road at grade 中文意思是什麼

road at grade 解釋
地面路段
  • road : n 1 路,道路;街〈略 Rd 〉;公路;行車道;路程,行程。2 〈美國〉鐵路。3 方法,手段,辦法;(走向...
  • at : 1 Air Transport(ation) 2 【電學】 ampere turn 3 antitank 4 Atlantic Time 5 alternative technolo...
  • grade : n 1 等級,級別;階段;程度,標準,水平。2 〈美國〉(中小學的)年級;某一年級的學生。3 〈pl 〉 〈...
  1. Probe into design scheme of turning grade crossing into grade separation at road junction of huangling

    關于黃陵道口平交改立交設計方案的探討
  2. At that time, the at - grade crossing currently below the footbridge will be closed. in addition, the footbridge north of the tin wah roadtin shui road junction connecting tin yan estate and phase 2 of chung fu shopping centre was opened for public use on 1 september

    有關工程進度理想,預期該橋在九月底可重新開放供居民使用,而現時位於該處橋底的臨時路面行人過路處,則將在南橋開放后停止使用。
  3. Grade separation of light rail at tuen mun pui to road

    分隔主要輕鐵及路面交匯處
  4. A ll buildings have facades which are interactive at ground level. primary road crossings are pedestrian crossings at grade at both northern corners of the site, supported with all - weather bridges between adjoining buildings. facilities and land uses stimulating activities throughout the day, evening and weekends are called for

    放棄大廈的地下通道或隧道設計,所有大廈于海傍交替屹立,行人道由添馬艦的北面起,通過全天候長廊通道于大廈穿梭,有關設施及土地空間將可支援一切于該地不論早晚及假期所進行的活動。
  5. As the road passes the southbound vehicle holding area, the southbound 3 - lane carriageway splits into two 2 - lane carriageways. both cars and hgvs use the at - grade road in the first stage. this opens out into a large flat apron area in front of the immigration department kiosks

    道路越過南行車輛停候處時,南行的三線行車道便分為兩條雙線行車道,其他車輛及重型貨車可使用第一階段的低層車道,直通入境事務處關卡前廣闊平坦的停候處。
  6. The project involves the operation of primarily at - grade eastern access road and two bridges over the two branches of the drainage channels

    工程項目涉及營辦主要建於地面的東面通道,以及在排水渠的兩條支管上面兩條天橋。
  7. During the temporary closure of the footbridge, kcrc has installed a temporary at - grade pedestrian crossing under the existing footbridge at tin shui road

    在行人橋暫封期間,九鐵已於天瑞路近現有行人橋底設置臨時的路面行人過路處。
  8. Re - alignment of existing carriageways and construction of new at - grade carriageways for the road junction ; and associated drainage, retaining wall and slope works

    為有關路口的現有行車道重新定線,並興建新的地面行車道及進行相關的渠務斜坡及護土墻工程。
  9. The light rail track diversion works were carried out to facilitate the light rail grade separation works at pui to road

    輕鐵路軌改道工程是配合杯渡路架空輕鐵路軌工程而進行,以便騰出空間興建輕鐵高架橋。
  10. The northern section dbl covered under this contract primarily comprises the construction of viaduct with some at grade sections and cut slopes at the northern end where the road passes through the northern extremity of the tsing shan range. it connects the hk - swc to the southern section near castle peak road

    合約項下的北段后海灣干線北段主要包括建造高架路,在北端設有地面路段和削坡,道路會在該處橫過青山嶺北端的山邊,把深港西部通道與青山公路附近的南段連接起來。
  11. Culvert under high - stack soil is a ubiquitous phenomena in road constructions in mountain, self - compression of high - stack soil can not be ignored, soil pressure at the top of culvert is affected by many factors, including the height of high - stack soil, section size of culvert, width of the bottom of valley, grade of valley, property of filled soil, construction procedure and techniques

    高路堤下埋設涵洞是山區公路建設的一種較為普遍的現象,高路堤自身壓縮較大,不可忽視,涵洞頂部土壓力的大小又受很多因素的影響,包括填土高度,涵洞截面尺寸,溝谷底部寬度,溝壁坡角,填築體性狀,施工工序與工藝等。
  12. The length of the green line will be 8. 95 kilometers in total, with a 0. 52 - kilometer elevated viaduct section. on the green line, there will be 10 at - grade stations. the line will start from hsinchu chemical station on road no. 5 connecting with the red line at this point, then pass through the downtown area along road no. 5, circle the downtown area along chingkao road and chunghu road, and finally arrive at hsinchu tr station, where it will re - join the red line

    目前研提二個較可行路線,其中南北線全長約8 . 15公里,地下段1 . 8公里,平面段6 . 35公里,設八座車站,含1座地下車站,南端銜接高運量捷運新莊線大橋國小站;東西線全長約5 . 35公里,高架段1 . 5公里,平面段3 . 85公里,設八座平面車站,東端銜接高運量捷運淡水線芝山站。
  13. Operated largely at - grade with about 80 junctions that interface with other road traffic, the light rail system has a remarkable record of safety, punctuality and reliability

    輕鐵系統主要在路面行駛,沿途約有八十個路口與其他交通工具共用。輕鐵在安全、正點率及可靠程度方面的紀錄良好。
  14. How can the traffic control facilities at intersections be designed for an at - grade lrt in such a way that it can cope with local environmental characteristics, ensure traffic safety, and maintain smooth road traffic

    平面輕軌交叉路口交通管制設施如何設計,以配合本地交通環境特性,確保行車安全,維持道路行車順暢?
  15. Due to the road width shortfall on section 4 of wufu road and west river road, this section is planned as a single track 3. 14 kilometers long. this lrt line is planned to be mainly of the at - grade type, except for the area at the intersection of section 3 of chushan road and section 4 of kishon road, as well as on the north side of genko bridge over the love river, where underground sections are planned

    另考量政府財政負荷,與施工對於市區交通沖擊太大,並經分析評估后建議優先興建路網,路線總長20 . 07公里,其中紅線15 . 96公里,設19座車站;綠線4 . 11公里,設5座車站,以88年幣值估算,總建造成本約需新臺幣90億元。
  16. Due to the road width shortfall on section 4 of wufu road and west river road, this section is planned as a single track 3. 14 kilometers long. this lrt line is planned to be mainly of the at - grade type, except for the area at the intersection of section 3 of chushan road and section 4 of kishon road, as well as on the north side of genko bridge over the love river, where underground sections are planned. there will be 23 stations on the double - rail sections and 9 stations on the single rail sections

    並提出其輕軌系統優先發展路網,建議路線全長約9 . 6公里,設置9個車站,總成本以88年幣值估算,約需新臺幣86億,包括2 . 2公里高架,佔全長之23 , 2個高架站; 0 . 7公里地下,佔全長之7 , 1個地下車站;其餘6 . 7公里為平面型式,佔全長之70 , 6個地面車站。
  17. Stubbs road at grade

    司徒拔道地面行車道。
  18. What are the major land uses on criii ? a19. major land uses on criii include a wide waterfront promenade, the new star ferry piers and public piers, a " comprehensive development area " site for low to medium rise commercial development with pedestrian landscaped deck, a " government, institutional or community " site, some waterfront related commercial and leisure uses and key transport infrastructure including road p2 at grade, cwb underground, airport railway extended overrun tunnel and nil underground

    中區填海第三期工程所得土地的主要用途,包括寬闊的海濱長廊新的天星碼頭及公眾碼頭"綜合發展區"內的中低高度商業樓宇及園景行人平臺"政府機構或社區"用地與海傍有關的商業及休憩用地以及主要運輸基建設施包括p2道路網地面中環灣仔繞道地下機場鐵路掉車隧道的延部份及地鐵港島北線地下。
  19. However, routing the road over the went landfill or its proposed expansion zone is not feasible due to space requirements of the landfill ( assuming an at - grade road ) and the incompatibility between raised roadway supports and the landfill s impermeable liner ( assuming an elevated road )

    可是,將道路跨越新界西堆填區或其建議擴展區域都並不可行,因為需要在空地堆放填土(假設是一條地面道路)和升高道路支撐物和填土的防滲透墊層(假設是一條高架路) 。
  20. Alternatively, motorists may also travel via chatham road north at grade and

    此外,駕駛人士亦可改行漆咸道北北行線
分享友人