primary cable 中文意思是什麼

primary cable 解釋
供電電纜
  • primary : adj 1 第一的,最初的,初級的;初等的;基本的;基層的。2 主要的,為首的,第一位的。3 原始的,根本...
  • cable : n 凱布爾〈姓氏〉。n 1 【造船】錨鏈,錨索,(周長10英寸以上的)左捻三根三股索;粗索,巨纜;鋼絲繩...
  1. Aluminum - polyethylene primary covering used as the sheath for aerial cable

    用作高空電纜的外殼,主要材料是鋁聚乙烯。
  2. The system hardwire includes : flexible vehicle management system architectures, fiber optic cable plants, active hand controllers, primary flight control computers, optical mechanizations and smart actuators

    同時還介紹了一單通道主飛控系統的地面演示和一副翼配平控制系統的飛行演示。
  3. It is only using one high voltage cable to serve as the common one - turn primary winding for all the output transformers. in addition, the isolation voltage level for the transformers can be made very high

    使用超高壓絕緣的電纜線作為所有輸出變壓器單匝的原邊繞組,電源輸出之間的隔離電壓可以達到相當高的等級。
  4. And in combination with cable replacement engineering of sichuan qianwei bridge, based on the bridge elevation and cable forces measured before cable replacement started, using finite element software bsas developed by southwest jiaotong university build analysis modeling, by means of cable forces adjustment and so on to make the cable forces of modeling approach the cable forces measured before cable replacement started, according to the scheme of primary design, aimed at cable replacement process, simulation analysis is done and get the calculated results

    然後以四川犍為岷江大橋換索工程為背景,以換索前實測的索力和線形為換索設計基準,應用西南交通大學開發的橋梁結構分析軟體bsas建立換索分析模型,通過調索等技術手段使模型索力與換索前實測索力逼近,以此為換索的出發點,按原換索設計的方案與工序,對換索進行全過程分析,得到換索完工後的計算索力和線形。
  5. How to establish primary prestress value of the cable is researched in the article

    在本文中,研究了索的初始預應力值的確定。
  6. Students from conservative baptist lui ming choi primary school acted as the steel cable of the tsing ma bridge and used chairs to imitate vehicles on it

    浸信宣道會呂明才小學上午校同學以椅子作道具,扮演青馬大橋上的車輛;兩旁為同學扮演的青馬大橋鋼纜。
  7. Shaped charge on the counterbalance cable, two on the primary and secondary brakes

    平衡纜繩上裝有炸藥主副剎車上應該還有兩個
  8. Aiming at the requirement of electric control system of wire cable belt of coal mine, it used 80c196 single - chip microcomputer system to reform primary analogous regulating system, which satisfied the requirement of electric control system and realized the purpose of saving energy

    摘要針對煤礦鋼纜膠帶電控系統的要求,應用80c196單片機系統改造原來模擬調節系統,滿足了鋼纜膠帶電控系統的要求,實現了節能的目的。
  9. In this thesis, based on cable forces optimization theory, utilizing minimal remnant energy principle, the theory how to improve bridge shape and internal forces of primary bridge by replacing cables is founded

    本文首先以索力優化理論為基礎,利用最小余能原理,建立了通過換索改善結構線形與內力的理論和方法。
  10. Compared with the primary design results, the calculated results in this thesis coincide better with the measured results after cable replacement is finished, which demonstrates that simulating the actual status of primary bridge accurately is very important to cable replacement design

    與原設計結果相比,本文得到的索力與線形更接近換索后實測的索力與線形,表明準確地模擬結構換索前的線形與索力(內力)狀態對換索設計至關重要。
分享友人