river cable 中文意思是什麼

river cable 解釋
過河電纜
  • river : n 1 河,江。 Rriver Thames 或 the R Thames 泰晤士河; the Hudson R 〈美國〉哈得孫河。 the Rriver ...
  • cable : n 凱布爾〈姓氏〉。n 1 【造船】錨鏈,錨索,(周長10英寸以上的)左捻三根三股索;粗索,巨纜;鋼絲繩...
  1. Yangzhou fukedu hotel is the first express style commercial and tourist hotel, witht the convenient transportation, is located at yangzhou yingbin avenueside jiangyang road and yangzi river road acrossing, eightfold main buildings are opposite new century hotel, the hotel has large - scale parking, medium and small - sized meeting room, multi - purpose hall. moreover, it possesses 88 guest rooms designed by glazing unit window, are equipped with the full facility of 24 - hour hot water, air conditioning, separate bathroom, cable television, ip telephone, broadband internet access, fire and burglar alarm installation. as long as you lodge in yangzhou fukedu hotel, let you feel concise, convenient, confortable, safe and economic

    福客都酒店是揚州市首家快捷型商務旅遊酒店,座落在揚州迎賓大道旁江陽路與揚子江路交叉口處,交通便利,八層主樓與新世紀大酒店遙遙相望,酒店擁有大型停車場中小型會議室多功能廳,客房88間,中空玻璃窗戶, 24小時熱水,設施完善,環境優雅內設單人房標準房套房等,房內配有空調有線電視獨衛ip電話寬帶上網火災及防盜報警等設施一切讓您感到簡潔方便舒適安全經濟,是您及您的貴客下榻休息的理想場所。
  2. 3 after cable duct construction, the permit holder shall reinstate the affected stream bed of ho chung river to its original conditions using natural substratum

    在電纜管道建成后,許可證持有人須用天然底土修復受影響的蠔涌溪流河床,使其回復原貌。
  3. Measurement of the static and dynamic characteristics of the cable stayed pipe bridge over the nanguang river

    南廣河斜拉索跨越管橋動靜特性測試研究
  4. Abstract : this paper expounds the main construction method of west cable tower of chongqing egongyan yangtze river suspension bridge, and gives a detailed description of construction technology of climbing form system with an inner climbing scaffold

    文摘:介紹重慶長江鵝公巖大橋懸索橋西塔主要施工方法,對西塔塔柱內爬架爬模系統施工工藝作了詳細闡述。
  5. Gpr is a newly developed hi - tech survey technique used to detect shallow ground electric differences. we applied gpr to more than 100 projects in zhujiang river delta and hongkong, and obtained good reputations. the application scope involves stratigraphics division, outining of filled stones in the muddly beach, geotechnical prospecting of old wall, karst detecting in the limestone terrain, caving detecting, landslide and slop surveing, the division of wea - thering zone, onion weathering zone, fracture zone and fau - lted zone in the granite area, detecting of buried objects cable, metal nonmetal pipe, channel, air raid she - lter etc. underground in the urban city, archaeology, tracing of orebody, coal measures strata division, testing of the dam and grouting site, quality checking of the surface and foundation of the highway

    的一種高新技術。我公司運用世界最先進的探地雷達設備在珠江三角洲地區和香港開展了百余項探地雷達檢測項目,獲得了良好的聲譽,並被作為深圳市建設局1998年度建設科技成果推廣項目。它主要應用於:山體土石方檢測路基不同回填物界面檢測填海回填物巖溶檢測樁基無損檢測地下管道探測地下隱蔽物探測考古斜坡滑體探測地質結構探測湖底探測高速公路路面及路基檢測。
  6. As an example, the space analysis model about the wuhu changjiang river bridge is done and the internal forces about the wuhu changjiang river bridge due to dead load and lived load are analyzed. 2. the vibration analysis of the long span plate - truss composite cable - stayed bridges

    文中以蕪湖長江大橋為例,建立了該橋的空間有限元分析模型,並重點分析了該橋在自重恆載作用下的結構內力及車輛荷載對橋梁結構內力的影響。
  7. Vxworks has a microkernel and can be cut out as need. it is helpful for developers to design the cable modem firmware using the developping environment and the templates ( for bsp and end ) provided by wind river. in this paper the author analyzes the whole cable modem firmware project based on the conexant cn9414 and vxworks 5. 4, gives the designs for the main functional modules of the cable modem

    Conexant解決方案的軟體應用了windriver公司的vxworks嵌入式操作系統, vxworks具有微內核結構和極好的剪裁性,是當前實時性最好、最為穩定的實時操作系統之一,可以滿足cablemodem的實時性和資源需求,而且在cablemodem固件設計中利用windriver公司提供的豐富的開發模板( bsp和end的開發模版)大大簡化了開發工作。
  8. In this thesis, the construction and monitoring general method of cable replacement work for qianwei minjiang river cable - stayed bridge is introduced firstly, then, using large - scale commercial finite elements analysis software, algor, a space solid model is developed. in order to give attention to internal force and deformation, the thesis simulates the factual situation of the bridge by adding boundary elements. the analyzed items include : cable forces, deflections, stress of box - girder and maximum horizontal deformation of tower under different cable - replacement cases, which can be used to tutor design and construction for other similar works

    本文以犍為岷江大橋換索工程為背景,首先介紹了該橋換索施工與監控工作的大致情況,並應用大型商業有限元軟體algor建立了該橋空間計算模型,建模過程中為了真實地模擬結構換索前的內力狀態,實現內力與線形兼顧,本文使用了「添加邊界元還原結構內力」的方法。
  9. The force control of suspension bridge anchorage cable is the main contents which will be researched. according to the character of suspen - sion bridge anchorage, three questions is solved in this paper on the basis of the construction control experience of the highway bridge of yichang yanzhi river. firstly, an effective method of cable force control is presented in this paper, which has settled the puzzle of cable force accurate operate through fixing a pressure transducer at the behind of the hydraulic jack. secondly, an exactitude calculation model is founded in this paper. in addition the influence of boundary condition, sag, inclination, flexural rigidity and environment temperature to the cable vibration frequency which make the frequency method could be used to the measurement of cable force. in the end of this paper, a control system of anchorage cable force is developed on the basis of the above research. this system is very steady, credible, high precision and convenient. it is a new and credible method to be used to the force control of sus - pension bridge anchorage cable. in this paper, the conundrum of cable force control has been solved. the fruits are very useful to the development of inland suspension bridge

    提出了一種有效可行的錨跨張力控制方法,即通過在油壓千斤頂后加壓力傳感器,並利用單片機技術進行數據採集,解決了懸索橋錨跨索股初張力精確控制的難題;建立了錨跨索股索力的精確計算模型,分析了索股的邊界條件、斜度、垂度、抗彎剛度及環境溫度對索股頻率的影響,解決了弦振法在大跨徑懸索橋索力測試中的應用問題;在上述研究成果的基礎上,研製出了錨跨張力控制系統,該系統具有穩定可靠,精度高,使用方便等特點,它的投入使用將為我國今後大跨徑懸索橋錨跨張力控制提供一種全新的、可靠的手段。
  10. There must be a marine casualty happened every 4 days before 1984, the amount of marine casualty happened at this area corresponds to 1 / 7 amount of the whole changjiang " marine casualty, so mariners gave it a name as " mouth of tiger ". due to the specific geographical condition and the extremely representative vessel traffic management of changjiang yingongzhou channel section, many intelligent people began researching and practicing the vessel traffic management of this changjiang " s down - stream complicated channel section from 1980s, at dec 15th 1984 the authority at that time - changjiang yingongzhou channel section previously ; up to the last years of 1980s ministry management administration applied traffic control on changjiang yingongzhou channel section previously, up to the last years of 1980s ministry of communications assigned shanghai marine college, shanghai ship & shipping research institute and changjiang harbor superintendence administration to make feasibility demonstrate about modern vts of zhenjiang traffic control section ; in 1990 dasha radar station which is the first radar vts station with inner river was finished, groped a new way for applying modern radar traffic control of vessel traffic management ; in 1997 the vtms of changjiang " s down - stream from nanjing to liuhekou was completed with connecting net and came into operation formally, meanwhile the signals of dasha radar station were conveyed to vts center by light cable, and then united applying vessel traffic management upon the whole authorized area ; in jun 2001 jiangsu msa made changjiang yingongzhou channel section as the first experimental group of creating " civilized, safe, passable channel activity, updating dasha radar antenna and receive - transmitter building closed - circuit television monitor system, setting uo safety warning board, starting navigational route reformation, carrying out united construction

    1984以前這里平均每四天就發生一起海損事故,事故數占整個長江的1 7 ,被行船人稱為「老虎口」 。長江尹公洲航段緣其極為特殊的地理區位條件和極具代表性的船舶交通管理,從上個世紀八十年代初就有識之士開始了這個長江下游最復雜航段的船舶交通管理探索和實踐。 1984年11月15日當時的長江航政管理局在長江尹公洲水域率先施行交通管制;到八十年代末交通部委託上海海運學院、上海船舶研究所和長江港監局聯合開展鎮江交通管制段建立現代化交管系統的可行性論證; 1990年大沙雷達站? ?內河第一座雷達交管站建成,摸索實施現代化雷達交管的船舶交通管理新途徑; 1997年長江下游南京至瀏河口船舶交通管理系統建成聯網投入正式運行,同時將大沙交管雷達信號通過光纜傳輸至交管中心,統一實施全轄區船舶交通管理; 2001年6月江蘇海事局將長江尹公洲航段作為第一批創建「文明平安暢通航段」活動試點航段,更新大沙雷達天線和收發機,著手閉路工業電視監控系統建設,設立安全警示牌,啟動航路改革,開展聯合「共建」 。
  11. With romances and dramas, it doesn ' t really matter if you see them in the theater or on tv and “ my mother cries a river ” will probably be on cable tv within a few weeks anyway

    如果是愛情文藝片和劇情片的話,你在電視上看或在電影院看都沒什麼差別,而且《母親淚流成河》可能幾個禮拜內就會在有線電視上播放了。
  12. The thesis is aimed at presenting a procedure to establish a baseline finite element model of the qingzhou cable - stayed bridge over the ming river, fuzhou, china that was newly constructed. its main span length of 605m is the longest in the world among the completed composite - deck cable - stayed bridge. the proposed procedure includes several tasks : initial finite element modeling base on the design drawings, field loading tests and ambient vibration tests, and finite element model calibration with the test results

    本文以主跨605m的結合梁斜拉橋? ?青洲閩江大橋為背景,首先根據設計圖紙建立該橋完整的初始空間有限元模型,然後根據通車前現場靜力試驗和環境振動試驗結果對初始有限元模型進行校正,通過參數的調整使模型靜、動力計算結果與實測值吻合。
  13. Making reference to the anqing changjiang river highway bridge construction and the construction control, firstly, this paper studies the philosophy of the cable - stayed bridge construction control simulation analysis systematically, and pays much attention to the theory of simulating the construction process : backward analysis and forward analysis. then on the basis of introducing the construction process of the anqing changjiang river highway bridge, analysis the construction course fully, and analysis comparatively the result of each girder segment construction simulation, and study the variation philosophy of the line style of large cable - stayed bridge during construction

    本文緊密結合安慶長江公路大橋的主梁施工及施工控制實踐,首先系統地分析了斜拉橋施工控制模擬計算的整體思路,並重點分析探討了斜拉橋施工過程計算的理論:理想倒退分析和實時前進分析,然後在介紹安慶長江公路大橋主橋施工過程的基礎上,全面地計算分析了全橋的施工過程,並且應用施工過程計算結果,對每一個梁段的施工模擬工況進行對比分析,研究了大跨度鋼斜拉橋在施工過程中的線形變化規律。
  14. The analytical example is min - river cable - stayed bridge, which is the third longest cable - stayed bridge and the longest composite beam cable - stayed bridge in the world, with main span 605m. the paper set up a 3d model of the bridge with ansys finite element program, considering the geometrical and material non - linearity

    以青州閩江大橋這座主跨長605m的大跨度疊合梁斜拉橋為例,利用ansys大型通用程序建立成橋階段、懸臂階段的空間模型,在計算中考慮了材料非線性和幾何非線性的影響。
  15. By taking runyang bridge over the yangtze river as example, effects of some factors such as the static wind action, wind speed spatial non - uniformity, and the cable ' s wind load on the, aerodynamic stability of the bridge are investigated analytically

    以潤揚長江大橋為例,通過分析揭示了靜風效應、風速空間分佈的非均勻性以及纜索風荷載等因素對大跨徑懸索橋空氣動力穩定性的影響。
  16. The cable - stayed bridge across gaoping river is the most beautiful bridge along no. 2 freeway, as well as the first compound cable - stayed bridge in taiwan

    跨越高屏溪的斜張橋是第2高速公路全線最美麗的一座橋梁,也是國內首座復合式斜張橋。
  17. Binzhou yellow river bridge is a three - tower cable - stayed bridge with prestressed concrete girders

    摘要濱州黃河大橋主橋是三塔預應力混凝土斜拉橋,主梁為預應力混凝土箱梁。
  18. This paper sets about analyzing and studying the feature of bearing force about kunyu river cable stayed bridge and spread it

    本課題是從分析昆玉河斜拉橋受力特點著手並由此展開研究的。
  19. Firstly, routine analyses such as dynamic modal analysis 、 response spectrum analysis 、 buckling analysis were used to analyze the bridge. secondly, only little number of studies dealing with the bridges like kunyu river cable stayed bridge which is the cable stayed bridge of the super breadth composite beam have been reported so far

    首先對昆玉河斜拉橋做了動力模態分析、反應譜分析、主塔及全橋穩定性分析等常規分析。考慮到此座橋型的結構特點即超寬疊合梁。
  20. Stablity analysis of the second nanjing yangtze river cable - stayed bridge during construction

    南京長江二橋斜拉橋施工過程穩定性分析
分享友人