sand filling 中文意思是什麼

sand filling 解釋
填砂
  • sand : n 1 沙。2 〈 pl 〉 沙灘,沙洲,沙地,沙漠。3 〈 pl 〉 沙粒;(計時用的沙漏中的)細沙。4 光陰,時...
  • filling : n. 1. 裝滿,填裝;填補。2. 填料;填土。3. (糕點內的)餡。4. (織品的)緯紗,漿料。
  1. Individual sand bodies, filling erosional features cut by a river, may be elongate or arcuate depending on the course of the river.

    充填在河流切割形成的侵蝕地貌中的各個砂體,在形狀上可以是伸長狀的或弓形的,這要決定於河流的河邊。
  2. Aiming at the factors affecting the strength of paste filling material, the relation between affecting factors and strength of paste filling material is revealed on the basis of a lot of experiments in the lab, in which the river sand was used as skeletal material

    摘要針對影響膏體充填材料強度的因素,通過大量的試驗,揭示了以河砂為骨料的膏體充填材料強度與各影響因素間的關系。
  3. Taking the measure of uncorking on the steel tube and filling water before sand filling, the installation process of sand compaction piles is optimized, the installation parameters and testing rate under the near shore condition are confirmed, and the control and testing methods for the piles ' quality are summarized

    採取樁管壁開孔、先灌水后灌砂的方法,優化了水上擠密砂樁的施工工藝;給出了在近岸無掩護、水流急的施工條件下的施工參數和檢驗比率,總結了沉樁定位、高程式控制制、灌砂率等參數的控制措施和檢驗方法。
  4. Descending into the grotto, he lifted the stone, filled his pockets with gems, put the box together as well and securely as he could, sprinkled fresh sand over the spot from which it had been taken, and then carefully trod down the earth to give it everywhere a uniform appearance ; then, quitting the grotto, he replaced the stone, heaping on it broken masses of rocks and rough fragments of crumbling granite, filling the interstices with earth, into which he deftly inserted rapidly growing plants, such as the wild myrtle and flowering thorn, then carefully watering these new plantations, he scrupulously effaced every trace of footsteps, leaving the approach to the cavern as savage - looking and untrodden as he had found it

    然後,走出洞來,把那塊石頭蓋回原處,在上面堆了些破碎的巖石和大塊的花崗石碎片,又用泥土填滿石縫,移了幾棵香桃木和荊棘花種植在這些石縫里,並給這些新移種的植物澆些水,使它們看起來象是很久以來就生長在這兒的一樣,然後擦去四周的腳印,焦急地等待他的同伴回來。他並不想整天地去望著那些黃金和鉆石,或留在基督山島上,象一條似的守護著那些沉在地下的寶藏。
  5. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水庫面板堆石壩壩基處理和防滲的原則及設計要點.趾板基礎和堆石體各區砂礫石基礎開挖,除趾板與其下游1 / 9底寬范圍以及壩腳挖除沖積層至弱風化(局部微風化)基巖外,其餘部分均予以保留.斷層破碎帶處理,趾板部位採用混凝土塞,其它部位採用半透水料置換,並根據本工程特點在下游壩腳加設了反濾層.為提高壩基的整體性和防滲性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面板堆石壩的設計和研究提供參考與借鑒
  6. Cementitious capillary crystalline waterproofing coating ( abbreviated ccwc ) is a new type of cement - based waterproofing materials, which is characterized by its very good adhesive performance and impermeability to water, self - rehabilitating ability, permanent waterproofing effect, good aging resistance and corrosion resistance, simple construction method and harmless to hunman etc. ccwc consists of ordinary portland cement, quartz sand and reactive substances and other supplementary ingredients, whose reactive substance can permeate into the internal part of concrete structures through water and produce insoluble crystals filling capillary pores or crack of the concret through reaction with cement hydrates and unhydrates

    水泥基滲透結晶型防水材料是以硅酸鹽水泥或普通硅酸鹽水泥、石英砂等為基材,摻入活性化學物質而組成的一種新型防水材料。摻入的活性化學物質以水作載體向混凝土內部滲透,與混凝土中未水化的水泥及部分水泥水化產物發生結晶反應,生成不溶於水的結晶體,堵塞毛細孔道,使混凝土緻密、防水。這種防水材料具有粘結力強、抗滲性能好、自愈合能力強、防水效果持久、耐老化、耐腐蝕、易施工、對人類無害等特點。
  7. Firstly, we account for the former made and the sand selected are reasonable by experiments. then we develop the first project carrying the experiment for filling up of 30 years. contrasted with the count, the results have no difference, we carried two experiments under different water levers by the actually facts if engineering work in early days. by the result, we know that the gross of fill up have no difference

    本文從白石水庫泥沙模型試驗入手,模型試驗首先通過模型糙率和模型選沙驗證試驗,說明模型製作和選沙是合理的;然後開展初設方案30年運用水庫淤積試驗,並與數模計算對比,基本相同;試驗結合工程初期運用實際情況,進行了兩個不同初期運用水位方案的對比試驗,從兩個方案試驗結果看,初期運用的兩個方案淤積總量差別不大,而從效益看,方案二優于方案一。
  8. Prevention of quality accident for drill hole filling pile in sand soil foundation

    砂土地基鉆孔灌注樁質量事故預防
  9. Research of step - by - step advancing implementation technique of using sand filling long bags as the base

    充沙長管袋褥墊進占施工技術探討
  10. Practices show that the compressive strength, the modulus of elasticity, the permeability coefficient and the compactness of concrete obtained respectively by the compaction method, the unconfined compression static compaction method, the sand trenching and filling method, and nuclear densimeters meet the requirement of design, and the mixing proportion of concrete of the side - wall is reasonable

    實踐證明施工中用擊實法、無側限抗壓靜力壓實法、挖坑灌砂法及核子密度儀分別檢測出的邊墻混凝土抗壓強度、彈性模量、滲透系數和密實度值均滿足設計要求,邊墻混凝土配合比合理。
  11. Over traditional methods used in this region, method of sand bedding pre - elevating and step water - filling pre - compressing has advantages in shorting construction period, simplifying construction. furthermore, this method solves the difficulty induced by constructing at rain season

    與本地區傳統的施工方法相比,砂墊層預抬高分級充水預壓法不僅工期短、施工方法簡便,而且克服了雨季施工的困難。
  12. Based on comparison of several technical schemes, the method of sand bedding pre - elevating and step water - filling pre - compressing is adopted. so the dissertation is consist of two parts : ( 1 ) the applicability study for the method of sand bedding pre - elevating and step water - filling pre - compressing, including numerical analyses for the thickness of sand bedding, the consolidation, settlement and stability of foundation, drainage, possibility of foundation liquefaction under seismic loading, et al. ( 2 ) monitoring at construction stage and checking the effect of foundation treatment, including the measurements of the settlement velocity and non - uniform settlement of ring beam under the tank, pore pressures and horizontal displacements in foundation, the pressure distribution at the bottom of oil tank and the strength increase of soils

    通過多種技術方案比較,最終選擇了技術先進的砂墊層預抬高分級充水預壓法,論文工作主要由以下兩部分組成: ( 1 )砂墊層預抬高分級充水預壓法的適用性研究,其中包括砂墊層厚度、地基沉降與固結度、地基穩定性、降水、地震作用下砂土液化的可能性等方面的計算分析; ( 2 )施工監測與地基處理效果檢驗,其中包括油罐環梁基礎沉降速率與不均勻沉降程度、各分級充水加載階段地基超靜孔壓與深層水平位移、油罐底板壓力分佈及地基土強度增長等方面的實測與數據分析。
  13. So far as the mixing material for building the earth - rock fill dam with clay core for shiquanhe hydropower station is concerned, the effect from the variation of the sand content for the filter material on the maximum dry density and the relevant parameters are to be determined within the variation area of the mixing mass ratio of ( 46 ~ 54 ) : ( 54 ~ 46 ) through this experiment, due to the max, dry density is largely influenced by the mixing ratio of both the lifter material and the clay and the sand content of the filter material, so as to determine the actual filling compactness of the mixing material of the core

    摘要由於獅泉河水電站粘土心墻土石壩摻合料的最大幹密度受反濾料與粘土料的摻合比例、反濾料含砂率的影響較大,因此擬通過本試驗確定摻合質量比在( 46 ~ 54 ) : ( 54 ~ 46 )范圍變化時,反濾料含砂量變化對最大幹密度的影響程度及相關參數,從而確定心墻摻合料填築的實際壓實度。
  14. And also about the objective conditions for developing is given to the well consolidation technology with sand - packs in soft foundation treatment area and the consolidation technology with cement - mixed piles in transitional section of road and bridge areas, and the detailed introduction is also given about workmanship for filling works in subgrade body, for filling works in transitional sections of the subgrade, and for construction of base bed of the subgrade. in each part caution items in the construction and the relevant technical issues are summarized

    然後著重介紹了秦沈客運專線一般軟土地段地基處理袋裝砂井加固技術、路橋過渡段水泥攪拌樁加固技術,並對路基本體填築施工工藝、路基過渡段填築施工工藝,路基基床施工工藝也進行了詳細的介紹,在每一部分中對施工注意事項及有關技術問題進行了總結歸納。
  15. The professor then produced two glasses of wine from under the table and poured the entire contents into the jar, effectively filling the empty space between the sand

    教授接著從講桌下拿出兩杯酒,全部倒入蛋黃醬罐,充分地填滿了沙子間的空隙。
  16. Attentions have to be paid to coating ingredient, smearing, sand filling and compaction for metal seeping defect prevention

    闡明了為防止滲金屬缺陷,在塗料配製、塗掛、加砂緊實中應注意的問題和具體工藝。
  17. It can be said that they are right now carrying out the largest ever sand - filling land reclamation project in china

    可以說啊,他們正在進行中國有史以來規模最大的填灘造地工程。
  18. Methods of test for masonry units - determination of volume and percentage of voids and net volume of clay and calcium silicate masonry units by sand filling

    磚石結構的試驗方法.通過添加沙對硅酸鹽磚石體的體積和孔隙及凈體積百分率的測定
  19. Methods of test for masonry units - part 9 : determination of volume and percentage of voids and net volume of calcium silicate masonry units by sand filling

    圬工單位試驗方法.第9部分:用沙充填法測定硅酸鈣圬工單位的體積空隙百分率和凈容積
  20. Methods of test for masonry units - part 9 : determination of volume and percentage of voids and net volume of clay and calcium silicate masonry units by sand filling ; german version en 772 - 9 : 1998 a1 : 2005

    圬工單位的試驗方法.第9部分:通過添加鹽測定黏土和硅
分享友人