rock classification 中文意思是什麼

rock classification 解釋
巖石分類
  • rock : n 1 巖,巖石,磐石,巖壁;卵石;〈常 pl 〉〈美口〉石子兒;暗礁,巖礁。2 〈the R 〉直布羅陀 (Gibr...
  • classification : n 1 選別;分等,分級;分選。2 【動、植】分類(法)。 〈分類級別為: phylum 【動物;動物學】及 div...
  1. After long - term synthetic action of these factors, the complicated rock mass in the right dam foundation come into being. the adjoining rock engineering geological classification of water - conservancy and hydraulic - power project reconnaissance code ( gb50287 - 99 ), geomechanic system ( bieniawski, 1973 ), rock mass quality index z ( xiaowang, 1995 ), artificial neural network and field classification were used in the rock mass quality classification

    本文採用水利水電工程地質勘察規范( gb50287 - 99 )的圍巖工程地質分類、巖體rmr分類( bieniawski , 1973 ) 、巖體質量指數z分級(小灣, 1995 )以及人工神經網路分類,對壩區巖體按其基本指標作出定量化評分、分級。
  2. In view of the natural conditions in loess area of gansu, in the light of investigation conditions of seepage of built loess and weak rock highway tunnels in this area and classification of water gushing conditions for railway tunnels, and by engineering analogism, the classification of tunnel water gushing types suited the structure design of highway tunnel waterproof and drainage, and the three methods for checking and subdividing water gushing types are presented

    摘要針對甘肅黃土區的自然條件,依據該地區已建黃土及軟巖公路隧道滲漏水調查情況和鐵路隨道涌水狀態分類,運用工程類比法提出適合該地區公路隧道防排水結構設計的隧道涌水類型劃分及對涌水類型校核與細分的三種方法。
  3. Based on seismic wave method, borehole acoustic method and indoor rock mechanics test, the dynamic and static parameters of the foundation rock for the toe slab of the concrete face rockfill dam for shuibuya hydropower station are tested, and then the relationship among the rock quality, dynamic parameter and static parameter are established with the parameters obtained from the test, furthermore, the classification and the quality evaluation are made as well

    摘要採用地震波法、鉆孔聲波法以及室內巖石力學試驗法,對水布埡水電站面板壩趾板建基巖體進行了動、靜參數測試,並根據所獲的參數建立了巖體質量、巖體動力學和靜力學參數三者之間的相關關系,對工程巖體進行了質量分級和質量評價。
  4. ( 2 ) taking the geology analysis as main way and combining the pre - test, predicating the tunnel ' s main geology condition ( rock quality, surrounding rock classification, long - wide joint, fault, ground water, crustal stress ), and predicating the main potential disaster ( collapse, breaking water, rockburst, large deformation ) ( 3 ) employing the stress test result and inverse analysis of the stress field, finding out the crustal stress " s distributing rule along the tunnel axes section : the highest crustal stress is 24mpa near the deepest spot, and predicting that the k2 + 260 ~ k3 + 000 likely to be the high crustal stress segment for this tunnel

    通過地質分析、類比分析、監控量測、數值模擬、神經網路等方法,對鷓鴣山隧道潛在的主要地質災害(塌方、涌水、巖爆和大變形)進行了預測預報( 3 )在現場地應力測試成果的基礎上,運用數值計算進行應力場反演,基本查明了沿隧道軸線剖面的地應力分佈規律:地應力量級在最大埋深附近達到最大值24mpa ,並預測k2 + 260 k3 + 000段將很可能成為鷓鴣山隧道的高地應力段。 ( 4 )塌方往往與斷層破碎帶及千枚巖相聯系。
  5. ( 2 ) the rock mass quality was assessed based on the data obtained from exploration adits with the methods of engineering geological classification for surrounding rock mass, bq, rmr and q - system successively. and th en the correlations between the assessment results of different methods were discussed

    基於勘探平硐獲取的資料,運用「圍巖工程地質分類法」 、 bq法、 rmr法和q系統法進行了地下廠區巖體質量評價;討論了四種不同方法評價結果之間的相關性。
  6. Thesis is based on diaphragm gallery driving project of sichuan yele hydroelectric station. it gives clear definition and classification of soft rock, and a comprehensive study has been made on the mechanism of soft rock failure

    首先明確了軟巖的定義及分類,對影響軟巖隧道穩定因素,軟巖隧道失穩的力學機理和變形力學機製作了較為全面的研究。
  7. According to the research results of the rock quality calculation, the columnar section digitlizing, the rock mass structure diagnosis and other methods this paper used engineering limited parameters, basic structure and evolutionary structure of rock mass as the first grade indexes, proposed the technique of dynamic engineering classification of stability of mine road surrounding rock mass ? dec ?, pointed out the method of using dec results

    基於圍巖質量計算、柱狀圖數字化與重組、圍巖結構診斷、采動應力作用后圍巖結構演化等研究成果,採用工程要求、基本結構、演化結構」為一級指標,提出了巷道圍巖穩定性動態工程分類技術、分類結構的表達技術及分類結果的應用方法
  8. All the results can be utilized by engineers, during the designing and construction. the main conclusions are listed as follows : ( 1 ) based on the shortest line between weak interbed and limit of excavation and the location of point of intersection between limit of excavation, classification of weak interbed distribution is set up, and the distance of distribution is defined ; ( 2 ) according to the strength and deformation equivalent principle, influence zone of weak interbed is introduced, and a new method to simulating the weak interbed with thickness is built ; ( 3 ) some quantificational results on influence of weak interbed respectively at crown, right shoulder and right wall are summarized ; ( 4 ) some quantificational results on influence of weak interbed with the distance between weak interbed and limit of excavation 0. 2d, 0. 5d, l. od are gained ; ( 5 ) some quantificational results on influence of weak interbed in the rock mass with confining coefficient 0. 38, 1. 0, 1. 5, 2. 0, 3. 0 are summed up ; ( 6 ) some quantificational results are summarized on influence of the underground surrounding rock mass stability with weak interbed, in the representational surrounding rock mass graded ii, iii, iv ; ( 7 ) according to the studying results some advices are suggested on designing of underground engineering

    主要結論如下: ( 1 )以軟弱夾層到開挖輪廓線最短距離和最短距離線與開挖輪廓線的交點位置為指標對軟弱夾層的分佈部進行了分類,並確定了軟弱夾層分佈距離; ( 2 )根據強度等效和變形等效的原則,引入了軟弱夾層影響帶的概念,建立了模擬軟弱夾層厚度的一種新方法; ( 3 )總結出了軟弱夾層分佈在拱頂、右拱肩、右邊墻時對地下洞室穩定性影響的量化指標; ( 4 )分析出了軟弱夾層距開挖輪廓線0 . 2d 、 0 . 5d 、 1 . 0d三種情況對地下洞室穩定性影響的量化指標; ( 5 )總結出了在不同的側壓力系數( 0 . 38 、 1 . 0 、 1 . 5 、 2 . 0 、 3 . 0 )地應力場中軟弱夾層對穩定性影響的量化指標; ( 6 )得出了在、 、代表性圍巖中軟弱夾層對穩定性影響量化結果; ( 7 )根據數值試驗成果提出了在有軟弱夾層圍巖中地下洞室設計原則的幾點新內容。
  9. Based on the discuss of the geologic environment of the high slope of spandrel groove jinping i hydroelectric power station. and the engineering geological conditions of rock mass are carefully studied in the paper. the modified csmr are adopted to perform the classification of the slope rock mass, the results of which are combined with the macroscopic stability of the high slope. on the basis of these, the methods of geological diagnosis and the finite element analysis are applied to analyze and compute the overall stability of the high slope

    本文在闡明錦屏一級水電站壩區巖體的形成和演化特徵的基礎上,詳細研究了拱肩槽高邊坡巖體的結構特徵及岸坡巖體淺表生改造特徵,建立了岸坡巖體淺表生改造與岸坡演化模式,分析研究了巖體的物理力學性質,採用修正的csmr法對拱肩槽高邊坡的巖體質量進行分級研究,在此上基礎之上,採用地質分析判斷和有限元分析等方法,對高邊坡整體穩定性進行了系統分析、計算與評價;應用塊體理論對高邊坡的局部穩定性進行了分析計算,確定局部不穩定塊體的規模、出露范圍,從而對拱肩槽高邊坡的局部穩定性有了系統全面的認識和了解。
  10. Because of the particularity of the material which is stored in the lpg ( liquefied petroleum gas ) storage, to build the storage needs rock mass that is better than others. therefore, it is very necessary to evaluate the rock mass ' s stability classification of the storage

    由於lpg洞庫存儲物質的特殊性,它對建庫所需要的巖體要求條件比較高,所以對這類洞庫進行穩定性分類評價是十分必要的。
  11. The course mainly introduce the profession standard of petroleum, which including the standard of petroleum geology survey and exploration work, the technical standard of basin research, the detailed rules of trap description, the standard of reservoir description, the technical standard of seismic data interpretation, the technical standard of test well geological work, the standard of oil - bearing rock system ' s classification and correlation, the standard of oil and gas reserves, the criterion of reservoir evaluation, the schedule standard of exploration project design and so on

    本課主要介紹石油天然氣行業標準,包括石油天然氣地質調查與勘探工作規范、盆地研究技術規范、圈閉描述工作細則、油藏描述規范、地震資料解釋技術規范、探井地質工作技術規范、含油巖系劃分與對比規范、石油與天然氣儲量規范、儲層評價標準以及勘探項目設計編制規范等內容。
  12. Based on geography and geochemistry of the rock - forming minerals in kuzigan intrusion, this paper discusses the classification, intergrowth, and crystalline sequence of minerals

    本文在巖相學和礦物化學的基礎上,著重研究了苦子干巖體主要造巖礦物的種屬、共生關系和結晶順序。
  13. Definition of arsenic rock zone borderline and its classification

    砒砂巖分佈范圍界定與類型區劃分
  14. Furthermore tunnel structure commonly is designed by analogy method. on design, often, normally in view of safe consideration, adopt the method that reduction surrounds rock classification and uses fussy construction technology. so as soon as coming, engineering investment is certainly increased and construction project time is prolonged

    且隧道結構一般按類比法設計,出於安全考慮,設計上一般採用降低圍巖類別,使用復雜的施工工藝來提高施工的安全性,這樣無形中增加了工程投資費用且延長了施工工期。
  15. Secondly, decision tree classification model and logistic regression model are performed to rock mass quality assessment, based on sas / enterprise miner

    應用sas enterpriseminer系統的決策樹分類演算法和logistic回歸演算法進行巖體的質量分級評價。
  16. The idealized mode distinguishing method in surrounding rock classification

    圍巖分類中的理想模式識別方法
  17. ( 3 ) a set of classified scheme is established, and surrounding rock classification fast estimate system based on fuzzy inference is developed, which open a new way for estimating classification of surrounding rock

    ( 3 )制定了一套適用於鷓鴣山隧道施工階段的圍巖分類方案,並研製了基於模糊邏輯推理的圍巖類別快速判定系統,為圍巖類別判定開辟了一條新的途徑。
  18. And besides, the dissertation develops the contents of traditional information construction, brings wall rock classification, high crustal stress distinguishing and rock pressure burst forecasting into information construction category, in this way, the information construction is more applicable and perfect

    並且,本文拓展了傳統信息化施工的內涵,將施工地質跟蹤調查與測試、圍巖分類、高地應力判別和巖爆預測也納入了信息化施工范疇。
  19. A new method of gaining the characters of rock and soil from the blasting drilling is studied, which is different from general methods and more economic and accurate than them. and a new rock classification is discussed, which involves fuzzy integrated judge method and the affecting factors of drilling

    為更好地進行後期的爆破設計如炸藥與巖石的優化匹配等,本文綜合考慮各種影響鉆機鉆孔速度的因素,首次提出了採用模糊綜合評判的方法對鉆孔中獲取其性質的巖石進行分級。
  20. And it is worthy to say that this method is very simple to realize and suits for practical blasting engineering. 2. a new rock, classification based the rock drillability is discussed, which involves fuzzy integrated judge method and the affecting factors of drilling

    ( 2 )以巖石本身的可鉆性為依據,兼顧考慮到其他影響鉆機鉆孔速度的各種因素,採用模糊綜合評判的方法對通過鉆孔實時獲得其性質的巖石進行分級。
分享友人