river station 中文意思是什麼

river station 解釋
河道水文站
  • river : n 1 河,江。 Rriver Thames 或 the R Thames 泰晤士河; the Hudson R 〈美國〉哈得孫河。 the Rriver ...
  • station : n 1 站,臺,車站;航空站,機場。2 派出所;署,局,所。3 【無線電】電臺,電視臺。 4 駐地,部戍地,...
  1. The first power station of jinping mountain lies in the west section of the yanglongjiang river from santan to shoupagou gully, with a double - curved arch dam of 305 - meter height and a normal water storage of 1880metres. the exposed strata of the damsite are marbles and arenaceous rocks of triassic and solution fissures have been developed in the marbles of the left - bank ' s dam abutment, and they have become a stratum of strong leakage. as a result, it has been an important problem for the dam foundation to stop leakage

    錦屏一級電站位於西雅礱江的三灘至手爬溝河段,壩型為305米高雙曲拱壩,正常蓄水位標高1880米。壩址區出露的地層為三疊系雜谷腦組二段大理巖和三疊系雜谷腦組三段的砂板巖。在勘探過程中,發現左岸壩肩大理巖體中的構造裂隙和溶蝕裂隙發育,且成為強滲透地層,為此壩基的防滲成為重要問題。
  2. A 2 - d fem program is designed to simulate and compute thermal - creep - stress field in a long beam on batholith and taipu river pumping station. some conclusion available in designing and construction are presented

    編制了平面有限元程序,模擬計算了巖基上長梁和太浦河泵站工程的溫度徐變應力場,得出一些對工程設計和施工有益的結論。
  3. On the fifteenth day i came in sight of the big river again, and hobbled into the central station.

    十五天後,我又看到了那條大河,於是便一跛一顛地走進了總站。
  4. The following are the large projects undertaking by haifeng company : crude oil electricity plant project of north china oil field hydroelectricity factory, apartment ( 22 stories ) of yuanda real estate company of dalian shipping group, helios hotel of helios group in dalian development zone, tilt aqueduct bridge of shanxi hongqi reservoir ( total span : 267m ), supply and sale building and city construction building ( both are antique architectures ) of shanxi heyang city, sea drainage pipe of hainan fudao fertilizer factory ( 1520 ), 8 oilgas docks of hainan haiyan oilgas company, basha condensable gas transfer station of haiyan company, 10, 000m3 oilgas storage tank of arco company ( usa ) in hainan nanshan, gas pipe and fuel gas installation project of hainan nanshan electricity co., ltd, base and accessory project of hainan gas company, bei da huang cereal and oil market in harerbin, hainan cross island pipe, changhuajiang river pipe crossing project, taihangshan mountain earthwork project ( the 19th section of west - to - east gas transmission project )

    海南海峰公司承建大的工程項目:華北油田水電廠原油發電站工程;大連船泊集團遠達地產公司的遠達公寓( 22層) ;大連開發區香港太陽神集團的太陽神大酒店;陜西紅旗水庫斜拉渡槽工程(全跨267m ) ;陜西合陽供銷大樓及城建大樓(均為仿古) ;海南富島化肥廠排海管線( 1520 ) ;海南海燕油氣公司八所油氣碼頭;海燕公司白沙液化氣中轉站;海南南山美國阿科公司儲油氣萬立米大罐工程;海南南山電力股份有限公司天然氣管線及燃氣安裝工程;海南南海天然氣有限公司基地及配套工程;哈爾濱北大荒糧油批發市場;海南環島管線;昌化江穿越工程;西氣東輸十九標段,太行山土石方工程。
  5. By using the yearly data of water - sand that is gotten by a couple of adjacent hydrologic station in yellow river lower reaches, this paper makes use of kinds of math methods looking for the nonlinear disturbance among all of the factors, and introduces the thinking of analysis, logic, conclusion, inference, and random to nonlinear hydrologic forecasting. it realizes the valid approximation of the water level process in erodible - bed channel

    本文選擇黃河下游兩對相鄰水文站多年水沙資料,藉助多種數學方法尋找其中的非線性擾動項,將隨機數學中分析、邏輯、歸納、演繹、隨機的思考問題方式引入到非線性水文預報中,實現沖淤河道相應水位過程的有效擬合。
  6. Using ansys as analysis tool, and the influence of river water fluctuating on geoelectric observation data in different distance from riverway to geoelectric monitoring observe station is numerically simulated, and the relationship between error of observation data and distance from riverway to the stations is summarized

    摘要利用ansys作為分析平臺數值模擬了觀測系統距河道不同距離情況下,由河水漲落引起的淺層局部電性非均勻性對地電觀測數據的影響,總結了觀測系統距河道遠近與觀測數據誤差大小的關系。
  7. The literature of large culture stanza opening ceremony celebration ceremony that hold be performed by peking television station, and push whole opening ceremony to face the high tide. the adds this time perform of have the the spirited performance for of north son performing arts house liu jade of month, river of play actor valley text, singer piece s entering, day, lee s, youth singer, magic power of green treasure, of free sunlight combination smiling lee increasing the, the regiment of little hero and building mountain art

    由北京電視臺舉辦的大型文化節開幕式慶典文藝演出,把整個開幕式推向高潮。參加此次演出的有著名的評劇演員谷文月河北梆子表演藝術家劉玉玲,著名歌星張偉進杭天琪李殊青年歌手阿朵魅力奔放的陽光組合綠寶貝著名笑星李增瑞石小傑以及房山藝術團的精彩表演。
  8. This paper carries on the 3d finite element structure analysis for power house monolith with a bulb turbine hydropower station located in the upstream of huang river as the carrier

    摘要以黃河上游擬建的某燈泡貫流式水電站為載體,對廠房壩段整體進行了三維有限元結構分析。
  9. This paper researches on the water and suspension in zhujiang ( pearl ) river and her three branches, sampling in makou hydrological gorge station of xijiang river, hekou hydrological gorge station of beijiang river and boluo hydrological gorge station of dongjiang river. the author calculated the riverine carbon flux and measured the content of different carbon forms and carbon isotope composition. furthermore, the author also studied drainage basin erosion and the influence of vegetation distribution on erosion

    本文以珠江水體、懸浮物為研究對象,通過對西江馬口、北江河口、東江博羅斷面水體取樣,分析水體中不同形態碳含量,測定碳同位素值,並計算了河流碳通量值;還對珠江流域的侵蝕狀況及植被分佈對流域侵蝕的影響進行了探討。
  10. Three - dimensional finite element analysis of spandrel groove high slope stability of xiluodu hydropower station in jinsha river, china

    溪洛渡水電站拱肩槽高邊坡穩定性的三維有限元分析
  11. Experimental study on active alkalescency of aggregates for laxiwa hydropower station on the yellow river

    黃河拉西瓦水電站骨料堿活性試驗研究
  12. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧流河水庫供水工程取水頭部由引水渡槽、節制閘、進水閘、泄水閘等建築物組成。由於本工程場地條件限制,增設旁通管后布置非常緊湊,管道急轉角度大且轉彎距離較小,對于管內水流流態是否滿足要求,需要經過模型試驗進行論證,以確保工程的可靠性。旁通管具有上水與泄水要求,對其過流能力也要經試驗確定,為碧流河水庫增建旁通管設計提供依據。
  13. Bank hotel kunming is located downtown, just at the intersect of youth road and jin bi road near pan long river. the hotel is 8 km to the airport, 5 km to the railway station, 10 km to the world exhibition garden and 10 km to the yunnan nationalities village

    -昆明邦克飯店座落在享有「春城」美譽的中國昆明,位於市中心繁華地段,青年路與金碧路交叉口,瀕臨盤江,環境優美,交通便利,距昆明機場只有15分鐘車程。
  14. At ten o clock at night the train, stopped at fort bridger station, and twenty minutes later entered wyoming territory, following the valley of bitter creek throughout. the next day, december 7th, they stopped for a quarter of an hour at green river station

    晚上十點鐘,火車到達了布里吉爾堡,幾乎連停都沒停,立即又繼續前進,跑了二十英里就進入了懷俄明州原名達科他州,沿著整個比特爾河盆地前進。
  15. About 5 km to the railway station. only 1. 5 km to the city center. - near the municipal central square and the panlong river and located in the financial and cultural center of kunming

    -雲南天恆大酒店毗鄰市中心廣場,與盤江隔江相望,地處昆明市金融文化中心,周圍商場林立,交通便利,環境優美。
  16. Second, based on the characteristic of the receiving water studied in this paper, develope a dynamic one - dimension water quality model for nanbei river in zhangcha town of foshan city, and develope a program of water quality model based fortran powerstation. and then, calculate the concentration of codcr in receiving water using the simulation results of swmm and analyze the effect on the environment of receiving water by intercepting ratio. at last, the construction investment and operational and administrative expenses of intercepting trunk sewer 、 pumping station and sewage farm is calculated and the relation between them is discussed

    其次,本文根據研究區受納水體的特點,建立了佛山市張槎鎮南北大涌的一維非穩態水質模型,相應地開發了基於fortranpowerstation平臺的水質模型計算程序,並在swmm模型模擬結果的基礎上,利用本文編制的水質模型程序計算了不同截流倍數時南北大涌codcr濃度的時空變化過程,分析了截流倍數對河涌水環境質量的影響。
  17. Glaciological investigation during the first scientific expedition of chinese arctic yellow river station

    中國北極黃河站首次科學考察隊冰川考察
  18. The progress of glaciological studies in svalbard and chinese construction of glacier monitoring system close to yellow river station, ny - lesund, svalbard

    斯瓦爾巴群島冰川學研究進展與我國北極冰川監測系統建設
  19. The construction of the virtual yellow river station

    北極黃河站站區虛擬現實建設的方法與實踐
  20. Measures were taken in structure designing to enlarge the discharging capacity of the spillway. in non - structure designing, the telemetric system was designed for forecasting the runoff and flood by monitoring the rainfall and water level of river station, and a warning system was designed to avoid downstream people from the dangerous situation of man - made flood

    通過劃分取水口上游淤積、取水口淤積和流態、過機泥沙三個子系統,對三個方案的二維計算結果採用模糊集理論優化分析,結論是155方案,即洪水來臨時把庫水位降到64米方案為最優方案。
分享友人