seepage analysis 中文意思是什麼
seepage analysis
解釋
滲漏分析-
Unconfined seepage analysis with composite element method
無壓滲流分析的復合單元法 -
With the calculation model, the seepage simulation calculation fem of slab joints and face slab with dense cracks becomes possible, and thus an effective way for seepage analysis with fem of cfrd under the extreme condition of slabs to be destroyed is provided
藉助于這些模型,使得面板接縫及密集裂縫型面板滲流的有限元模擬計算成為可能,從而為在面板發生極端破壞情況下面板堆石壩的有限元滲流分析提供了有效的途徑。 -
Air element methad for modeling drainage holes in seepage analysis
滲流分析中排水孔模擬的空氣單元法 -
Study on parameter of composite element method for modeling drain hole in seepage analysis
滲流分析中排水孔模擬復合單元法的參數研究 -
Unsteady seepage analysis of tailings dams considering coupling of stress and seepage fields
考慮應力場與滲流場耦合的尾礦壩非穩定滲流分析 -
Seepage analysis using 3 - d finite element method for composite dam of guanyinyan hydropower station
觀音巖水電站混合壩的三維有限元滲流分析 -
By using the aperture curve and roughness curve, the author of the dissertation has put forward the concepts of frequency hydraulic aperture and frequency roughness for the first time. of the two concepts, the first or frequency hydraulic aperture has got some advantages of its own in the seepage analysis
3 、本文首次利用寬配和糙配曲線,提出頻率隙寬和頻率粗糙度的概念,特別是頻率水力隙寬的提出,為解決現有隙寬應用中出現的局限性具有極大的幫助作用。 -
Seepage analysis and infiltration quantity calculation of huanggou pumped - storage power station upper pond
荒溝抽水蓄能電站上庫滲漏分析及壩基滲漏估算 -
An example is given ; and the result is compared with that of the test. the better identical result indicated that the three - dimension model must be adopted in the seepage analysis of the complicated topographical tailings dam ; and the appropriate predigestion can satisfy the precision and reduce the complicity and difficulty
結果表明,對復雜地形的尾礦壩滲流分析時必須採用三維模型,三維數值計算中對復雜地形進行適當的簡化和概化對結果的影響較小,可以滿足精度要求,因此大大減小了計算的復雜程度和難度。 -
3d steady seepage analysis using p version adaptive fem
型自適應有限元分析 -
Steady seepage analysis of 2d consolidation of tailing dams
尾礦壩二維固結穩定滲流分析 -
Seepage analysis in new austria tunneling method with compressed air
壓氣新奧法隧道施工中的滲流分析 -
Three - dimensional seepage analysis for complex topographical tailings dam
復雜地形尾礦壩的三維滲流分析 -
The seepage analysis and safety accessment of the main dam of sanba reservoir
三八水庫主壩滲流分析及安全評價 -
Seepage analysis considering drainage holes by p - version adaptive composite element method
型自適應復合單元法分析 -
Equivalent continuum model and its application to the seepage analysis of rock slope
巖質邊坡滲流場中等效連續介質模型的應用 -
Most other seepage analysis software packages do not take these relationships into account
許多其他滲流分析軟體不考慮這些關系。 -
Seep / w is a general seepage analysis program that models both saturated and unsaturated flow
是一個通用的滲流分析程序,模擬了飽和和非飽和流態。 -
( 4 ) coupled with seepage analysis, side slope ' s stabilization was calculated, then parameter of soil was deduced for reference when strengthen. ( 5 ) the duncan e - v model was adopted to analyze dam before strengthen so as to estimate the original stress and displacement status
( 4 )結合滲流分析的結果,對萌山水庫大壩的抗滑穩定進行計算分析,並用反演分析法反求其達到穩定要求時的土體參數,供加固處理時控制。 -
Composite element method for simulation of discontinuous surface and drainage hole in seepage analysis
滲流分析中排水孔和不連續面模擬的復合單元法
分享友人