rock bank 中文意思是什麼

rock bank 解釋
石岸
  • rock : n 1 巖,巖石,磐石,巖壁;卵石;〈常 pl 〉〈美口〉石子兒;暗礁,巖礁。2 〈the R 〉直布羅陀 (Gibr...
  • bank : n 1 堤,堤防;岸,河畔。2 埂,壟,堆。3 (海中水下的)沙洲,灘。4 斜坡,邊坡,坡度;轉彎。 【航空...
  1. The beatles was a famous rock bank in briton

    甲殼蟲樂隊是英國有名的搖滾樂隊。
  2. Stability of rock slopes is generally controlled by the structure of rock masses, especially the soft structure surfaces. analysis of rock mass structures is a key to establish geological models and numerical simulation and a foundation to assess the stability of rock slopes. the weak structure surfaces are mainly bedding planes, faults, joints, schistosity plane and contact zones of intrusive bodies. since they are different in genesis and scale, the rock masses are different in features and mechanical intensities. based on the combination of rock structure bodies, 15 basic modes of deformation and failure of rock slope are systematically summarized. the deformation and failure of rock masses actually result from the recombination and rearrangement of these rock bodies. there are 11 types of rock mass structures and various deformation and failure of bank slopes are present in the reservoir area of the three gorge project

    巖體結構,特別是軟弱結構面對基巖斜坡變形與破壞具有顯著的控製作用,巖體結構模式分析是建立斜坡地質模型和數學模型的關鍵和評價斜坡穩定性的基礎。巖層層面斷裂構造節理裂隙片理與劈理以及侵入體和圍巖的接觸帶等是控制基巖斜坡穩定的軟弱結構面,這些成因不同大小不一的結構面將巖體分割成性質各異力學強度不均的各種巖體結構體,構成了15種基巖斜坡變形破壞的巖體結構基本模式。不同結構體的重新組合與排列是斜坡失穩的內在原因。
  3. But at the present, because of chronic geomorphy disintegration, altitude and ascent of bank slope have been built down and palliated. especial rock mass mechanics condition has not been existent, so all kinds of rock mass fracturing deformation was stopped to developing and steady

    但目前因長期的地貌剝蝕作用,壩肩岸坡的高度及坡度均已大為降低減緩,特殊的巖體力學條件已不復存在,巖體內部的各類張裂變形亦停止發展,處于破裂發展穩定階段。
  4. The mechanical genesis of the complicated rock mass is because several times of tectonism in pro - period made the structure of rock mass in the right dam foundation damaged seriously and rock mass alteration made its mechanical character more anisotropy. after that the fractures in the right dam foundation slope were stretched at the beginning of the quaternary period because in the period yakouhoushan mountain quaquaversal dome was blowups quickly. at the same time, the valley trenching of lancang river reach to 800 - 1000 meter in altitude at the right bank in nuozadu dam site

    導致右岸巖體復雜化的成因是,右岸巖體在早期遭受了多期構造作用和巖體蝕變的基礎上,第四紀早期丫口後山穹隆的快速隆起與當時河谷下切至800m 1000m高程這一特殊因素組合引起了右岸巖體沿原有的斷裂(裂隙)張開,使地下水等風化營力能夠到達坡體較深部位,經過長期的風化卸荷作用,形成了右岸復雜巖體。
  5. At the same time, relationship between rock and elctronics for every formation is determined. 2. there are five depositional faces in the area : open sea, restrained sea, tidal flat, salified lagoon and bank

    4 、在單井沉積相研究的基礎上,對各組的巖相古地理特徵進行了詳細研究,研究認為:區內發育開闊海、局限海、潮坪、咸化瀉湖和灘五種沉積相類型。
  6. Bank slope types and rock mass structural features in new fengjie county, three gorges reservoir region

    三峽庫區奉節新縣城庫岸邊坡類型及巖體結構特徵
  7. ( 4 ) rock mass of dam abutment had very complicated distortion in right bank of xia luo - yu damsite

    ( 4 )下落魚壩址右岸壩肩巖體具有極為復雜的變形問題。
  8. All of the hydraulic structures are arranged in the right bank and four underground seepage tunnels are arranged parallel in horizon, and the axle wires intersect with syncline axis almost perpendicularity, and with rock formation obtusely. complex underground tunnels are formed under such formidable conditions, and each of seepage tunnels crosses nuclear of syncline and comes up against interlaminar sharing disturbed belt at different footage

    四條引水發電隧洞在平面上平行布置,軸線方向與本區構造線方向近於垂直,與巖層走向大角度相交,構成一復雜地下洞室群,並在不同洞段通過沙金壩向斜核部,且遭遇多條層間剪切錯動帶。
  9. In britain the collapse of northern rock was also largely the result of inadequate national supervision, an outdated system of deposit insurance and the lack of teamwork between britain ' s financial super - regulator, the financial services authority, the bank of england and the treasury

    英國抵押銀行的倒閉很大程度上也是缺乏國家監管的惡果,原因還應包括存款保證系統的陳舊,作為高層監管機構的英國金融服務管理局、英國銀行與英國財政部之間缺乏團隊合作精神。
  10. Dyke was there, at bay at last, his back against a bank of rock.

    戴克就在那裡,到底可弄得無路可走了,背靠在一塊石壁上。
  11. Based on the summary of the inspection effect for one hydrogeological year of stage geological disaster prevention project of xingshan county in three gorges region, this paper puts forward the relevant and effective methods for the harnessing of landslide, dangerous rock body, collapsed bank and other different geological disasters, and proposes suggestions for the future inspection of geological disaster prevention projects

    摘要本文通過對三峽庫區興山縣二期地質災害防治工程一個水文年的效果監測總結,提出了針對滑坡、危巖體、塌岸不同地質災害體的抗滑樁、格構、掛網噴砼等不同治理工程所應採取的與之相適用、而有效的監測方法、監測頻率,以及資料整理、工程效果分析時應注意的問題等,為今後做好地質災害防治工程監測提出建議。
  12. In this case, the challenge is how to recover as fully and quickly as possible the ? 25 billion ( $ 49 billion ) or so that the bank of england has lent northern rock since its cash dried up last summer and get taxpayers off the hook for the guarantee the treasury has given the bank ' s creditors ( worth some ? 30 billion )

    現在的問題是如何才能最快的還清北巖銀行在去年夏天資金枯竭的時候向英格蘭銀行借入的約250億英鎊( 490億美元)貸款;如何讓財政部對北巖銀行的債權方做出的保證不再繼續花納稅人的錢。
  13. ( 5 ) conclusion was obtained by the analyzing and studying the mechanics environment of the rock mass and the landslide on right bank : according to the analysis, the present direction of the maximal principle stress was consistent with the present tectonic stress field, the value of the principle stress increased or reduced in special place, and there was tensile stress region at the 2000m or above it on the left bank, the accumulate and adjustment was very limited in 200 years, the calculated result of the landslide indicated that the landslide on the right bank was stable under the various conditions

    ( 5 )壩址區河谷巖體力學環境及右岸古滑坡體的穩定問題分析得出:河谷巖體應力場的分析顯示,河谷巖體中主應力的方向基本上與現今區域構造應力場的方向一致,在一些特殊地帶巖體的主應力值有所降低或增高,特別是在左岸的2000m高程附近及以上,存在有明顯張應力區。在未來200年流變計算時步范圍內,河谷巖體應力的積累與調整較為有限。同時對滑坡體各種工況條件下的穩定性計算結果表明,右岸古滑坡體在各種工況條件下是處于穩定狀態的。
  14. ( 6 ) conclusion was obtained by the analyzing the mechanics environment and the stability of the lanslide on the right bank after the dam built : the value of the rock mass stress increased and the tensile stress region obviously reduced, the direction of the principal stress was unchangeable the dam and the landslide were stable under the dangerous condition ( the reservoir and at the same time the earthquake was viii ), but when the water lever suddenly fell and did not think of other force, safe factor evidently reduced, the dam and the landslide will be destroyed under the most dangerous condition ( the water lever suddenly fell and at the same time the earthquake was vi ) ; the stability of the landslide will be destroyed by the horizontal thrust under the most dangerous condition or ; the physical and mechanical parameter will be reduced due to long period filter, the landslide will be destroyed too

    ( 6 )建壩工程荷載條件下河谷巖體力學環境分析及右岸古滑坡體的穩定問題分析得出:建壩后河谷的巖體應力量值明顯增高,同時左岸的張應力區的范圍及量值明顯減小,主應力的方向依然與模型的底邊界垂直;大壩建成后逐漸蓄水階段以及同時考慮本區最強地震力的作用等各種不同的工況條件時,滑坡體及壩體總體上仍處于穩定狀態;水位驟降時,在未考慮其他外力作用的情況時,滑體的安全系數將顯著降低。若考慮水位驟降及本區最大地震力的共同作用,壩體將在滑坡體下滑推力的作用下產生破壞;建壩后水平推力對右岸古滑坡體穩定性的影響分析可以看出,在最危險的工況條件下,壩體及滑坡體也將處于臨界狀態;在長期滲透變形的作用下,由於滑帶的物理力學參數的降低而有可能導致壩體失穩破壞。
  15. And that, the variable regulations of stress field, strain field and plastic failure zones in the surrounding rock mass of the underground cavities are summarized for the right and the left bank of underground chambers

    全面總結了溪洛渡水電站左、右岸地下廠房洞室群圍巖應力,變形和破壞區的分佈特徵和變化規律,為洞室群穩定性評價和工程施工設計提供了基礎資料和理論依據。
  16. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土斜心墻和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  17. In the area of the left bank, rock body is mainly composed of permian period - triassic period granite and triassic period siltstones and mudstones ( t2m ). moreover, the rock body has been more faulted, such as f1 f3 f9 and so on. in addition, there also exist a lot of joints and form complex rock mass structure

    工程區主要出露二迭紀三迭紀花崗巖體( _ 4 ~ 3 _ 5 ~ 1 )和三迭系中統忙懷組下段沉積巖( t _ ( 2m ) ~ 1 ) ,發育有工程區規模最大的f _ 1和f _ 3斷層,以及其它斷層和大量的各類斷續延伸的裂隙,巖體結構較為復雜。
  18. The american house price falls, expends postpones with august data display non - agriculture employment rate to fall, above canada on friday north rock which occurs in england ( north stone bank ) the run on a bank disturbance, all will let in the market fill the air to the future economical trend and the stock market not optimistic atmosphere

    美國房價在英國的星期五北部巖石下跌,消費延期以威嚴的數據顯示非農業就業率在加拿大之上下落, (北部石銀行)在銀行干擾發生奔跑,全部將進入市場積土空氣對未來經濟趨向和股市不樂觀大氣。
  19. Study on field test of rock - soil aggregate on right bank of longpan in tiger - leaping gorge area

    虎跳峽龍蟠右岸土石混合體野外試驗研究
  20. So, from the great cliff ' s base, jut spokes of rock crossing from bank to bank, intersecting ditches until the pit ' s hub cuts them off from meeting

    就像這樣從巖石的基礎有危巖通出去而跨越堤岸和壕溝,降到那把它們截斷和集合起來的井。
分享友人