route completion 中文意思是什麼

route completion 解釋
選路完成; 排路完畢
  • route : n. 1. 路;路線,路程;航線。2. 【軍事】出發令,開拔令。vt. 1. 給…規定路線[次序,程序]。2. 由某一路線發送。
  • completion : n. 1. 成就,完成,實現;【數學】求全法。2. 期滿;畢業。
  1. International air fare : upon the successful completion of the contract ( transportation must be economy class and the most direct route from the point of origin )

    國際旅差費:于合同圓滿完成前支付(受聘方國家最近距離經濟艙往返國際機票) 。
  2. For self - help tourists, the tourism process has been some unusual experience, no established route lack of professional tour guides, it relies solely on the relevant information and guidance on the completion of the unfamiliar environment of sightseeing, shopping

    對于自助旅遊者來說,旅遊過程都是一番不尋常的經歷,沒有既定的路線,沒有專業的導游,它完全依靠一些相關信息的介紹和指導完成在陌生環境下的觀光、購物。
  3. Article 7 after the completion of the engineering project, the owners shall submit all the explanatory data, such as the route chart and position chart of the submarine cables and pipelines, to the competent authorities for the record, and send duplicates to the harbour superintendence organs

    第七條鋪設施工完畢后,所有者應當將海底電纜、管道的路線圖、位置表等說明資料報送主管機關備案,並抄送港監機關。
  4. According to the design theory of the cable - stayed bridge and to the feature of the cantilever construction the authors propose a construction control method called optimum completion state method ( ocsm ) for rc cable - stayed bridges in the proposed method, the optimum completion state is regarded as the final target of the construction control, and the optimum construction state at each construction stage is taken as the technical route the key of the method is to properly choose or adjust the cable forces the objectives function of optimization is to minimize the elevation error of the girder under the constraint condition that the internal forces ( bending moments ) of the girder are bounded the optimization variables are the cable forces on the basis of the above principles, a optimum model for a construction step is established and cable force adjustments can be found for each construction step in this model, the creep and shrinkage effects of concrete have been considered a bridge example is given which shows that the final state of the bridge is very close to the design aim and that this method is much better than the so - called double - control method the example is a good illustration of the soundness and practical value of the proposed method

    根據現代斜拉橋結構設計理論和懸臂施工方法的特點,提出了以最佳成橋狀態作為施工控制的最終目標,以實施最佳施工階段為技術路線,以索力調整為核心內容的斜拉橋施工控制理論,簡稱為最佳成橋狀態法;以斜拉橋主梁標高誤差最小為目標函數,以主梁內力(彎矩)為約束條件,以索力為優化變量,建立了最佳施工階段的索力調整計算模型;推導了考慮徐變收縮效應的索力調整計算公式;用最佳成橋狀態法對一實橋工程進行了施工控制全過程計算研究,得到的成橋狀態與設計目標相當接近,優于該橋以「雙控」為控制目標的實測結果,有力地證明了本文方法的正確性及其工程實際價值
  5. Route 7 kennedy town to aberdeen is currently planned for completion by 2010 because of the unavailability of land

    因用地缺乏,七號干線(堅尼地城至香港仔段)現計劃於2010年前完成。
  6. Route 7 ( kennedy town to aberdeen ) is currently planned for completion by 2010 because of the unavailability of land

    因用地缺乏,七號干線(堅尼地城至香港仔段)現計劃於2010年前完成。
  7. Whether the scheduled completion date of route 3 will be affected as a result of the above situation

    三號干原定的竣工日期會否因上述問題而受影響?
  8. The port of zhangjiagang handled 15 million tons of cargo with its 20 ten - thousand - ton berthes and 10 regular routes to japan, singapore, hongkong, the mediterranean and other countries in europe and america. the overall water freight capabilities have been enhanced significantly with the completion of ten - thousand - ton oil tanker berth in port of liujia, the opening of the route from port of changshou to city of nantong and other expansion projects. additionally, the city is served two airports, shuofang airport in the west and guangfu united airlines airport in the south

    港口建設初具規模,地處長江下游的張家港,已建20w上萬噸級泊位,年吞吐能力達1500萬噸,已開通到歐美地中海,日本新加坡香港等10多條航線太倉市境內的瀏家港,水深岸直,全長11 . 5公里,且臨近吳淞口,是建設上海分流港的理想之地,萬噸級油輪碼頭已基本建成。
  9. Route 7 kennedy town to aberdeen land unavailable planned completion date 2010

    七號干線堅尼地城至香港仔
  10. We will be adding an east - west strategic route linking the eastern part of the new territories to the airport upon completion of this section of route 8

    八號干線這個路段完工之後,我們就會增添一條東西行的主要幹道,把新界東部與機場連接起來。
  11. On completion of the works in mid - 2008, hong kong will be adding an east - west strategic route linking the eastern part of the new territories to the airport

    當工程在2008年年中完成後,香港將增添一條東西行的主要幹道,把新界東部與香港國際機場連接起來。
  12. To enhance the safety of motorists and the flow of traffic between nam wai and ho chung areas, phase iii of the improvements to hiram s highway ( the main route to sai kung ) began in march 1999 for completion by the end of 2001. the work involves realignment of the road in the two areas

    為促進道路安全,以及改善南圍與蠔涌的來往交通,政府在一九九九年三月展開西貢公路第三期改善工程,修改這條通往西貢的主要幹道由南圍至蠔涌一段的路線。
  13. Interim traffic improvement measures identified under the alternative alignments study for route 7 would proceed for completion by early 2006

    此外,在七號干線選線研究中提出的中期交通改善措施亦應手推行,以期在2006年年初前完成。
  14. The planning of route 7 would be kept under review. interim traffic improvement measures identified under the alternative alignments study for route 7 would proceed for completion by early 2006

    此外,在七號干線選線研究中提出的中期交通改善措施亦應手推行,以期在2006年年初前完成。
分享友人