process scheduling algorithm 中文意思是什麼

process scheduling algorithm 解釋
進程調度演算法, 過程調度演算法
  • process : n 1 進行,經過;過程,歷程;作用。 2 處置,方法,步驟;加工處理,工藝程序,工序;製作法。3 【攝影...
  • scheduling : 編排;調度
  • algorithm : n. 【數學】演算法;規則系統;演段。
  1. Chapter 4 studies scheduling algorithm of the core node to implement on single adsp2191. the result shows that a single adsp2191 chip can ’ t satisfy the bhp processing delay request and parallel processing is inevitable. chapter 5 primarily studies the core node ’ s scheduling algorithm with many dsp parallel process. details of lauc - vf scheduling algorithm analysis data flow organization and mission distribution are argued. the results of software simulation and hardware debugging indicate that many dsp parallel processing is effective and coincident with the system ’ s demand

    結果表明單片adsp2191晶元不能夠滿足核心節點對bhp的實時處理要求,必須多dsp并行處理。第五章研究了核心節點調度演算法的多dsp并行處理。對多bhp批調度演算法的實現進行分析,探討了多bhp處理任務的的劃分和分配方案;多dsp間數據通信和傳輸的dma實現;最後對多處理器并行的處理時間進行模擬測試分析。
  2. Finally, jinduicheng mo. company open - pit is quoted as an instance for building mine transportation vechile scheduling system model, and according to the model, adopt genetic algorithm to study the optimization of mine transportation vechile scheduling system. a rational project is given to this problem, the paper also analysized the optimial design of mine transortation vechile scheduling, the model offering in this paper, convergence of optimal algorithm and data bank management, and transportation project of minerals and disposals is optimized, which realize the decision of transportation project and data visibilization, and wich improves the science and information process of transportation department management

    最後,論文以金堆城鉬業公司露天礦為例建立礦山運輸車輛優化調度模型,結合所建立的礦山車輛優化調度模型,採用遺傳演算法對礦山運輸車輛系統進行優化研究,為其提供合理的體系方案。並對礦山車輛優化調度系統設計進行了詳細分析,提出的礦山車輛優化調度系統,集優化演算法與數據庫管理分析於一體,進行礦巖運輸方案的優化,實現調度方案決策的可視化、運行數據的可視化,促進運輸部門管理的科學化、信息化進程。
  3. Although the current scheduling rules and algorithm were able to avoid regular manufacturing resource conflicts, strategies to resolve manufacturing resource conflicts were also needed when unexpected errors and faults occured in system operation process

    摘要目前調度規則和演算法雖然可以避免常規的製造資源沖突,但是當系統運行過程中出現突發事件時(如設備故障、急件插入等) ,需要利用相關策略消解製造資源的沖突。
  4. Based on previous heuristic scheduling algorithms, multi - object scheduling of time and resource costs is implemented by introducing the conception of resource costs into the net, considering time and resource costs synthetically in the process. by tracing the virtual costs of machines in the algorithm, the using costs of those heavy load machines are increased dynamically and their chances of being used again are reduced, which results in a relative balance of machines loads in the scheduling result

    在前人啟發式調度演算法的基礎上,通過在網中引入資源成本的概念,在演算法的執行過程中綜合考慮時間成本和資源成本,實現了資源成本與時間成本的多目標調度;通過在演算法中對各機器虛成本的跟蹤,動態增加當前系統中負載較大機器的使用成本,降低其再被使用的機會,使得調度結果中的各機器負載能相對均衡。
  5. Based on the model, combined with object weight, a genetic algorithm for manufacturing grid resources scheduling process was designed

    基於多目標優化數學模型,結合用戶對目標權重的要求,設計了塞于遺傳演算法的製造網格資源調度過程。
  6. Because of the defect of long running time and big complexity in the classical job - shop scheduling algorithm, the paper brought forward an intelligent optimization algorithm based on rule ; scheduling process is divided to primary process and optimization process. through the method of ahp ( analytical hierarchy process ), the effect is researched between several rules and estimate. moreover, the results of ahp are used as a measurable standard to scheduling results

    本文針對傳統車間作業調度演算法運行時間長,復雜度大的缺點,提出了基於規則的智能優化調度演算法,將排序的過程分為初始排序與優化排序;基於多目標決策的層次分析方法,得出了各種規則與系統評價指標之間的影響度,其結論為生產計劃方案的選擇提供了定量的參考依據。
  7. A genetic local search algorithm for the parallel machine batch process scheduling problem

    并行機間歇過程生產調度的遺傳局部搜索演算法
  8. As an example, the parallel machine scheduling problem is mapped on a non - constrained matrix construction graph, and a aco algorithm is proposed to solve the parallel machine scheduling problem. comparison with other best - performing algorithm, the algorithm we proposed is very effective. the finite deterministic markov decision process corresponding to the solution construction procedure of aco algorithm is illustrated in the terminology of reinforcement learning ( rl ) theory

    本章最後提出了解決并行機調度問題的蟻群演算法,該演算法把并行機調度問題映射為無約束矩陣解構造圖,並在演算法的信息素更新過程中應用了無約束矩陣解構造圖的局部歸一化螞蟻種子信息素更新規則,與其他幾個高性能演算法的模擬對比試驗證明這種方法是非常有效的。
  9. Thirdly, integrating bell - type scheduling investigation of domestic and overseas documents, the paper defines optimized scheduling production of bell - type annealing process as the problem of parallel machine scheduling with resource - constrained and multi - step working procedure, whose optimized function of objective function is given also. furthermore, the author constructs bell - type optimized scheduling model by means of the way combing discrete event simulation with algorithm of intelligent optimization

    本文在綜合國內外對于罩式爐調度研究的基礎上,將罩式爐退火過程優化排產定義為資源受限多步工序并行機器調度問題,並定義了優化目標評價函數;將面向對象的離散事件建模模擬方法和智能優化方法相結合建立了退火爐優化排產模型。
  10. The implementation of and performance analysis on the simulation of the process scheduling algorithm

    進程調度演算法模擬實現與性能分析
  11. A large mount of experiments had been performed to obtain a range of main control parameters settings for proposed algorithm. csga for task matching and scheduling is not scalable for multiple independent decomposable tasks. the computational model of cooperative coevolution is addressed, which simulates the process of natural coevolution among species

    針對傳統單種群遺傳演算法求解獨立多任務分配與調度問題的伸縮性差的缺點,本文基於多物種共同進化的生物學背景,從理論上探討合作式共同進化計算模型的機理。
  12. A vs / dr or vs / tun load balancer acts as a single entry point of the system, and distributes the incoming requests to a number of ktcpvs distributors. ktcpvs distributor queries the central content location service to decide the right backend server to process the request, and then forwards the request to that server. we give a locality - based least loaded ( lbll ) scheduling algorithm

    一個vs dr或vs tun調度器作為系統的單一入口點,將請求分發給一組ktcpvs分發器, ktcpvs分發器通過使用中心的內容位置服務,確定處理該請求的後端服務器,再將該請求分發到後端服務器;並提出基於局部性的最小負載( lbll )調度演算法。
  13. In the interactive rendering process, a data block scheduling algorithm is used to realize the view - dependent paging

    在給定參數的控制下,將多解析度數據分為內外存兩部分。
  14. Agv ( automated guided vehicle ) optimization is a typical np problem, in the course of initial group generation, this article applied accumulator process, crossover operator based continuous insertion heuristic mode, and push - connect - exclude method. according to stacker running process and characteristics, stacker optimization was devided into two parts, the first one was shelves number optimization, the second one was travel scheduling problem. finally, this article written genetic algorithm program based on c

    Agv的優化調度屬于典型的np問題,在初始群體的產生中,採用聚加過程,並建立了可行插入的條件;提出了基於連續插入啟發式的交叉運算元;採用了推?銜接?排除過程來使任務的滿意度達到最佳;針對堆垛機的運行過程,建立了數學模型,並依據其運行特點,把堆垛機的優化分為兩部分,一是針對庫位號的優化,改變傳統的庫位號排列方式,利用遺傳演算法建立起比較合理的庫位號排列順序;二是把堆垛機的運行線路簡化為旅行商問題,並做了適當的修改。
  15. A study on modeling, scheduling and optimal control problems for a class of hybrid manufacturing systems is investigated. in this framework, the discrete entities have a state characterized by a temporal component whose evolution is described by event - driven dynamics and a physical component whose evolution is described by continuous time - driven dynamics, thus it is a typical hybrid system. not only the optimal control for manufacturing process like that discussed in many references but also the optimal machining sequence are considered in this paper. the whole problem is solved by a two - level optimization method : at the inner loop, for any given machining sequence of the jobs, the optimal control for manufacturing process is considered ; while at the outer level, an improved genetic algorithm is used to decide the optimal machining sequence of a batch of jobs to be processed. finally, some examples are given to illustrate the validity of the algorithm

    研究了一類單階段混合製造系統的建模、分析與調度問題,這類系統既包含離散事件動態,也包含連續時間動態,前者用排隊網路描述,後者用微分方程描述.不僅考慮了a這類系統的最優控制問題,而且考慮了工件進入生產線的最優時間,並用一個復雜的優化模型描述,同時給出了一個兩層優化方法,內層給出對給定工件序列的最優控制,而外層用一改進的遺傳演算法求解工件進入生產線的最優時間序列.若干模擬實例說明了演算法的有效性
  16. In this paper an algorithm for timetable problem, which can meet various needs of timetable in real application, was promoted by mathematical modeling and analyzing its common characteristics with process scheduling

    摘要從分析進程調度與時間表問題的共性、探索時間表求解的數學模型出發,介紹了一種時間表問題求解的演算法,並分析演算法復雜度。
  17. Based on genetic algorithms, a new scheduling algorithm with multiple process plans and no set up time is proposed, and the algorithm is compared with another scheduling algorithm proposed by nasr and elsayed

    給出了基於遺傳演算法的無輔助加工時間多工藝加工計劃調度演算法,通過與國外學者提出的演算法相比較,證明了該演算法的正確性和優越性。
  18. Then, considering the practical production, machining time and set up time are detached, a novel scheduling algorithm with multiple process plans and set up time is addressed, and the result shows the proposed algorithm is well which is compared with no set time scheduling algorithm

    在此基礎之上,結合實際生產,區分了工件輔助加工時間和加工時間,給出了有輔助加工時間的多工藝加工計劃調度演算法,通過與前一演算法的比較,證明了該演算法的優越性。
  19. Using the work flow process component ’ s executing in cowe as mainline, the functionality and structure of the model ’ s eight modules and five exterior interfaces are depicted. a scheduling algorithm about executor ’ s executing the segments is innovatively presented. the algorithm uses the fcfs ( first come first served ) strategy combined the preemption strategy with time - out and out - of - queue

    以工作流流程構件在cowe中的執行為主線闡述了cowe的八個主要部件和五個外部介面的功能和設計結構,創建性地提出了cowe的執行器對執行片段的調度演算法,該調度演算法的思想是先來先服務( fcfs )的調度策略結合超時超長剝奪策略的調度演算法。
  20. A production logistics optimal scheduling method for process industries is suggested by using a multi - object and multistage optimal algorithm

    在此基礎上,提出了流程工業生產的物流平衡調度方法。
分享友人