round rock 中文意思是什麼

round rock 解釋
德州圓石城
  • round : adj 1 圓形的;球形的;圓筒形的;弧形的,半圓(形)的。2 兜圈子的,一周的;來回的。3 完全的;十足...
  • rock : n 1 巖,巖石,磐石,巖壁;卵石;〈常 pl 〉〈美口〉石子兒;暗礁,巖礁。2 〈the R 〉直布羅陀 (Gibr...
  1. In view of bearing capacity of the elastoplastic theory analysis, the author made a comparison between the achieved bearing capacity limit load pi / 4 of round base ( space problem ) and the limit load pi / 4 of bar groundwork foundation design ( plane problem ) from soil mechanics at home and abroad as well as foundation criterion, and explained why the value of formula in present design criterion from soil mechanics is inclined to be conservative. in the light of the author ' s many years experience of vibration test on the spot and the research work of relevant projects, the author worked over the dynamic pile testing of the bearing capacity of foundation and batholith, and gathered the parameter of dynamic analysis and testing. the author also talked over the difficult point of pile foundation design criteria in present batholith engineering world, i. e. the confirmation of batholith bearing capacity of pile end, from the following aspects : a ) confirmation of single axis counter - pressure strength of rock in house ; b ) f. e. m calculation of elastoplastic model ; c ) calculation of soil mechanics ; d ) deep well load test

    然後,對巖土工程領域至今尚未解決,甚至不為人注意的考慮地基變形的地基承載力問題進行了實用化的探討,提出了考慮地基變形的地基承載力上程計算方法;對基於彈塑性理論分析的地基承載力國內尚未見報道的空間問題得到了圓形基礎(空間問題)的承載力界限荷載p _ ( 1 / 4 ) ,並與國內外土力學專著及地基基礎設計規范中的條形基礎(平面問題)的界限荷載p _ ( 1 / 4 ) ,進行了對比,從而定量上解釋了目前設計規范引用土力學承載力公式值偏於保守的這一情況;根據本文作者多年從事現場地基工程振動試驗及相關課題的研究工作,本文以截頭錐模型模擬地基,對地基(巖基)承載力的動測法進行了研究,為各類地基(包括巖基) ,匯總了動力分析和檢測川的參數:針對日前巖土工程界應用樁基設計規范中的難點? ?樁端巖基承載力的確定問題,從巖石室內單軸抗壓強度確定、基於彈塑性模型的有限單元法計算、土力學計算及深斤載荷試驗四方面進行了深入討論;本文作者根據多年現場載荷試驗的工程實踐,對深井荷試驗裝置的核心部分? ?反力裝置,設計了側壁支撐反力加載系統,該加載系統具有實用、簡便、穩定及安個等優點。
  2. Shotcrete - rock bolt support and concrete lining are important parts of timbering structures in modern tunnel construction, and there are also essentials for natm. the intensity difference of concrete is big because of the big randomicity at the aspects of material, metage of additive, mix round, ratio of water and lime, spray construct and water maintain

    由於噴射混凝土和二次襯砌在拌和料、外加速凝劑的稱量、拌勻以及水灰比的配比、在噴射作業及灑水養護上都存在著很大的隨機性,其強度的差異也較大。
  3. To the inferior trap of rock - bottom building, ought to want special attention the following problem : ( 1 ) notice indoor moistureproof design, the ground outside basically observing indoor ground is compared wants tall how many, moistureproof measure how, judge thereby, the building fights damp ability, whether to live aptly ; ( 2 ) notice indoor facilities is designed, conduit of indoor fluctuation catchment is reasonable, observe whether conduit distribution is equitable, expedite, jam not easily ; ( 3 ) notice the establishment outdoor is designed, whether is the system such as room of the raceway groove outside be like, cesspool, water pump, catchment designed reasonable, accessary establishment leaves living room whether too close, this basically is to prevent to be all round the building generation seeper, especially after big rainstorm, be like catchment not free, the excessive outside possible sewage, by water adj / lit wide

    對于底層房屋的劣質陷阱,應當要非凡注重以下問題: ( 1 )注重室內地面防潮設計,主要觀察室內地面比外地面要高多少,防潮措施如何,從而判定,房屋抗潮濕的能力,是否適宜居住; ( 2 )注重室內設施設計,室內上下排水管道是否合理,觀察管道布局是否合理,是否暢通,不易堵塞; ( 3 )注重室外設施設計,如外溝道、化糞池、水泵房、排水等系統是否設計合理,附屬設施離居住房是否太近,這主要是為了防止在房屋四周產生積水,非凡是大暴雨後,如排水不暢,有可能臟水外溢,被水淹。
  4. A deep, round hole worn in rock by loose stones whirling in strong rapids or waterfalls

    鍋穴,壺穴巖石上深深的圓洞,由於急流或瀑布的水渦帶動疏鬆的石塊旋轉而成
  5. When i was got through the strait, i found the roof rose higher up, i believe near twenty foot ; but never was such a glorious sight seen in the island, i dare say, as it was, to look round the sides and roof of this vault, or cave ; the walls reflected 100 thousand lights to me from my two candles ; what it was in rock, whether diamonds, or any other precious stones, or gold, which i rather suppos d it to be, i knew not

    鉆過這段通道后,洞頂豁然開朗,洞高差不多有數十英尺。我環顧周圍上下,只見這地下室或地窟的四壁和頂上,在我兩支蠟燭燭光的照耀下,反射出萬道霞光,燦爛耀目這情景是我上島以來第一次看到的。至於那巖石中是鉆石,是寶石,還是金子,我當然不清楚,但我想很可能是這類珍寶。
  6. It was terribly hot and crowded at the rock concert. suddenly, everything went round and round in my head and i fainted

    搖滾音樂會場里又熱又擁擠。突然我的腦子里天旋地轉,於是我昏暈過去。
  7. ( 2 ) analysis for the forming conditions of hydrocarbon pool, structure and reservoir features shows that the sidaogou structure had two period of migration and accumulation of oil and gas. the first period of migration and accumulation came from the hydrocarbon formed in the source rock of the sanpu depression and formed the asphalt in the sandstone reservoir of triassic and jurassic in the well ha - 2. the second period came from the hydrocarbon formed in the source rock of triassic round about the well ha - 2 and ha - 3 and formed the hydrocarbon pool in the sidaogou

    這是對油藏描述技術和應用領域的完善與補充。通過對四道溝油氣藏油氣源和油氣運移與聚集研究,首次提出四道溝構造存在兩期油氣運移與聚集,指出了油氣生成與運移時期和主運移方向,以及各期油氣對四道溝現今油氣藏的貢獻大小。
  8. The article introduces the basic concepts and common methods of fuzzy mathematics, initially discussing the applications of fuzzy mathematics in the following aspects : 1 ) division of " skidding " strata with grade of membership that are drilled with diamond bits ; 2 ) comprehensive evaluation on the application in evaluation of diamond bits, classification of rock drillability, and evaluation of clay ; 3 ) classification of " hard rock " through fuzzy clustering analysis ; 4 ) estimation of completion time of boreholes and evaluation of underg round water with fuzzy mathematics ; 5 ) identification of new ore areas and option of best water resource area with fuzzy model ; 6 ) option of diamond bits and evaluation on oil field development plan with fuzzy resemble option and the improved calculation method ; ? ) prediction of mud slurry performance and of the amount of surging water in ore pits with fuzzy control ; 8 ) comprehensive evaluation of diamond bits and supporting plan of deep foundation pit with fuzzy optimal theory

    初步探討了以下幾方面的應用: 1 )用隸屬度劃分金剛石鉆進「打滑」地層; 2 )綜合評判在金剛石鉆頭評價、巖石可鉆性分級及鉆探造漿粘土評價中的應用; 3 )用模糊聚類分析進行「硬巖石」分類; 4 )用模糊數進行鉆孔竣工時間預估及地下水質評價; 5 )模糊模式識別在新礦區類型識別和最佳水源地選擇中的應用; 6 )模糊相似選擇及其改進演算法在金剛石鉆頭選擇和油田開發方案評價中的應用; 7 )模糊控制在泥漿性能和礦坑涌水量預測中的應用; 8 )優化理論模型在金剛石鉆頭和深基坑支護方案綜合評價中的應用。
  9. This system constructs the iii rock body ' s 3d figure of cu - ni sulfided mine of jinping baimazai in the round by using the database of mathematic and economical model and information, and locates the extent orientation and marginal form of this rock body. this system designs a project of iii rock body ( 650 - 755m ) ore - search according to it

    運用礦床數學經濟模型數據庫,結合探采資料,系統全面直觀地建立了金平白馬寨銅鎳硫化礦號巖體的三維形態,對礦體的深部延伸方向和邊部形態進行定位,據此對號巖體深部( 650 - 755m )作了找礦勘探設計。
  10. Under the effect of instantaneous blasting shock wave, the reliability of lining is affected. the influence on existing tunnel relates to amount of dynamite, tunnel space, area of vvok face and rigidity of round rock

    在爆破沖擊波的瞬間作用下,既有隧道襯砌安全性將受到影響,裝藥量、隧道間距、開挖面面積、圍巖軟硬程度都與爆破沖擊對既有隧道的影響有關。
  11. Take the band which you got for a price, which is round your body, and go to parah and put it in a secret place there in a hole of the rock

    要拿著你所買的腰帶,就是你腰上的帶子,起來往伯拉河去,將腰帶藏在那裡的磐石穴中。
  12. [ bbe ] take the band which you got for a price, which is round your body, and go to parah and put it in a secret place there in a hole of the rock

    要拿著你所買的腰帶,就是你腰上的帶子,起來往伯拉河去,將腰帶藏在那裡的磐石穴中。
  13. A large round rock, placed solidly on its base, was the only spot to which they seemed to lead

    只有一塊圓形的大石頭穩穩地立在那兒,似乎成了唯一的目標。
  14. Is a lead consultant with the ibm software services for websphere enablement team and lives in round rock, texas near to austin

    是ibm軟體服務部websphere enablement team的首席顧問,居住在德克薩斯州的round rock在奧斯丁附近。
  15. Under the direction of elastic - plastic statics theory, transient dynamics theory and structure mechanics theory, the means of numerical analyse is adopted in this thesis to study the security of existing tunnel. the thesis studies the contents as follovvs : ( 1 ) the bias pressure, vvhich is caused by the digging of new tunnel, deflects and deforms the lining of existing tunnel. the effect degree relates to tunnel space, construction method, topography and round rock

    本文用數值分析的手段,對既有隧道的安全性進行了彈塑性靜力分析、瞬態動力學分析和結構力學分析,如下: ( 1 ) 、新建隧道的開挖對既有隧道造成偏壓影響,使得既有隧道發生偏轉和變形,從而對隧道襯砌產生不良後果,其影響程度與隧道間距、施工方法、地形和圍巖狀況有關。
  16. The meaning and the way of the round in chinese rock painting

    中國巖畫圓的造型意味及方式
  17. Round the corner of croscent bay, between the pile - up masses of broken rock, a flock of sheep came pattering

    沿著新月海灣的地方,從一堆堆破碎的巖石堆中,一群羊叭嗒叭嗒地跑了過來。
  18. That was, at least, the end of that ; and before noon, to my inexpressible joy, the highest rock of treasure island had sunk into the blue round of sea

    那三個人的結局我知道的僅止於此。將近中午時分,藏寶島最高的巖峰也沉到蔚藍色的地平線下去了,這一切使我無比興奮激動。
分享友人