rock mass engineering 中文意思是什麼

rock mass engineering 解釋
巖體工程
  • rock : n 1 巖,巖石,磐石,巖壁;卵石;〈常 pl 〉〈美口〉石子兒;暗礁,巖礁。2 〈the R 〉直布羅陀 (Gibr...
  • mass : n 彌撒;彌撒的儀式[禱告、音樂];彌撒曲。 a high [solemn] Mass (有燒香、奏樂等的)大彌撒。 a low ...
  • engineering : n. 1. 工程(技術),工程學。2. 開車技術。3. 土木工程,工事。4. 操縱,管理。
  1. After long - term synthetic action of these factors, the complicated rock mass in the right dam foundation come into being. the adjoining rock engineering geological classification of water - conservancy and hydraulic - power project reconnaissance code ( gb50287 - 99 ), geomechanic system ( bieniawski, 1973 ), rock mass quality index z ( xiaowang, 1995 ), artificial neural network and field classification were used in the rock mass quality classification

    本文採用水利水電工程地質勘察規范( gb50287 - 99 )的圍巖工程地質分類、巖體rmr分類( bieniawski , 1973 ) 、巖體質量指數z分級(小灣, 1995 )以及人工神經網路分類,對壩區巖體按其基本指標作出定量化評分、分級。
  2. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    首先,在前人研究成果的基礎上,對錨桿與圍巖的相互作用機理進行研究,利用全長錨固錨桿的中性點理論,從等效均化的角度來考慮錨桿對圍巖的加固作用,並推導了在簡單荷載作用下,含有襯砌、等效加固后的圍巖、原始圍巖三者的彈塑性解析解,對工程設計有著重要的參考意義;在數值模擬方面,以考慮錨固圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有限元方程的計算格式,為開發運用大型商用有限元軟體msc . marc提供了理論根據,也形成了本文的理論基礎:最後,論文以南水北調東線穿黃隧洞穩定性分析項目為工程實例,利用本文所述的接觸問題的摩擦模型理論,對錨桿支護結構的應力場、位移場的變化規律進行了研究,分析了加錨支護對隧洞圍巖應力、變形的影響。
  3. And the rock mass as the main object of most engineering practice is developed by all kinds of geotechnical action and force in the long geology history to the complex characteristic of continuous medium, crannied medium and granular medium, to the anisotropic and heterogeneous entity with elasticity, plasticity, viscidity, creepocity and rheology

    作為主要工程對象的巖體是在漫長的地質歷史發展過程中經受各種地質營力作用而形成的成因和構造復雜,巖性多樣且包含了連續介質,裂隙介質和散體介質特徵的,兼有彈性、塑性、粘性、流變性的各向異性的非均質地質體。
  4. The mechanical index or parameters of rock is similar to those of other materials, they are understood and accepted easily. however geostress is one inner stress stored up in rock mass, it isn " t rock - mass " inhesion characteristics like mechanical index, but it is a mechanical state in rock masses. the stress state is generally different in similar engineering rock mass but in different space

    巖石的力學性質和指標,類同其它材料的力學性質和指標,容易被人們認識和接受;而地應力是蓄存在巖體內部的一種內應力,並不是巖體的一種固有特性,而是巖體中存在的一種力學狀態,同類巖體的地應力狀態因地而異。
  5. The establishment of srqd system inaugurates one path to surficial rock mass quality evaluation, and the establishment of irqd system is of significant value in reducing prophase engineering cost and in ensuring engineering safety. etc

    表面rqd指標體系的建立,為巖質邊坡表面破碎程度評價指出了一條未來的研究道路。整體rqd指標體系的完善對減少工程前期費用、保證工程安全等,均具有非常重要的工程意義。
  6. This paper introduces the latest progress of high level radioactive waste disposal programs in the world, and discusses the key scientific issues as follows : ( 1 ) the precise prediction of the evolution of a repository site ; ( 2 ) the characteristics of deep geological environment ; ( 3 ) the behaviour of deep rock mass, groundwater and engineering material under coupled conditions ( intermediate to high temperatures, geostress, hydraulic, chemical, biological and radiation process, etc ) ; ( 4 ) the geochemical behaviour of transuranic radionuclides with low concentration and its movement with groundwater : and ( 5 ) the safety assessment of disposal system

    在介紹國內外最新研究進展的基礎上,重點討論高放廢物地質處置的若干關鍵科學問題:處置庫場址地質演化的精確預測、深部地質環境特徵、多場耦合條件下(中(高)溫、地殼應力、水力作用、化學作用、生物作用和輻射作用等)深部巖體、地下水和工程材料的行為、低濃度超鈾放射性核素的地球化學行為與隨地下水遷移行為及處置系統的安全評價。
  7. According to the method in paper, roughness of bedrock surface of north anchor pit of runyang bridge is described in quantitative fractal dimension, and the method of determining frictional resistance of the whole anchor under many factors is discussed, which offers a new ideal and approach for precise determination of frictional resistance of rock mass engineering

    依據文中方法,對潤揚大橋北錨碇基坑建基面粗糙度進行了定量分維描述,探討了考慮多種因素條件下整個錨碇摩阻力的確定方法,為巖體工程摩阻力的準確確定探索了一條新的思路和途徑。
  8. The engineering reaction analysis is divided stability analysis of high rock slope and deformation and skidresistance of rock mass on dam abutment

    工程效應分析分成高邊坡穩定性分析和壩肩變形及抗滑穩定性分析。
  9. Therefore, the deformation mode of compound deformation rock mass on right dam abutment first is analysed before the engineering reaction is studied

    因此,在進行工程效應研究之前,首先進行了右壩肩復雜變形巖體的變形模式研究。
  10. ( 2 ) the rock mass quality was assessed based on the data obtained from exploration adits with the methods of engineering geological classification for surrounding rock mass, bq, rmr and q - system successively. and th en the correlations between the assessment results of different methods were discussed

    基於勘探平硐獲取的資料,運用「圍巖工程地質分類法」 、 bq法、 rmr法和q系統法進行了地下廠區巖體質量評價;討論了四種不同方法評價結果之間的相關性。
  11. Compute parameter data in rock mass quality assessment of the three gorge project dam foundation rock mass, and compare the results with former conclusion. the results accord with practical engineering projects

    對長江三峽大壩壩基巖體質量分級的參數指標數據進行試算,並將得到的計算結果與原結論進行比較,結果符合工程實際。
  12. According to the research results of the rock quality calculation, the columnar section digitlizing, the rock mass structure diagnosis and other methods this paper used engineering limited parameters, basic structure and evolutionary structure of rock mass as the first grade indexes, proposed the technique of dynamic engineering classification of stability of mine road surrounding rock mass ? dec ?, pointed out the method of using dec results

    基於圍巖質量計算、柱狀圖數字化與重組、圍巖結構診斷、采動應力作用后圍巖結構演化等研究成果,採用工程要求、基本結構、演化結構」為一級指標,提出了巷道圍巖穩定性動態工程分類技術、分類結構的表達技術及分類結果的應用方法
  13. All the results can be utilized by engineers, during the designing and construction. the main conclusions are listed as follows : ( 1 ) based on the shortest line between weak interbed and limit of excavation and the location of point of intersection between limit of excavation, classification of weak interbed distribution is set up, and the distance of distribution is defined ; ( 2 ) according to the strength and deformation equivalent principle, influence zone of weak interbed is introduced, and a new method to simulating the weak interbed with thickness is built ; ( 3 ) some quantificational results on influence of weak interbed respectively at crown, right shoulder and right wall are summarized ; ( 4 ) some quantificational results on influence of weak interbed with the distance between weak interbed and limit of excavation 0. 2d, 0. 5d, l. od are gained ; ( 5 ) some quantificational results on influence of weak interbed in the rock mass with confining coefficient 0. 38, 1. 0, 1. 5, 2. 0, 3. 0 are summed up ; ( 6 ) some quantificational results are summarized on influence of the underground surrounding rock mass stability with weak interbed, in the representational surrounding rock mass graded ii, iii, iv ; ( 7 ) according to the studying results some advices are suggested on designing of underground engineering

    主要結論如下: ( 1 )以軟弱夾層到開挖輪廓線最短距離和最短距離線與開挖輪廓線的交點位置為指標對軟弱夾層的分佈部進行了分類,並確定了軟弱夾層分佈距離; ( 2 )根據強度等效和變形等效的原則,引入了軟弱夾層影響帶的概念,建立了模擬軟弱夾層厚度的一種新方法; ( 3 )總結出了軟弱夾層分佈在拱頂、右拱肩、右邊墻時對地下洞室穩定性影響的量化指標; ( 4 )分析出了軟弱夾層距開挖輪廓線0 . 2d 、 0 . 5d 、 1 . 0d三種情況對地下洞室穩定性影響的量化指標; ( 5 )總結出了在不同的側壓力系數( 0 . 38 、 1 . 0 、 1 . 5 、 2 . 0 、 3 . 0 )地應力場中軟弱夾層對穩定性影響的量化指標; ( 6 )得出了在、 、代表性圍巖中軟弱夾層對穩定性影響量化結果; ( 7 )根據數值試驗成果提出了在有軟弱夾層圍巖中地下洞室設計原則的幾點新內容。
  14. Based on the discuss of the geologic environment of the high slope of spandrel groove jinping i hydroelectric power station. and the engineering geological conditions of rock mass are carefully studied in the paper. the modified csmr are adopted to perform the classification of the slope rock mass, the results of which are combined with the macroscopic stability of the high slope. on the basis of these, the methods of geological diagnosis and the finite element analysis are applied to analyze and compute the overall stability of the high slope

    本文在闡明錦屏一級水電站壩區巖體的形成和演化特徵的基礎上,詳細研究了拱肩槽高邊坡巖體的結構特徵及岸坡巖體淺表生改造特徵,建立了岸坡巖體淺表生改造與岸坡演化模式,分析研究了巖體的物理力學性質,採用修正的csmr法對拱肩槽高邊坡的巖體質量進行分級研究,在此上基礎之上,採用地質分析判斷和有限元分析等方法,對高邊坡整體穩定性進行了系統分析、計算與評價;應用塊體理論對高邊坡的局部穩定性進行了分析計算,確定局部不穩定塊體的規模、出露范圍,從而對拱肩槽高邊坡的局部穩定性有了系統全面的認識和了解。
  15. The research progressing as follows : ( l ) basic developmental character and engineering control effect of continuous macrostructure plane ( i and ii level ) of dam abutment has been systemically studied. and this kind of structural plane took important effect to appraise rock mass distortion and failure and stability

    論文研究進展主要有以下幾方面: ( 1 )系統研究了壩肩宏觀貫通性結構面(分類中的及級)發育的基本特徵以及它們的工程式控制制效應,闡明了該類貫通性結構面對壩肩巖體變形破壞及巖體穩定性評價起主導作用。
  16. ( 2 ) statistical character and engineering control effect of short and intermittent structural plane ( iiia and iiib level ) of dam abutment has been systemically studied. and this kind of structural plane took important effect to appraise whether latent discrete boundary of massif could be formed and rock mass quality

    ( 2 )系統研究了壩肩短小、斷續性結構面(分類中的_ a類和_ b )的統計特徵及其工程式控制制效應,闡明了此類結構面對能否構成壩肩巖體塊體的潛在分離邊界以及對巖體質量的評價起著重要作用。
  17. Boring, grouting and finally forming an impervious curtain in the rock mass with cracks, that is one of the most popular methods of the foundation seepage control at hydraulic and hydroelectric engineering

    採用鉆孔水泥灌漿封堵巖體中的縫隙而形成阻水帷幕,達到減少滲漏量和降低滲透壓力的目的,是水利水電工程基礎處理的重要手段之一。
  18. The text is detailed to study the deducing process of the nodal finite difference equation, and to study its application hi the rock mass engineering problems

    本文詳細研究了節點有限差分運動方程的推導過程,以及在巖土工程問題中的應用。
  19. Numerous examples of rock mass engineering indicate that the deformation and breaking law of rock mass depends on its structural characteristics and the stability of rock mass construction is controlled by the very structure of rock mass

    大量的巖體工程實例表明:巖體的變形和破壞規律取決于巖體的結構特性,巖體工程的穩定狀態受巖體自身結構控制。
  20. Surrounding rock stability analysis and evaluation are the important problem in rock mass engineering. since the new mathematical tools and computational technique are accessible, the rock mass stability classsification, an old and effective evalution method, has been developed rapidly

    圍巖穩定性分析和評價問題是巖體工程中的重要問題,巖體穩定性分類方法作為古老而有效的分析評價方法,隨著數學手段和計算技術的日新月異也得到了迅速的發展。
分享友人