river closure 中文意思是什麼

river closure 解釋
截流
  • river : n 1 河,江。 Rriver Thames 或 the R Thames 泰晤士河; the Hudson R 〈美國〉哈得孫河。 the Rriver ...
  • closure : n 1 關閉,停業;截止;末尾,結束;〈英議會〉終止辯論(=〈美國〉 cloture)。2 閉塞物;【建築】隔...
  1. Analysis on river bed evolution of dam area from the main river closure to open diversion channel closure of tgp

    三峽工程大江及明渠截流期間壩區河演分析
  2. Discusses the optimizing process of treatments of the main technical problems, which include the construction schedule, the field plan and t he balance of earth and rock works, method of the river closure and cofferdams sections, procedure and time of the river colsure, form of the cutoff, construct ion of the cut - off walls

    論述了三峽大江截流及二期圍堰實施過程中的施工進度計劃、料場規劃與土石方平衡、截流方式與圍堰斷面形式、截流進占程序和時段、防滲形式、防滲墻施工等主要技術問題的優化完善過程
  3. Hydrometeorological forecast for tgp ' s main river closure

    三峽工程大江截流水文氣象預報
  4. Second - phase river closure and safe advancement measures for third - phase river closure

    三峽工程大江截流與明渠截流安全進占措施
  5. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  6. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  7. Application of the numerical laboratory in river closure and diversion engineering of three gorges project is introduced

    摘要介紹了三峽工程導截流水流特性數值實驗室的模擬技術及其應用情況。
  8. Abstract : this paper summarizes a series of tests and inve stigations on general layout, const ruction diversion, flood disposal, navigation, river closure, form of gate opening s ection, pattern of energy dissipation and scouring under sluice carried out for f eilaixia proj ect by the scientific research institute of prwrc during the period from 1983 to 1998 and presents their major results

    文摘:綜合闡述了珠江水利委員會科學研究所從1983 ? 1998年間對飛來峽水利樞紐的整體布置、施工導流、泄洪、通航、截流、閘孔斷面形式、閘下消能形式、閘下沖刷等所進行的一系列試驗和研究工作,並介紹主要試驗研究成果。
  9. During the closure period, all vehicle traffic crossing the shing mun river via sand martin bridge will be diverted to use lion bridge or banyan bridge

    在封閉期間,所有經沙燕橋橫過城門河的車輛須改行獅子橋或翠榕橋。
  10. River closure of open channel and construction of rcc weir in three gorges project

    三峽工程明渠截流與碾壓混凝土圍堰施工實踐
  11. River closure under big flows in jinanqiao project construction

    金安橋水電站大流量截流條件下的截流施工
  12. Second - stage river diversion and river closure construction in nierji water complex

    尼爾基水利樞紐工程二期導截流施工
  13. Hydrological prototype observation of two phase river closure in nierji reservoir

    尼爾基水利樞紐二期截流水文原型觀測
分享友人