section construction 中文意思是什麼

section construction 解釋
分段施工
  • section : n 1 (外科、解剖的)切斷;切割;切開。2 【外科】切片,【金相】磨石。3 (果子的)瓣。4 【數學】截...
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總結了斜拉橋的發展及其施工工藝,並指出了橋梁施工控制的重要性之後,簡要的介紹了工程概況,敘述了炳草崗金沙江大橋監控細則、組織機構及監控的主要工作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋施工控制與監測工作的前期實驗工作和施工各工況標高、各節段支模標高、澆注混凝土后的標高的結構計算和其理論計算結果之後,詳細論述了主梁的標高線形控制方法和內容,實際支模標高的提出,結構應力監控的方法、布點、測讀及其對測讀數據的合理分析方法,索力檢測和結構溫度監測的方法。
  2. This thesis tries to solve the problems in the design and construction of jinping cascade 2 hydropower station. a typical section is selected to analysis seepage, seepage control and fem numerical simulation. the influence of different plans of excavation and support on seepage field of subsurface water and stability of adjoining rock are studied. the homologous support pattern is suggested according to the research results

    本文就錦屏二級水電站(一期)深埋長隧洞的設計和施工中面臨的一些問題,選取隧洞的一個典型斷面進行滲流、滲控分析和開挖及支護的有限元數值模擬,從而就深埋隧洞不同的開挖及支護方式對地下水滲流場及圍巖穩定性的影響和所應採取的支護措施等方面進行了探索、研究。
  3. This paper introduces construction technique and method of asphaltum concrete surface in a construction section of reruan road in songbei district of harbin city

    本文介紹了哈爾濱市松北新區熱源路道路工程某施工路段瀝青混凝土路面面層施工工藝和方法。
  4. From the analysis, some suggestion about joint rigidity design is put forward : 1. joint initial rigidity can be enhanced within the limited range when to increase end - plate thickness ; 2. the rigidity and ultimate moment can be enhanced obviously when to adopt the beam with inclined section or to add axilla at the connections between beam and column ; 3. withm the permissive construction condition, exteriorly extended end - plate inclinedly placed is suggested to be applied firstly ; 4. when the rate of joint rigidity to beam rigidity, that is called, is less than 0. 1, the joints can be regarded as zero - rigidity joints ; on the other hand, if is more than 26, it is rigid connection joints

    採用斜截面梁並在樑柱交接處局部加腋能明顯提高節點剛度和梁的抗彎能力; 3在允許的施工條件下,應優先採用外伸式端板斜放節點,有利於提高節點剛度,進而提高節點的抗彎能力; 4節點剛度與其連接構件的剛度比值0 . 1時,可按鉸接節點設計; 26時,可按剛接節點設計。
  5. Where the building lot for a building and connected facilities in a hot spring area is subject to a restriction requiring the installation of a pedestrian footpath to be set back from the building line or the side of a roadway within the building lot, the city / county ( municipal ) government with due jurisdiction shall consider the particular situation of the hot spring area in setting the principles for review of the setback distance or exemption from setback in accordance with article 263, paragraph 2 of the building design and construction section of the building technical regulations

    溫泉區建築物及相關設施之建築基地,受應自建築線或基地內通路邊退縮設置人行步道之限制者,直轄市、縣(市)政府應考量溫泉區特殊情形,依建築技術規則建築設計施工編第二百六十三條第二項規定,就退縮距離或免予退縮,訂定認定原則審查。
  6. Considering to the continuous rigid - frame bridge construction characteristic, putting forward the idea of reverse to optimize prestressed steel. according to different construction phases, the paper gets the formual of the cantalever phase, join two section of a bridge phase and the vertical prestressed steel, and works out corresponding program

    考慮大跨徑預應力混凝土連續(剛構)橋施工的特點,提出了基於倒裝方法的預應力靜定束、合龍束以及豎向束的優化設計理論,並編制了相應的計算程序。
  7. The following are the large projects undertaking by haifeng company : crude oil electricity plant project of north china oil field hydroelectricity factory, apartment ( 22 stories ) of yuanda real estate company of dalian shipping group, helios hotel of helios group in dalian development zone, tilt aqueduct bridge of shanxi hongqi reservoir ( total span : 267m ), supply and sale building and city construction building ( both are antique architectures ) of shanxi heyang city, sea drainage pipe of hainan fudao fertilizer factory ( 1520 ), 8 oilgas docks of hainan haiyan oilgas company, basha condensable gas transfer station of haiyan company, 10, 000m3 oilgas storage tank of arco company ( usa ) in hainan nanshan, gas pipe and fuel gas installation project of hainan nanshan electricity co., ltd, base and accessory project of hainan gas company, bei da huang cereal and oil market in harerbin, hainan cross island pipe, changhuajiang river pipe crossing project, taihangshan mountain earthwork project ( the 19th section of west - to - east gas transmission project )

    海南海峰公司承建大的工程項目:華北油田水電廠原油發電站工程;大連船泊集團遠達地產公司的遠達公寓( 22層) ;大連開發區香港太陽神集團的太陽神大酒店;陜西紅旗水庫斜拉渡槽工程(全跨267m ) ;陜西合陽供銷大樓及城建大樓(均為仿古) ;海南富島化肥廠排海管線( 1520 ) ;海南海燕油氣公司八所油氣碼頭;海燕公司白沙液化氣中轉站;海南南山美國阿科公司儲油氣萬立米大罐工程;海南南山電力股份有限公司天然氣管線及燃氣安裝工程;海南南海天然氣有限公司基地及配套工程;哈爾濱北大荒糧油批發市場;海南環島管線;昌化江穿越工程;西氣東輸十九標段,太行山土石方工程。
  8. Based on the project imbrued especially by hunan province construction office, the study of this paper includes four parts as follows : the first part does some simplify on the characters of the rc material under high temperature. after transferring the rc section under fire to equivalent one at normal temperature based on the stiffness and intensity equivalent, the rc members under fire can be calculated as ones at normal temperature

    主要研究內容如下: ( 1 )基於剛度等效或強度等效原則,根據截面各點材料力學性能的退化,把受火鋼筋混凝土非均勻截面等效成常溫下的鋼筋混凝土截面,使得高溫下構件剛度和強度的計算可按常溫下的計算理論進行。
  9. Agricultural implement tyres in diagonal and radial construction - normal section tyres

    斜線花紋和徑向花紋的農機輪胎.公稱截面輪胎
  10. Tyres for industrial and lift trucks ; part 1 : normal section sizes in diagonal construction

    工業用和升降用卡車輪胎.第1部分:斜線花紋公稱剖面規
  11. To do the investigating and studying work about the achievements of tackling key problem of the quondam exploration of front - zone of mountain, to analyze and study the applicability about the gathering technology used in the seismic exploration of the complicated construction belt of front - zone of mountainous ; 2. combining the quondam achievements, researching the design method of observation system objective of the complicated construction belt based on seismic - geology model, firstly, building the surface level and deep layer seismic - geology model of complicated construction belt and analyzing the forward model, secondly, designing the observation system aiming at the overthrust nappe structure in section and in area ; 3. aiming at the complicated earth ' s surface condition of front - zone of mountain, how to select the exciting method and the parameter, how to optimize the environment of exciting method and reception, how to pledge the normal combination of the datum of different exciting method ; 4

    根據山前帶的地震地質條件特點,本文主要研究了以下幾個方面的內容: 1 、對以往山前帶地震攻關成果開展調研工作,分析研究在山地山前復雜構造帶所採用的地震勘探採集技術的適用性; 2 、研究基於地震地質模型的復雜構造帶觀測系統目標設計方法:如何建立復雜構造帶的表層、深層地震地質模型,利用正演分析目標區的觀測系統;針對逆掩推覆體構造,如何分區分段有針對性設計觀測系統等; 3 、針對復雜地表條件的山地山前帶,如何選擇激發方式、參數,如何優選激發、接收環境,如何保證不同激發方式的資料能正常拼接; 4 、山前帶巨厚礫石區的表層結構調查技術及靜校正方法研究。
  12. Petrifaction industry section in plan for construction, the stretch of the oil refinery project at the southern bank of meizhou bay

    規劃建設石化工業規劃小區,承接湄洲灣南岸煉化一體化石化項目延伸。
  13. This section of stagecraft is designed to explore the special techniques and materials used in scenic construction

    舞臺藝術的課程主要是探討舞臺景片搭建中使用的特殊技術和材料。
  14. The application of tbm construction method in 7 tunnel of connection section of yellow river diversion project

    萬家寨引黃北干線1號隧洞出口段優化設計
  15. First, according to measured data and literature, the river channel evolution rule and its reasons in the southern branch of the yangtze river are discussed from the perspectives of historic evolution, recent evolution and the tendency prediction of river channel evolution. besides, the local reservoir has been studied from the changes in thalweg and section as well as the calculation of local erosion and deposit. consequently, the stability and feasibility of reservoir construction in the river section are approved

    首先根據大量實測資料及文獻資料,就歷史變遷、近期演變、河演趨勢預測等方面,初步探討了長江口南支河段河道演變規律及原因,並具體就深泓線的變化、主槽斷面變化、局部沖淤計算等方面對擬建水庫局部區域進行了分析,論證了工程河段建設水庫的穩定性及可行性。
  16. Design and application of multiple arch trestle type retaining wall of whole section construction

    全拼裝連拱支架式擋土墻的設計與應用
  17. The paper discusses mechanism performance, durability and resistance to de - icing salt concrete, this kind of concrete is made with air - entraining agent or silica fume and used in the trial section construction of benxi - dandong freeway ' s charge square which is located in dandong

    本文通過在混凝土中摻入引氣劑或硅粉,來配製抗除冰鹽混凝土,並對其進行力學性能和耐久性測試,重點試驗其抵抗鹽凍能力,並用於本丹高速公路丹東段的收費廣場試驗路施工。
  18. The study of in - situ stress section construction of an oil well in the south ch ina sea basing on logging data

    南海某油井地應力剖面的測井構建研究
  19. Problem exploration of residential section construction

    居住區建設中存在問題探討
  20. Upright method of hull section construction

    船體分段建造正裝法
分享友人