route conditions 中文意思是什麼

route conditions 解釋
路由條件
  • route : n. 1. 路;路線,路程;航線。2. 【軍事】出發令,開拔令。vt. 1. 給…規定路線[次序,程序]。2. 由某一路線發送。
  • conditions : (旅遊合同中)條件或服務項目
  1. According to premier wenjiabao " s request “ spend new thought, new system, new mechanism and new way to accelerate the old industrial base revitalize ”, to catch this very rare historical opportunity to makeover northeastern regional economy state of development, combine the actual conditions with low mercerization degree of the northeast, further give scope the important function of private economy in revitalizing the old process of industrial base of the northeast, thus explore a brand - new route of the revitalize of the old industrial base of the northeast, have great realistic meaning and important subject of the far - reaching historic significance

    按照溫家寶總理「要用新思想、新體制、新機制、新方式,走出加快老工業基地振興的新路子」的要求,抓住這個改變東北地區經濟發展狀況的千載難逢的歷史良機,結合東北地區市場化程度低的實際情況,進一步發揮民營經濟在振興東北老工業基地進程中的重要作用,從而探索出一條振興東北老工業基地的全新路徑,是具有重大現實意義與深遠歷史意義的重要課題。
  2. The principle of the eighth route army is, " guerrilla warfare is basic, but lose no chance for mobile warfare under favourable conditions.

    八路軍的方針是: 「基本的是游擊戰,但不放鬆有利條件下的運動戰。 」
  3. Under better experiment conditions, the finally production fe has about 100nm diameter, oxygen content 2. 0 %, uniform, almost sphere. the results in this paper have shown that super fine powder of fe can be prepared by this route. this make the scientific bases for reusing of feso _ 4. 7h _ 2o and

    經檢測,在較佳前驅體制備條件和較佳還原、鈍化條件下,本工藝的最終產物- fe粒度在100nm左右,均勻,近球形,氧含量2 . 0 %左右。
  4. Elimination of the next - hop route lookup bottleneck - - even under worst - case traffic conditions - - combined with the nonblocking 1g bit / sec forwarding paths allow the multigigabit router to achieve wire - speed performance

    消除下一跳躍路由查找的瓶頸(甚至在最壞的流量條件下) ,加上無阻塞1千兆位/秒轉發通道,讓千兆位路由器獲得線速性能。
  5. This paper theoretically inquires into the general principles and the transporting requirements for large item transport. by expounding and proving all kinds of transport plans, the paper gets an effective whole reading transport plan, including the choice of the transport route, the analysis of the bridge and road, the founding of a special transport organization. for transporting the container successfully, the paper carefully analyzes the route and conditions of transporting it, and gives several possible programs. by the way, this paper states every detail of whole reading transport and tries to give each solution of every problems

    本文對大件運輸的一般規律和運輸要求進行了理論探討,根據核反應堆壓力容器的結構特點和運輸要求,經過各種運輸方案的論證,確定出一種行之有效的全公路運輸方案,選定運輸線路,分析道路橋梁狀況,建立運輸組織機構,使該大件順利運達目的地。本文詳細說明了核反應堆壓力容器運輸線路條件和幾種可能的方案,闡述了全公路運輸方案的各個細節及所解決的各種運輸技術難題。
  6. Abstract : considering the characteristic of mixed traffic in chinese cityies, and the different given conditions, the author develops combinatorial mathematical programming models involving travel choice / destination choice / mode choice / route choice on the basis of symmetrical deterrence and presents the proof that the optimal solutions satisfy the random choice conditions

    文摘:考慮到我國城市混合交通擁擠的特點,針對不同的條件,作者給出了基於對稱阻抗的出行、訖點、方式和路徑隨機選擇的綜合模型,並證明該模型的最優解能滿足出行、訖點、方式和路徑隨機選擇的要求。
  7. The planned route is fixed according to sea area, ship condition and weather element. then we may correct the route, rudder and engine in the light of wind currency and obstacle as well as make control in accordance with actual state, economy and requirement to obtain the relevant avoidance data by using of ais or arpa and offer the corresponding navigational safe areas in connection with the various navigational areas and conditions

    利用ais ( automaticidentificationsystem ,船舶自動識別系統)或arpa (自動雷達標繪儀)獲得相關的避讓數據,對相同海域航行的船舶態勢及船舶長度進行避航領域的推算,將其結果與實際調查的情況進行擬合和數據處理,針對不同的航行區域與條件,給出相應的航行安全領域。
  8. The hsinchu science - based industrial park administration has been improving outside transportation links with the construction of an overpass over kuangfu road connecting to gpngdao fifth road in the north rood connecting hsip second road to the sun yat - sen freeway ; and a connecting route joining hsip first road and gpngdao fifth road in the north. these three newly completed roads have greatly improved traffic conditions at the hsip. a real - time traffic monitoring system was installed at the park in 2001

    在改善園區交通品質方面,新竹科學園區管理局增設區內停車位,以解決區內停車問題至於聯外交通,園區北接公道五跨越光復路陸橋工程已於89年完成,中山高園區二路專用道工程於90年元月完工,園區一路北接公道五30米聯絡道路於90年10月通車,此三項新辟道路工程,對園區交通紓解助益甚大,園區新設之路況即時監測系統亦已於90年11月完工啟用。
  9. Dynamic routing implies that some set of current conditions affect the specific route a message takes

    動態的路由是指當前的某些條件影響了它所攜帶的具體的路由信息。
  10. Abstract : a method named multi - times optimization is presented to solve the multi - specification optimization problem, which is difficult to solve using the variational optimal theory. in the method several demands are reduced to some sub - tasks. in every subtask a demand that can not be transformed into bound condition is taken as performance specification for optimazation, and the other demands are taken as bound conditions. by means of the method, the arrival time, number of turn, turn angle of the aircraft in the terminal area are selected as performance specification separately, and the general character of optimal flight route in the terminal area is given

    文摘:為了給飛機提供一條能滿足多種指標要求的最優飛行軌跡,針對變分最優理論難以求解多指標優化問題,提出了命名為多次優化的方法,即將多要求的優化任務分成先後相繼的多次任務,每次任務中選取一種不能邊界轉化的要求作為最優性能指標,而其餘要求轉化為邊界條件.利用這一方法以時間、轉彎次數、轉彎角度為最優性能指標給出了終端區最優飛行軌跡的一般特徵
  11. This paper, beginning with the world - famous erp software sap r / 3, studies the business process of erp software, clarifies the three characteristics of erp software, and discusses how to construct the business process system of the software and how the system be connected with enterprise entity. with regard to the carrying out of erp, the thesis provides two methods of basic data collecting which are compensation to each other. as to the phenomenon that erp are commonly carried out with low success rate in china, the paper makes a deep research into bpr which is closely associated with the operation of erp, and proposes the suggestion that a proper bpr route should be chosen according to the practical conditions of the enterprise

    本文從關心民族erp軟體應如何發展和中國實施erp成功率不高的角度出發,從一流erp軟體sapr 3著手研究了erp軟體中的業務流程問題,構造了erp軟體如何與企業的業務流程相映射和如何規劃企業業務流程的一套體系;討論了erp實施中的基礎數據收集問題,給出了兩條互為補充的基礎數據收集方法;結合前人的研究結果和筆者在企業的實習經歷,討論了在中國的環境下與erp相結合的bpr的兩條路徑。
  12. At concretion means, these mostly adopt systematology route to proceed inquisition, on the basis of reference both here and abroad production, compare objectively analyses technological change with agriculture surplus labor transfer of compartment " correlation, by the major premise of science and technology, handle science and technology philosophy, sociology, management science, statistics, economics, mathematical statistics, demography, and so on. compare overall systematically approach the feasibility, reliability, elementary path of agriculture surplus labor transfer under conditions of scientific - technical progress

    本研究主要採用系統科學的方法,在參照國內外研究成果的基礎上,比較客觀地分析了科學技術進步與農業剩餘勞動力轉移之間的相互關系。運用科技哲學、社會學、管理學、統計學、經濟學、數理統計、人口學等學科的知識,比較全面系統地探討了在科技進步條件下,農業剩餘勞動力轉移的可能性、可行性、基本路徑等。
  13. The system has a satisfactory variety of functions, strong adaptability, and is easy to use. another system is also developed for supervision and decision - making of ship navigation. the system can analyze navigation conditions, select and check navigation route based on data from physical and mathematical models

    該系統應用物理模型和數學模型的計算結果,結合形象、直觀的圖形顯示,能方便地對河道的航行條件進行分析,並能進行航線的選擇和檢驗;通過設定多個參數的大小,能進行各種不同的航行演示,滿足實際的需要。
  14. Commercial concrete and concrete truck and pump truck will be used for this construction. concrete casting route and pump truck allocation will be according to the site conditions

    1本工程砼均採用商品砼,砼罐車運輸,泵車澆築。澆築路線及泵車就位布置根據現場具體情況確定。
  15. Because of route - leaning formed in the course of state corporate innovation, faulty property system, imperfect capital market and china ' s entering wto in undeveloped economic conditions, there are financial risks in decreasing state capital. the risks have four types : losing state assets, control potence, share - business fluctuating and influencing financial structure of corporate. such is elaborated by the third chapter

    第三章《國有資本減持財務風險的原因及類型分析》對此作了詳細的闡述,並且分析了國有資本減持財務風險的四種類型? ?國有資產流失風險、控制權風險、股市波動風險、影響企業財務結構風險。
  16. An outline is given of the objective and content of the reform of feedstock route in large chemical fertilizer units, with emphasis on the operation and process conditions after worm

    摘要概述了大化肥裝置進行原料路線改造的目的及內容,重點介紹了改造后的運行情況和工藝狀況。
  17. This lack of maritime surveillance and disaster preparedness is not unique to the great circle route, but the nasty local conditions are

    對海運監督的缺失和對海難準備工作的不足,對大圓航線來說並不少見,糟糕的當地情況亦是如此。
  18. The middle route project of s - n water transfer is a long route one, crosses 4 basins of the yangtze river, the haihe river, the yellow river, the haihe river, and the engineering geologic conditions differ greatly

    摘要南水北調中線工程線路長,跨越長江、淮河、黃河、海河4大流域,工程地質條件差異較大。
  19. The safety installation of the automobile bumpproof is a very hot topic nowadays, and it is also one of the most important part of intellectual traffic. we use the compound radar and fm coding technology, choose the unique route to produce and develop the expressway automobile bumpproof and alarming installation, which solve the " false alarming " problem that occurs while b eing interrupted in the complicated traffic conditions

    汽車防撞安全裝置是當今世界的熱門話題,是智能交通的重要組成部分,我公司開發生產的高速公路汽車防撞報警裝置採用復合雷達和調頻編碼技術,選擇獨特的技術路線,解決了復雜交通環境下因干擾而產生的"虛警"而且作用距離遠,反應速度快,可靠性高。
  20. The test results show that the grain sizes do not reduce further after 6 passes of ecap, the slip systems of ferrite is mainly belonging to { 110 } < 111 > and { 112 } < 111 > slip system family during the first and the second pass of the ecap with route c, and under the annealing conditions of 300 ~ 550 x lh, ultrafme grains are thermally stable

    研究發現,在c方式ecap變形中,各道次ecap變形細化程度不同, 1道次細化效果最大,隨后道次細化作用逐步減少,變形6道次為實驗用鋼的ecap晶粒細化的極限。鐵素體c方式ecap變形第1和第2道次的主要滑移系為{ 110 } < 111 >和{ 112 } < 111 > 。
分享友人