設計參考。
  12. Year of china digi tal entertainment expo & conference will obtain hall 1 and hall 2 which is 11, 500 sqm each, pillar - free and 11 meters high limits will give more room to exhibitors for booth design. supply canals underneath the floor connected directly to the booths, providing on - site all necessary utilities including power, gas, water, compressed air and various modern telecommunications including isdn, adsl, wireless broadband network and satellite tv

    第二屆中國國際數碼互動娛樂產品及技術應用展覽會將使用面積為11500平米的一號、二號展館。展館為無柱式結構,凈高度11米,展館地槽內鋪設有後勤供應管道,直接連接展位,現場提供所需的電力、壓縮空氣和各種現代化通訊設施包括isdn 、 adsl 、無線寬帶網和衛星電視。
  13. 2500 kva transformer capacity, 5 units, electric power equipment capacity 4, 900kva, monitor construction, total 2, 000 spots, clean room construction - clean room class 1, 000, air system construction - total 2, 396 rt, ice - storage construction - total 12, 000 ton hr, water discharge - supply construction, fire system construction, weak electricity construction, steam construction, and nurse call

    無塵室工程無塵室等級class 1 , 000空調工程共2 , 396rt儲冰工程共12 , 000ton hr給排水工程消防工程弱電工程蒸氣工程nurse call
  14. This text through leading into and exchange room power, environment concentrate on administrative system of controlling, it thus can realize supply and possess last state at real - time watch - dog at modernized requirement communication, it is expected that takes place, fix a breakdown, write down and deal with the relevant data, such as integrate management functions, etc. have economized the attendant ' s works and improved the dependability that the power equipment runs, have guaranteed that the security of the communication network is unblocked, it is on duty to realize little people or nobody

    本文通過引入交換機房動力、環境集中監控管理系統,從而實現現代化通信要求的電源供應應具備實時監控設備運行狀態、預期故障發生、迅速排除故障、記錄和處理相關數據、進行綜合管理等功能。節約了值班人員的調度,提高了動力設備運行的可靠性,保證了通信網路的安全暢通,實現了少人或無人值守。
分享友人