shaft tunnel 中文意思是什麼

shaft tunnel 解釋
地軸弄,軸隧
  • shaft : n 1 箭;箭桿。2 (槍、槌、斧等的)柄;矛。3 【植物;植物學】稈;莖;柄。4 【動物;動物學】羽軸;...
  • tunnel : n 隧道;地道;坑道;管道,煙道,風洞;【礦物】石巷,平峒。 tunnel warfare 地道戰。vt (〈英國〉 l...
  1. A gray brick tunnel, dimly lighted, led to the elevator shaft.

    一條點著昏暗燈光的灰色磚砌通道通往電梯的並道。
  2. Excavation method for inclined shaft excavation in headrace tunnel at zipingpu water conservancy project

    紫坪鋪工程引水系統復雜地質條件下洞群進洞技術
  3. Pillow block or tunnel shaft bearing

    軸道軸承
  4. Using a vortex - flow drop shaft to convey water from a high level to a diversion runnel under the condition of high water - head and large discharge is a new kind of technology in the scheme of reusing a diversion tunnel as a discharge tunnel

    近年來,為解決高水頭、大流量導流洞改建泄洪洞的技術難題,旋流式豎井泄洪洞逐漸成為研究熱點之一。但迄今為止,該技術尚未得到推廣應用,其主要原因在於人們對豎井螺旋水流運動特徵缺乏足夠的了解和深入的研究。
  5. Tunnel shaft bearing

    中間軸軸承
  6. As stated in paragraph 2 of appendix to annex 4. 8 of volume two of ifp, vitiated air from the tunnel is discharged vertically from exhaust shaft of the ventilation building

    建議邀請書第二冊附件4 . 8的附錄的第2段註明,隧道的濁氣會由通風大樓的抽氣塔垂直排出。
  7. The main work is done with the help of model experiment. in the flood - relief experiment, the flood carrying capacity of spillway tunnel is checked. in the hydraulic experiment of the diversion power conduit system, the followings are studied : the flow condition and fluctuation in the surge chamber, the distribution of flow velocity before the rack in the surge shaft, the amplitude of stage in the quick gate bay etc. the test step, content and results of different proposals are introduced in details

    本項優化試驗研究的目的主要在於,通過泄洪系統整體水力學試驗,校核泄洪洞的泄流能力;通過發電引水系統整體水力學試驗,研究調壓井內水流流態和水位波動情況、調壓井內攔污柵前流速分佈情況;確定快速閘門井內水位波動幅度;試驗確定壓力管道水擊壓力穿井系數以及泄洪洞弧形門處的水壓力。
  8. Safety of unshielded tunnel boring machines and rodless shaft boring machines for rock

    鉆巖石用無護板的隧道掘進機和無桿軸掘進機的安全性
  9. Safety of unshielded tunnel boring machines and rodless shaft boring machines for rock ; german version en 815 : 1996 a1 : 2005

    巖石用無防護隧道鉆機和無桿鉆井機安全
  10. Analysis of engineering example of corrosion from groundwater to concrete of tunnel and shaft

    豎井混凝土工程腐蝕的實例分析
  11. Specifications for construction and acceptance of mine shaft and tunnel structure

    礦山井巷工程施工及驗收規范
  12. Safety of unshielded tunnel boring machines and rodless shaft boring machines for rock ; german version en 815 : 1996

    無防護平巷掘進機和插入巖石的無鉆桿豎井鉆機的安全
  13. Construction of shaft for feeder orifice of delivery tunnel in dahuofang reservoir

    大夥房水庫輸水隧洞投料孔豎井施工
  14. Rapid excavation construction technique of gate shaft for right diversion tunnel of xiluodu hydropower station

    溪洛渡右岸導流洞大型閘門豎井快速掘進技術
  15. Means any place in which, by virtue of its enclosed nature, there arises a reasonably foreseeable specified risk, and without limiting the generality of the foregoing, includes any chamber, tank, vat, pit, well, sewer, tunnel, pipe, flue, boiler, pressure receiver, hatch, caisson, shaft or silo in which such risk arises

    指任何被圍封的地方,而基於其被圍封的性質,會產生可合理預見的指明危險,在不局限於這個一般性的原則下, 「密閉空間」包括任何會產生該等危險的密室、貯槽、下桶、坑槽、井、污水渠、隧道、喉管、煙道、鍋爐、壓力受器、艙口、沉箱、豎井或筒倉。
  16. To take an actual example, the triple pipe method has been adopted to consolidate the surrounding soil by rotary shot grouting pile and swaying shot diaphragm wall in the construction of vertical shaft and access drift of running tunnel from martyr ' s park to dong shan kou station in no. l line of guangzhou metro. it turns out that this method has met the double effect of both construction support and waterproof

    作為施工實例,在廣州地鐵一號線烈士陵園至東山口區間隧道的豎井及聯絡通道施工中,採用三重管法對周圍地層實施了旋噴樁和擺噴墻加固,達到了施工支護和防水止滲的雙重效果。
  17. Deformation and control of surrounding rock in 8 inclined shaft area of wushaoling tunnel

    烏鞘嶺隧道8號斜井區域圍巖變形與控制
  18. Severe protests from local residents living along mrt routes during the route alignment coordination caused a two - year delay to the proposed schedule for the hsingchuang line. therefore, to reduce the extent of tunneling is a key consideration in the long - term planning of mrt routes. other downsides to the single tunneling method are that it requires longer construction time, and that two break throughs from the tunnel to the work shaft involve a higher construction risk

    另因採用單孔潛盾隧道須鉆掘上、下行隧道,除施工時程較長外,且兩次破鏡將增加施工之風險,故有鑒于潛盾機之技術日新月異,國外已有採用多圓形潛盾工法( mf工法)之成功案例,此除可減少用地徵收補償之困擾外,且可減少隧道開挖面積進而減少棄土所造成之問題。
  19. Consideration in the long - term planning of mrt routes. other downsides to the single tunneling method are that it requires longer construction time, and that two break throughs from the tunnel to the work shaft involve a higher construction risk

    (一)本局規劃手冊所引用之消防逃生設計大多以美國國家消防協會( national fire protection association , nfpa )中針對定軌運輸系統設計之nfpa - 130規范為藍本,再配合本地建築法規及消防法令,故有必要重新檢討法令適用問題及如何配合修訂相關法規。
分享友人