rock anchor 中文意思是什麼

rock anchor 解釋
石錨;入石錨定桿
  • rock : n 1 巖,巖石,磐石,巖壁;卵石;〈常 pl 〉〈美口〉石子兒;暗礁,巖礁。2 〈the R 〉直布羅陀 (Gibr...
  • anchor : n 1 掛錨;錨狀物。2 樁,支架。3 〈比喻〉依靠。4 【體育】一隊運動員中最後參加比賽的人;殿後的人〈...
  1. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    首先,在前人研究成果的基礎上,對錨桿與圍巖的相互作用機理進行研究,利用全長錨固錨桿的中性點理論,從等效均化的角度來考慮錨桿對圍巖的加固作用,並推導了在簡單荷載作用下,含有襯砌、等效加固后的圍巖、原始圍巖三者的彈塑性解析解,對工程設計有著重要的參考意義;在數值模擬方面,以考慮錨固圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有限元方程的計算格式,為開發運用大型商用有限元軟體msc . marc提供了理論根據,也形成了本文的理論基礎:最後,論文以南水北調東線穿黃隧洞穩定性分析項目為工程實例,利用本文所述的接觸問題的摩擦模型理論,對錨桿支護結構的應力場、位移場的變化規律進行了研究,分析了加錨支護對隧洞圍巖應力、變形的影響。
  2. In the computation module, mindlin formula is applied to calculable the displacement of the rock ( soil ). based on the presumption that the rock ( soil ) and the anchor has the same displacement at the interface, the equation of displacement of rock ( soil ) and the anchor is made

    在該計算模型中,運用mindlin公式計算巖體位移,並基於在桿體與巖土體接觸面上位移相等的假定與桿體的位移建立等式,進而求出沿桿體全長的剪力分佈。
  3. Practices on bolt, mesh, anchor and beam support in coal drift under unstable roof condition of cataclastic rock mass

    不穩定頂板煤巷錨網索梁支護實踐
  4. Paper barrel insertion grouting for the rock anchor

    巖石錨桿紙筒填塞法注漿工藝
  5. His eyes sought answer from the river and saw a rowboat rock at anchor on the treacly swells lazily its plastered board

    他掃視著河面,想尋求個答案。只見一般劃艇停泊在形似糖漿的洶涌浪濤上,懶洋洋地搖晃著它那灰膠紙拍板。
  6. No sinkhole and hige successful hole rate, so that the consumption for rolled up powder and anchor shank bits could be reduced sharply. construction efficiency could be promoted, and labor intensity could be reduced. a wide range of rock formation, it could be used in rock formation with f

    不易縮徑,成孔率高,極大的減少了藥卷錨桿的浪費提高了施工效率,降低了工人勞動強度適巖性廣泛,在f
  7. Research on anchored effect of fully cement - imbedded anchor cable on weak country rock cavern

    全長黏結式錨索對軟巖洞室的加固效應研究
  8. The anchor line fouled on a rock

    錨索纏在一塊巖石上
  9. According to the method in paper, roughness of bedrock surface of north anchor pit of runyang bridge is described in quantitative fractal dimension, and the method of determining frictional resistance of the whole anchor under many factors is discussed, which offers a new ideal and approach for precise determination of frictional resistance of rock mass engineering

    依據文中方法,對潤揚大橋北錨碇基坑建基面粗糙度進行了定量分維描述,探討了考慮多種因素條件下整個錨碇摩阻力的確定方法,為巖體工程摩阻力的準確確定探索了一條新的思路和途徑。
  10. However, along with the increasing of construction quantity of the infrastructure of irrigation works, traffic, communication etc., newer and higher requirement of geotechnical anchoring are made in slope, major dam, bridge, tunnel, deep foundation ditch engineering and the construction engineering such as anti - capsize, anti - float, anti - slippage engineering of the buildings. for example, self - intension of rock and soil is required to exploit better ; carrying capacity of anchor increase according to anchoring length ; anchor should be sufficiently lasting and should not influence the exploitation of adjoining stratum

    但另一方面,隨著我國水利、交通、通訊等基礎設施建設力度的加大,邊坡、大壩、橋梁、隧洞、深基坑以及建築結構物的抗傾倒、抗浮力、抗滑移等建設工程將對巖土錨固提出一些新的和更高的要求:如要求進一步調用巖土體的自身強度,錨桿應具有足夠的耐久性,錨桿的使用應不影響周邊地層的開發等。
  11. The structure of prestressed anchor - rope and groundsill is one of the most effective sheathing works, it is used wildly in some slop protection works. the structure is made up of prestressed anchor - rope and groundsill. the combined structure can utilize the latent energy of rock or soil mass

    預應力錨索地梁結構是一種極其有效且正推廣應用於各工程部門的支擋防護體系。該結構由預應力錨索和地梁共同組成。
  12. Standard test method for rock bolt anchor pull test

    石栓錨定拉力試驗的標準試驗方法
  13. The supporting mechanism of pre - stress anchor is given in following sentences in this paragraph : make full use of sectional stability, put - up steel - net shot concrete to the stratified earth as the trench is being excavated, and by this means, the little liding of soil layers and small broken slumps of rock slopes can be avoided

    預應力錨板的支護機理:充分利用巖土層自身或預處理的局部的穩定性,隨基坑開挖分層掛鋼筋網噴射砼,以避免土層幫片及巖石邊坡小的節理破碎滑塌,並把土壓力傳給錨板,由錨桿集中受力,通過錨桿的錨固力平衡土壓力。
  14. The rock anchor beam is the most difficult and demanded in excavating underground factory, its quality will affect its safety of performing later, as a result, a better quality and smaller crushedregion is demanded

    在水電站地下廠房開挖中,巖錨梁開挖難度大、質量要求高,該部位成型質量的好壞將直接影響今後廠房內吊車的運行安全。巖錨梁開挖要求其具有良好的開挖輪廓面和較小的破壞范圍。
  15. Rock anchor piles design of huge structure foundation and analysis by finite element analysis

    高聳結構巖石錨桿基礎設計及有限元分析
  16. Research on safety standard for rock anchor beam under blasting vibration in large underground powerhouse

    大型地下廠房巖錨梁爆破安全控制標準研究
  17. Calculation of the stress - field of prestressed rock anchor

    預應力巖錨的應力場計算
  18. Rock anchor beam is selected as the studied object, the parameter of blasting and its parameter selection are studied in the paper

    本文以水電站地下廠房巖錨梁爆破開挖為研究對象,重點研究了影響爆破效果的參數及其選擇。
  19. At first, the author has analyzed the destroy style and mechanism of blasting, studied various factors which influence on the effect and supporting design of rock anchor beam of underground hydroelectric power station

    在首先分析爆破機理的基礎上,探討並確定了影響地下廠房巖錨梁爆破開挖成型質量和穩定性的各種因素。
  20. The main factors have been determined to be the depth and width of hole, the strength of surrounding rock, the types of detonator, the decoupling coefficient, burden and unit consumption form what has been discussed, the author make use of those major factors as standard of affection and studied bp neural networks " work principle, structure and defectiveness. a model of modified bp neural networks has been used to built model in order to identify selection and optimize of blasting in rock anchor beam. triumphant parameter design of blasting were selected as a example, in order to perform network of parameter design

    確定以炸藥類型、最小抵抗線、孔深、炮眼間距、不耦合系數、線裝藥量、巖石強度和巖體完整度為主要影響因素;把改進的bp演算法應用在爆破參數優化設計中,建立以炸藥類型、最小抵抗線、炮孔深度、炮眼間距、線裝藥量、不耦合系數、巖石強度和巖體完整度為主要影響指標,選擇45例國內外成功的爆破參數設計實例為樣本,利用bp神經網路進行爆破參數優化設計,並通過現場保護層和巖臺修面爆破試驗以及對其松動圈范圍進行聲波測試,其測試結果最優的爆破方案其松動圈最小,這與神經網路進行參數優化設計的爆破方案相吻合。
分享友人