rank soil 中文意思是什麼

rank soil 解釋
肥沃的土壤
  • rank : n 1 列,排;【軍事】行列;〈pl 〉陣線,隊伍,軍隊;〈pl 〉士兵,列兵。2 階層,等級,地位;身份;...
  • soil : n 1 泥土,土壤;土質。2 土地,國土。3 滋生地,溫床。4 農業生活,務農。n 1 臟東西,污物,污穢,污...
  1. " prestress anchor ribbed beam support system " is a new practical support technology which came from soil nailing walls system and un - embedded rank of piles with anchors support system that has been used successfully for 4 years by the author and his company named qingdao deep foundation stabilization engineering co., ltd. it " s mechanism is similar to rank of piles with anchors support system that can not be inserted into the bottom of foundation trench, but it " s ribbed beams are used to replace rank of piles made before excavation so the work cycle can be shortened and the support system cost can be reduced ; meanwhile this system maintains the soil nailing wall " s convenience of digging and supporting

    「預應力錨桿肋梁支護技術」是筆者及所在單位歷時四年在土釘墻和無嵌入多錨排樁兩種支護體系基礎上開發應用成功的一種新型實用性支護技術。其支護機理類似於未嵌入坑底的排樁多錨支護,只是由肋梁代替了開挖前施工的排樁從而提前工期並降低支護造價;同時繼承了土釘墻隨挖隨支護的機動靈活性。自1998年至今該技術已在青島、濟南、煙臺等十幾個深基坑和高邊坡工程中成功應用。
  2. We can say that it can develop the usage of soil nailing wall fill the rank of piles disadvantage a bright future of developing and using. the development, application, advantage and disadvantage about the " prestress anchor ribbed beam support system " is introduced in chapter 1 : it " s supporting mechanism and structural feature is introduced and compared with the soil nailing walls and un - embedded rank of piles in chapter 2 ; design and computer steps and more details about the design methods of the support system are introduced in chapter 3 ; the two important parts named draperies and anchors are introduced on their construction technology in chapter 4 ; three foundation trenches " instances with different depth in different soil are showed in the last chapter 5

    本文在第一章概論部分介紹了「預應力錨桿肋梁支護結構」的發展、應用和優缺點;第二章分析其支護機理、結構特點,並與土釘墻和無嵌入排樁多錨支護進行了結構受力對比分析;第三章介紹該支護結構的設計計算方法步驟,詳細介紹了支護結構各部分的設計方法;第四章介紹預應力錨桿肋梁支護系統最重要的兩個部分:帷幕和錨桿的施工技術;第五章介紹了不同土層不同深度的有代表性的三個基坑工程實例。
  3. The behavior of capping beam that joints single rank of piles, which nowadays is widely applied to the construction in china, is complexly influenced by many factors. while conversed continuum beam pattern is primarily adopted in existent design methods to predigest computations, it still lacks of satisfaction as a result that it could n ' t reflect on the variance of piles and the infection of soil

    條形樁基連續承臺梁在我國現代建築工程中應用極為廣泛,其受力影響因素極為復雜,現行設計大多採用倒置的連續梁模式進行簡化計算,其無法考慮基樁的差異性以及地基土體對承臺梁的影響,計算結果難以令人滿意。
  4. The impacts of soil and water conservation on river flow and soil - hydrology of jia - lu - he, tu - wei - he, pian - guan - he and qiu - shui - he catchments have been analyzed by the simulation and on - spot measuring methods according to data of during 1950 ' s to 1990 ' s. the selected catchments of the above four all are in the key area of soil and water conservation on the loess pleatu. the main results are as follows. the trend, reasons and critical year of annual river flow " change have been researched by rank correlation and maximum deviation division

    本文以黃土高原水土保持重點區的佳蘆河、禿尾河、偏關河和湫水河等四條流域為代表,採用定量與定性、模型模擬與實測對比相結合的方法,系統分析了上世紀50 90年代時段內水土保持對河川徑流及土壤水文的影響,取得主要結果如下:採用秩相關和極差分割等定量評價方法,分析了四條支流徑流量變化趨勢、變化原因及發生明顯變化的臨界年份。
  5. The concept of relative yield was used to classify the rank of soil nutrition levels

    利用相對產量概念來劃分土壤養分水平等級。
分享友人