public grid 中文意思是什麼

public grid 解釋
公用電網
  • public : adj (opp private)1 公共的,公眾的,公用的;人民的,社會的,國家的;政府的,公營的,公立的。2 (...
  • grid : n 1 格子,格柵。2 (蓄電池的)鉛板。3 【無線電】柵級。4 鐵道網;【電學】電力網;〈英國〉(全國)...
  1. In fact, stuff quality of space grid structures member, manufacturing accuracy and construction management are major factor that influence development with high quality and high - level of space grid structures, space grid structures commonly with large span, and more is public buildings, important buildings, mass man under it, dearness equipments on it, erecting at high level, hardest strengthen when happen problems

    事實上,當前網格結構構件的材料質量,加工精度以及施工管理是影響網格結構高質量高水平發展的主要因素。網格結構一般跨度較大,而且多為公共建築,重要建築,下面人員眾多,設備貴重,網架建在高空,出了問題極難加固。
  2. With the development of our society, more and more long span and large column - grid frame is to be applied in house building, public building and factory building

    隨著社會的不斷進步,越來越多的住宅建築、公共建築、工業廠房中要求使用大跨度、大柱網結構體系。
  3. In 2005, eph will carry out the overall plans mapped out by state grid corporation and central china grid company in an all - round way, follow the development target for a modernized company with strong power grid, excellent assets, service and performance as well as the working ideas for focus on development, management and staff and building a first - class company, take the activity of " management foundation year of standard comparing among enterprises in the same sector " as the major task to strengthen safety production and management, construction of internal quality management and public image, and management of assets operation, correctly deal with the relationship among reform, development and stability, insist on human - centralized development, endeavor to innovate and fulfill the annual work and development plant targets during the 10th five - year plan period and make contributions to henan economic development and grow - up of the central part of china

    2005年,公司將全面落實國家電網公司和華中電網有限公司的總體部署,緊緊圍繞「一強三優」現代公司發展目標和「三抓一創」工作思路,以「同業對標管理基礎年」活動為主題,強化安全生產管理,強化內質外形建設,強化資產經營責任,正確處理改革、發展和穩定的關系、堅持以人為本,努力開拓創新,全面完成年度工作任務和「十五」發展計劃目標,為河南經濟發展和中原崛起作出新的貢獻。
  4. Automatic disconnection device between a generator and the public low - voltage grid

    發電機和公共低壓電網之間的自動斷開設備
  5. The paper brings out a few of measures to save energy including rational planning of grid, improvement of line loss management, public line, reactive compensation on - spot, promotion of single - phase transformer and elimination of timeworn facilities, etc

    提出了多種途徑的節能措施,包括合理規劃電網、加強線損管理、完善公用線路、公用臺變無功就地補償、推廣單相變、淘汰落後用電設備等。
  6. The grid application needs to handle any and all requirements for authentication, access control, data integrity, confidentiality of data, and public and private key management

    網格應用程序需要處理所有的認證、訪問控制、數據一致性、數據保密性、公鑰私鑰管理等方面的需求。
  7. We believe there are important aspects of the grid that should form the subject of public discussion, which will speed the entry of new, clean decentralised generation technologies

    我們相信公眾應參與討論有關輸電網路的重要議題,從而加快引進嶄新潔凈和非集中的發電技術。
  8. To assist the public to better understand the technical issues and the application procedures relating to grid connection of small scale renewable energy installations, a working group was formed to develop a set of guidelines which were published in the " technical guidelines on grid connection of small - scale renewable energy power systems ". memberships of the working group included power companies, professional institutions, consultants and contractors, property developers, renewable energy interest groups etc

    為了讓公眾更了解與市電接駁的技術事宜和向電力公司申請並網的程序,我們成立了一個工作小組,制訂一本名為《小型可再生能源發電系統與電網接駁技術指引》的刊物,該工作小組的成員來自電力公司、專業學會、顧問公司及承建商、地產發展商、關注可再生能源的組織等。
分享友人