power-plant distance 中文意思是什麼

power-plant distance 解釋
發動機距飛機對稱面的距離
  • power : n 1 力,力量;能力;體力,精力;(生理)機能;〈常 pl 〉才能。2 勢力,權力,權限;威力;政權;權...
  • plant : n 1 植物,草木 (opp animal); 草本;〈商用語〉樹秧,苗木。2 莊稼,作物,收獲;(植物的)生育。3 ...
  • distance : n 1 距離,路程。2 遠隔,遠離;遠處,遠方。3 (時間的)間隔,長遠,長久。4 懸殊。5 隔閡,疏遠。6 ...
  1. It has the remarkable characters of the limited recourse or without recourse and financing besides the balance sheet. it can avoid the trouble to get the domestic credit and to finance from the international capital market for the capital - intensive project. so it has much attraction for these large - scale projects of infrastructure of power plant, highway, railway, airport, water plant and the long distance transmission pipe, etc. which urgently needs to invest and at the same time be limited by the shortage of the capital

    Bot投資方式具有項目融資的典型特徵, bot項目是項目融資的一種特定方式,它具有有限追索權或無追索權和資產負債表外融資等顯著特徵,可以避開國內信貸的困難,從國際金融市場上為資本密集型投資項目籌集資金,因而對于亟需加大投入、而又受到資金短缺制約的電廠、公路、鐵路、機場、水廠及長距離輸水管道等大型基礎設施項目具有很大的吸引力。
  2. Application of double - socket pipe ash long distance transportation in thermal power plant retrofitting projects

    雙套管長距離干灰輸送技術在火電廠技改工程中的應用
  3. The burners of 220 t / h boiler in henan shenhuolv power plant were retrofitted by using the pulverized coal burners with stabilized - firing cavity and cutting down the distance between up - primary air and down - primary air etc. technologies, thus the boiler was successfully converted from originally designed burning high calorific value coal to low calorific value coal, the boiler could operate stably at 50 % load without oil - firing aid and the thermal efficiency of boiler reached 89 %

    摘要採用穩燃腔煤粉燃燒器並集中布置上、下一次風等技術對河南神火鋁電廠220t / h鍋爐燃燒器進行改造,成功地將該爐原設計燃用優質煤改燃為普通煤,並取得了改造后50 %負荷可無油穩定運行,鍋爐熱效率達到89 %的良好效果。
  4. Now the diffuse earthquake has been used in the earthquake hazard analysis for the nuclear power plant. so we collect some records from the small - moderate earthquakes with magnitude between 4. 0 - 6. 5 and distance from the source less than 70 km. then we develop the attenuation laws of these earthquakes expecting to reflect the attenuation laws of the diffuse earthquakes

    通常為近源中小地震的彌散地震影響是核工程安全性評價中的重要內容,為滿足核工程地震安全性評價工作的需要,本文選取了一些震級介於4 . 0 ? 6 . 5之間,距離小於70km的中小地震的近場記錄,對這些地震的衰減規律進行了研究。
  5. This paper analyses current situation of chp and situation of development, use evaluating energy utilization - - based on electricity comparing with state calculated method - - based on heat, calculates the operating data of baotou second thermal power plant heat supply system , extends the study of heat supply performance to heat net and heat consumer, synthetically analyses heat load characteristic 、 pipe net property and heat supply distance witch effect heat supply cost. the paper studies the thermal power performance of thermal power plant total energy system, discuss heat supply cost which effect the development of chp

    本文對熱電聯產的現狀及發展情況進行分析,採用能源利用系統性能評價指標體系及其評價指標? ?電量法與國家目前採用的法定計量方法? ?熱量法進行比較,通過對內蒙古包頭第二熱電廠供熱熱源系統及供熱熱網系統的熱電聯產運行數據進行分析計算,將供熱過程的熱力性能研究延伸至熱網和熱用戶,分析用戶終端的能源利用情況,針對內蒙古地區主力機組和地區條件,綜合分析了熱負荷特性、管網性能及供熱距離對供熱成本的影響,研究了熱電廠總能系統的熱力性能,對困擾熱電聯產的供熱成本進行了探討。
  6. Practice of application on two boilers in rizhao power plant shows that the adjustment of detection distance not only can solve the problem of somewhat low indicating value for very few flame detectors, but also can save large amount of fuel oil used for stabilizing combustion, having remarkable economic benefit under condition of stable ignition and combustion for pulverized coal and air flow

    日照電廠2臺鍋爐的應用實踐表明,在煤粉氣流穩定著火燃燒的情況下,調整火檢的檢測距離不僅可解決個別火檢指示值偏低的問題,而且可節省大量的穩燃油,經濟效益顯著。
  7. On the base of the above results, chapter five describes the method on how to design and realize the distance education system of ship power plant based on microsoft web server iis and the database server sql server 2000

    在以上研究的基礎上,第5章描述了基於微軟的web服務器iis和數據庫服務器sqlserver2000的船舶動力裝置遠程教學系統的設計與實現方法。
  8. The influence of both synchronous generator and the distance from local power plant to load bus on load modeling are analyzed. when the influences are not negligible, the composite induction motor load model can not effectively describe the actual load. besides, the identifiability in this case is analyzed

    分析了同步發電機在綜合負荷中所佔的比例、地方發電廠離負荷母線的距離對負荷建模的影響,指出當同步發電機影響必須計及時,通常的感應電動機綜合負荷模型就不能正確描述區域負荷,並對由此引起的可辨識性及建模問題作了分析。
分享友人