public project 中文意思是什麼

public project 解釋
公共工程
  • public : adj (opp private)1 公共的,公眾的,公用的;人民的,社會的,國家的;政府的,公營的,公立的。2 (...
  • project : vt 1 投擲,拋出;發射(炮彈等);噴射。2 使突出,使凸出。3 設計,規劃,計劃,打算,籌劃。4 投影;...
  1. In toronto, sessions were held on topics such as public - private partnerships project finance, site remediation technologies brownfield redevelopment, waste hazardous waste technologies, renewable alternative energies technologies, environmental management systems, water and waste water technologies among others

    北電網路是世界的先進電訊產業先驅者之一。目前他們的服務項目有:電訊相關設備與全面性的專業技術,包括了全球現有的三種先進無線技術gprs cdma2000與umts 。
  2. The compound project that the public - benefit project and the real estate project integrated together means consociation of the government and enterprise, the resources shared, the advantage extended with each other, risk and responsibility burdened

    公益項目與房地產項目相結合的復合項目實現了政府和企業的聯合,資源共享,優勢互補,風險共擔,克服了公益項目或房地產項目單獨運作存在的問題。
  3. Whereas " build - operate - transfer ", called bot mode, has been successfully adopted in some foundation fields, such as public traffic, electric power, etc. this article is based on the study of yishui sewage treatment plant application of bot some constructive and valuable recommendations presented may be helpful to other foundations and environmental fields. this article has analyzed the feasibility of yishui sewage treatment plant application of bot, then made a blue print which include construct project item company project financing project, running project and the analyse of benefits to society and economy. the pivotal portion - concessionary agreement, is also studied in this article

    在借鑒國外城市基礎設施bot模式和國內電廠、高速公路等建設項目bot模式的基礎上,總結國內部分採用準bot模式建設污水處理廠的經驗,根據國家目前的環境政策和法律、法規要求和沂水縣社會經濟發展狀況,運用了經濟學、技術經濟學及管理學的一般原理,對沂水縣城市污水處理廠採用bot模式建設進行了方案設計和分析,包括項目建設方案、項目公司組建方案、融資方案、運行方案、項目經濟效益分析及項目各參與方的經濟效益分析等內容,並對項目關鍵? ?特許權協議的有關內容進行了研究,在特許權協議中,對在實際工作中難以確定的收費價格、發票、付款等具體內容提出了解決思路和辦法。
  4. This unique 12 - school project involved primary and secondary schools in a nutrition and physical activity promotion campaign led by a team of multi - disciplinary experts in nutrition, physical education, public health, pediatrics, midwifery, home economics and education

    參與該計劃共有12間中小學校,由包括了營養學、體育、公共衛生、兒科、婦產科、家政及教育的專業人士組成的隊伍所帶領的營養及運動推廣活動。
  5. The system of public bidding for project

    充分發揮貨幣政策的作用
  6. The paper makes a social assessment of a typical public project - migration and anti - flood project in puling city by using analytic hierarchical and fuzzy synthetic process

    論文採用多層次模糊綜合評價分析法對涪陵城區移民遷建防護工程這一典型公共工程項目進行了社會評價分析。
  7. The former mostly includes finance trench, which consists of urban maintenance and constructive tax, add - ons of public utility, urban land - using tax, the debt of local government, remise of urban state - own land - using right and special national debt capital, and so on ; administrative charge trench, which consists of apportion, raising the price of urban infrastructure products and services, and so on ; practicality investing trench, which mostly consists of corresponding capital for urban infrastructure provided by real estate exploiters ; other financing trenches, which consist of time - limiting remise of operating authority on urban infrastructure section, introducing into foreign capital, short term loan of civil financing institution, and so on. the latter includes the innovation on the main investors, which consist of the anticipation of civilian capital and other non - financing institutions, and the innovation on financing tools, which consist of project financing, investment funds on industry, municipal bonds and initial public offering, and so on

    前者主要指以政府作為投資主體下的各種融資工具,包括財政稅收渠道(包括城市維護建設稅和公用事業附加、城鎮土地使用稅、地方政府債務、城市國有土地使用權有償出讓、國債專項資金等) ;行政收費渠道(包括攤派、提高基礎設施產品和服務的價格等) ;實物投資渠道(主要是讓房地產開發商為城市基礎設施提供配套資金) ;其它融資渠道(包括市政設施部門專營權有限期出讓、引進外資、國內金融機構的短期貸款等) ;後者則包括融資主體的創新(民間資本的參與以及其它非銀行金融機構的介入)和融資工具的創新(項目融資、產業投資基金、市政債券、股票上市等) 。
  8. And now i set on foot my first project of a public nature, that for a subscription library.

    我於是著手實施第一個帶有公共性質的計劃:成立訂閱圖書館。
  9. The induction of our sale, installation is automatic door series product, breed is all ready, norms diversity, construction is careful, vestibular design program innovates, the price is reasonable, after service system is perfect, get the praise highly of broad user and love, the product applies extensively at each big field : line of business of hotel of system of financial system, wealth tax system, public security organs, real estate, guesthouse, shopping centers, wholesome system, education system, newsletter ; participate in early or late completed numerous and major project : na yuan restaurant, overseas chinese restaurant, baud is graceful center, elegant hospital of dagger er group, ao kesi group, golden field group, green city group, shen zhou group, yin continent people, yin ; be appointed to be door of linkage of exchequer special type to order an unit surely by bank of zhejiang province people

    我們銷售、安裝的感應自動門系列產品,品種齊全,規格多樣,施工精細,門廳設計方案創新,價格合理,售後服務體系完善,深受廣大用戶的推崇與喜愛,產品廣泛應用於各大領域:金融系統、財稅系統、公檢法系統、房地產業、賓館酒店、購物中心、衛生系統、教育系統、通訊業等;先後參與完成了眾多重大工程:南苑飯店、華僑飯店、波特曼中心、雅戈爾集團、奧克斯集團、金田集團、綠城集團、申洲集團、鄞洲人民醫院、鄞洲第二人民醫院、歐尚購物中心、麥德龍購物中心、天一廣場、萬達廣場、鄞州體育館、寧波大學、諾丁漢大學、慈溪市政府、北侖區行政中心… …被綠城集團、雅戈爾集團、奧克斯集團、民生銀行、深發銀行、交通銀行、光大銀行等指定為定點服務單位;被浙江省人民銀行指定為金庫特種聯動門定點單位。
  10. Public invited to take part in forums and charrettes for " harbour - front enhancement review - wan chai, causeway bay and adjoining areas " project

    房屋及規劃地政局局長孫明揚出席立法會規劃地政及工程事務委員會會議的發言全文只有中文
  11. Public invited to take part in forums and charrettes for " harbour - front enhancement review - wan chai, causeway bay and adjoining areas " ( her ) project

    房屋及規劃地政局局長孫明揚出席香港電臺千禧年代-與司局長對話后與傳媒的答問全文(中文部分)
  12. Management cost includes 10 % of employee salary, rental, public utility cost, monthly rent for adsl special line, fixed assets depreciation and project launching amortization cost, etc

    管理開支包括雇員工資、房租、公用事業費、 adsl專線的月租、固定資產折舊和項目實施的分攤等的10 % 。
  13. Testers can register for these projects, in addition to or instead of the organization ' s public project

    測試人員可以注冊這些項目,無論它會不會參加正式運行的項目。
  14. Research on the decision - making support mode of public project based on the soft system thinking

    基於軟系統思想的公共項目決策支持模式研究
  15. Finally, the article gives the frame of decision - making support mode of public project based on the soft system thinking, and then analyzes the implementation steps

    最後提出了基於軟系統思想的公共項目決策支持模式框架,並進一步分析了其實現步驟。
  16. Secondly, based on the analysis of characteristics, the research considers the decision - making of public project fit to the soft system thinking, and then the possibility of adopting soft system methodology to the decision - making of public project

    其次從分析這些特點出發,認為公共項目決策具有軟系統特點,從而進一步探討軟系統思想在公共項目決策中運用的可能性。
  17. The fiscal policy in the modern meaning started in the 1930s. on practice, roosevelt new policies made a beginning through building public project with fiscal allocations in participating in and solving for employment problem. in theory, expansive fiscal policy of keynesianism established the theoretical foundation in stability economy with fiscal means

    現代意義上的財政政策始於20世紀30年代,實踐上,羅斯福新政中用財政撥款修建公共工程為財政參與解決就業問題開了先河,理論上,凱恩斯的赤字財政政策為用財政手段穩定經濟奠定了理論基礎。
  18. Research on the supervision and management mode of public project

    論政府投資項目建設組織實施方式及其監管模式
  19. Highway is a public project which needs great investment and brings great social benefit

    公路是一項投資大,社會效益也大的公共工程設施。
  20. The writher drew a conclusion that the operation mode is feasible and risky in the operation under the current market situation. the essay is divided into six parts totally. the writer described the background, researching purpose, researching frame and thinking in chapter one ; the writer described and analyzed the public - benefit project operating mode and drew a conclusion that there is the funds, management problem in the public - project operating mode in the second chapter ; the writer elaborated and analyzed the real estate project, get the conclusion that real estate enterprises were restricted by the land and the policy in the third part ; firstly the writer elaborated and analyzed the compound project operation mode, operating mechanism, the operating process of the mode, success factors and risk, secondly the writer made use of the contrast analysis method with two kinds of operation modes, lastly the writer drew a conclusion that mode is feasible, but risky in

    第一部分闡述了復合項目運作模式的選題背景、研究意義、研究框架、研究思路及研究方法;第二部分闡述了公益項目主要運作模式並進行了優劣勢分析,得出公益項目運作模式存在資金、管理及經營問題的結論;第三部分闡述了房地產項目主要運作模式並進行了優劣勢分析,得出了房地產項目運作模式受到土地及政策制約的結論;第四部分首先介紹了復合項目運作模式,其次進行了機理分析,闡述了復合項目運作模式的運作流程,並運用對比分析法與公益項目運作模式、房地產項目運作模式分別進行了對比分析,最後對復合項目運作模式成功要素和風險性進行了分析,闡釋了該模式是可行的,但存在風險;第五部分引用重慶世紀花都項目進行案例研究並做出了實施效果評價;第六部分對全文進行總結並指出了進一步研究方向。
分享友人