shear bar 中文意思是什麼

shear bar 解釋
底刀片
  • shear : vt vi (sheared 〈古語〉 shore; shorn sheared)1 剪(羊毛等);修剪(樹木);剪(呢絨的)長毛。2 ...
  • bar : BAR = Browning automatic rifle 白朗寧自動步槍。n 巴爾〈南斯拉夫港市〉。n 1 棒,桿,條;棒狀物。2...
  1. The existing theoretical analyses have n ' t refelcted this true mechanism of the force transfering in fixed segment of anchor bar. for the sake of studying the working course from elastic to elastoplasticity slide better, this paper put forward shear stress - displacement curve, and solve the internal force distribution along anchor bar by the basic equntion. at the same time, this paper analysize the difference of columniform fixed segment and the segmeng with anchor slab at the foot of anchor bar

    為了更好的研究錨桿在不同荷載作用下,錨桿的工作狀態從彈性到彈塑性發展的整個過程,本文進行了錨桿受力的模型實驗研究,根據實驗結果提出了剪應力與位移的彈塑性本構關系表達式,並根據錨桿受力的基本方程,求解得出了錨桿在不同工作狀態下從彈性到彈塑性滑移的全過程中錨桿的內力分佈。
  2. Based on the numerical simulation and accuracy analysis to previous slab ' s test with the ansys program, the study of composite wall, with various detail design under potential load action respectively or jointly is carried on and the wall ' s atress behavior and failure mode is obtained, also the influence to wall ' s stiffness and bearing capacity by kinds of factors, including wall ' s shear span ratio, member ' s section, bar arrangement, etc. based on the hammer blow test and stiffness test, a 1 / 3 scale ten - bay model ' s modality parameter and elastic deformation characteristic is analyzed

    在對密肋復合墻板運用ansys ~ ( ( ? ) )程序進行數值模擬、分析驗證的基礎上,對典型組合墻體在不同連接構造和不同荷載效應組合作用下的受力形態和破壞模式進行研究;計算分析了復合墻體剪跨比、邊框柱截面尺寸、邊框柱配筋大小以及墻板內肋梁肋柱配筋等諸多因素對密肋復合墻體承載力及剛度的影響,得出其變化規律。
  3. It still works well when the mulched straw is more then lot / ha. ( 3 ) an experiment was conducted on a self - made testing equipment to investigate the chopping properties of wheat straw under different conditions. on the basis of testing results, main cutting curves of wheat straw were given under different cutting speeds of rotary blade, with different straw lengths, different moisture contents, different cutting position, different thick of knife edge, with and without shear bar

    ( 3 )為了研究帶狀粉碎防堵裝置對麥秸的切碎效果,在特製的實驗臺上,應用了虛擬儀器測試技術對不同處理的麥稈進行了切斷試驗,得到了在不同切割速度下對不同長度、不同含水率的麥稈、麥稈的不同切割部位以及有定刀和無定刀情況下的切斷率,為麥秸粉碎裝置的設計提供了依據。
  4. Sliding displacement of beam longitudinal bars in staggered joints is smaller than in ordinary joints, and the beam bar " overstrength in staggered joints is more serious than in ordinary joints when shear force is equal in the two types of joints

    2在節點所受剪力相同的情況下,錯層節點中梁縱筋的粘結滑移比普通節點的要小,梁筋的超強更嚴重。
  5. The work in this thesis mainly includes following parts : 1. as for box girder cross section, the three - bar stimulation method under typical loads and supports has been introduced. the force and stress formulae for flanges have been derived from the three - bar method. by reasonable simplification for multi - cell box girder, the three - bar method has been applied in multi - cell box girder ' s shear lag analysis

    對于箱形截面主梁,本文介紹了三桿比擬法上、下翼板中比擬桿的計算公式,以及在典型荷載和支承的情況下翼板內各桿的應力計算公式,並對多箱式主梁截面進行合理簡化,使三桿比擬法應用於多室箱梁的剪力滯分析。
  6. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術工程分類及適應范圍進行了理論上的分析研究;然後結合工程實例對該項技術進行了方案設計,對比幾種不同的托換方案和節點及構造設計,提出了「通筋穿柱法」做承臺梁, 「抗彎抗剪錨筋法」強化柱加固效果, 「鋼板箍法」做地基梁鋼筋連接點等多項技術;在施工方案的研究和實施過程中,對于工程施工組織進行綜合闡述,並就人工挖孔樁、承臺梁、地下加層及結構加固、整體結構穩定等專項施工方案提出有針對性的施工技術措施,人工挖孔樁施工採用鋼筋砼護壁確保挖孔樁的安全成型,使用柔性連接鉤進行鋼筋籠吊裝簡化施工工序;承臺梁施工採用梁主筋橫穿柱身化學膠錨固等;地下加層綜合施工技術採用土方分層對稱平衡開挖,分段挖土做筏基結構自穩等;最後對于該工程實施后的效果分析,說明該項綜合施工技術的可行性。
  7. Thecalculating results show that the composite action between concrete floor and steel beamsgreatly influence the bending bearing capacity and initial rotational stiffness of joints, it shouldbe considered in practical engineer. reinforcement ratio of lengthways reinforcing bar andthe stiffener of web have great influencer on the behavior of connections, while the thicknessof end - plate and degree of shear connection have a litter influence on its behavior

    分析計算結果表明:樓板與鋼梁的組合作用對節點的抗彎承載力及初始轉動剛度的影響非常大,實際工程中節點設計應當考慮這種組合作用;樓板內縱向鋼筋配筋率與柱腹板加勁肋對節點性能影響顯著,而連接端板厚度及剪力連接程度的影響則不是太顯著。
  8. Its hysteretic curve is plumper, its ductility coefficient and energy dissipation capacity have been improved remarkably. the inclined staff of the steel bar truss has a restraining faction to the development of the crack, and the phenomena is that there has more crak and larger distributing area on the shear wall, which is an important token of the improved seismic capacity. concealed steel bar truss has the faction of increasing the height of plastic hinge area, which is another important token of

    研究結果表明:內藏鋼桁架高剪力墻與普通高剪力墻相比:屈服荷載和極限荷載均比顯著提高;屈服剛度明顯提高;其滯回環相對飽滿,延性系數及耗能能力顯著提高;內藏鋼桁架高剪力墻,其鋼桁架斜桿對裂縫發展有控製作用,現象是墻體上的裂縫較多、分佈域較廣,這是抗震耗能能力增強的重要表徵;內藏鋼桁架高剪力墻有增大底部塑性耗能區域的作用,這是抗震耗能能力增強的另一重要表徵;內藏鋼桁架還有顯著提高抵抗剪力墻基地剪切滑移能力的作用。
  9. In this thesis, a new strip chopping anti - blocking mechanism and a new no - till planter operating well in heavy straw mulching condition are developed from the following aspects : ( 1 ) in order to solve the problem that the no - till planters can not work well when the mulched straw is long and thick, especially in the double cropping area of huabei plain where the winter wheat gives a high yield, a new strip chopping anti - blocking mechanism was developed. it consists of a group of rotary blades, a narrow tine opener, a shear bar, a hood and a deflector

    在以下幾個方面進行了較為深入的研究: ( 1 )在對國內外免耕播種機防堵裝置研究的基礎上,針對華北一年兩熟地區麥收后地表覆蓋量大的特點,通過對驅動式和從動式防堵裝置的對比實驗,設計出一種具有高效防堵能力的帶狀粉碎防堵裝置,該裝置由組合刀片、開溝器、定刀片、罩殼和導草扳組成。
  10. The experimental study on the seismic behavior of six 1 / 3 scale and shear - span ratio 2. 2 high - rise shear walls, including a high - rise shear wall with steel frame, a high - rise shear wall with steel truss, a high - rise shear wall with steel frame - steel truss, a high - rise shear wall with steel bar truss, a high - rise shear wall with steel - steel bar truss and a usual one, has been studied

    6個試件包括1個普通混凝土高剪力墻、 1個內藏鋼筋桁架混凝土高剪力墻、 1個內藏鋼框架混凝土高剪力墻、 1個內藏鋼框架-鋼筋桁架高剪力墻、 1個內藏鋼桁架混凝土高剪力墻及1個內藏鋼-鋼筋組合桁架混凝土高剪力墻。
  11. On the basic of former research men ' s experience, 18 experimental members ( including 9 simple beams and 9 restrained beams ) are designed and tested. in the experiment, phenomena are observed and record by taking photos in the whole process from the first crack appears to test members crash completely, experimental data is attained including load values of crack - appear load, critical load and terminal load, stress values of reinforcing steel bar stress, compressed concrete stress and beam flank stress and values of deflection etc. by analyzing the crack ' s appearing and developing form and stress values of concrete and steel bars, the crash modes of test beams are defined ; shearing force - deflection curves are contrasted and analyzed ; the effects on shear strength of the three factors as shear span ratio, concrete strength and restraining moment are also analyzed

    借鑒已有試驗的經驗,本文設計和完成了對18根超高強混凝土無腹筋梁(包括9根簡支梁和9根約束梁)在集中荷載下抗剪強度的試驗,觀察了試件從裂縫出現到完全破壞失去承載能力全過程的試驗現象並通過拍照進行記錄,獲得了試件的斜裂縫出現荷載、臨界斜裂縫荷載和極限荷載等荷載值和縱筋應變、混凝土受壓應變和梁側混凝土應變等應變值以及撓度值等。
  12. In this thesis, based on the theories of corrosion expansion force and the elasticity, by adopting the theory of reinforced concrete structures, the durability problems of reinforcing concrete structures considering the corrosion of reinforcing bar are studied systematically, such as the change of steel mechanical properties, the bond strength between corroded reinforcement and concrete, the shear carrying capacity and the flexural carrying capacity of the corroded reinforced concrete ( rc ) structural elements

    本論文以鋼筋混凝土構件為研究對象,基於銹脹力研究理論和彈性力學,採用鋼筋混凝土結構基本原理,系統地研究了鋼筋銹蝕后鋼筋混凝土結構的耐久性問題,例如鋼筋的力學性能,銹蝕鋼筋與混凝土之間的粘結強度,剪切強度,抗彎強度等。
  13. The results show that the antipunching shear bearing capacity and ductility of frame column underpin system are improved by installing coupling bar at the interface of the new - to - old concrete and enlarging the reinforcing bars at the centre and upper position in the underpinning beam

    結果表明:設置新老混凝土界面連接鋼筋和增大托換梁中部和上部配筋可提高框架柱托換體系的抗沖剪承載力和延性。
  14. In order to predict the antipunching shear bearing capacity of the frame column underpin system, the stress mechanism of underpin system and the influences of different coupling construction of underpinning interface and the bar of underpinning beam on the antipunching shear bearing capacity and failure form of frame column underpin system were studied experimentally

    摘要為了能夠準確進行框架柱托換體系抗沖剪承載力的預計,通過試驗研究了托換體系的受力機理以及托換界面不同的連接構造、托換梁配筋勸框架柱抗沖剪承載力和破壞形態的影響。
  15. The experimental study on the seismic behavior of six mid - rise shear walls with 1 / 3 scale and shear - span ratio 1. 85 has been done. the six mid - rise shear walls include a shear wall with steel frame, a shear wall with steel truss, a shear wall with steel frame - steel bar truss, a shear wall with steel bar truss, a shear wall with steel - steel bar truss and a usual one

    6個試件包括1個普通混凝土中高剪力墻、 1個內藏鋼框架混凝土中高剪力墻、 1個內藏鋼筋桁架混凝土中高剪力墻、 1個內藏鋼框架-鋼筋桁架混凝土中高剪力墻、 1個內藏鋼桁架混凝土中高剪力墻及1個內藏鋼-鋼筋組合桁架混凝土中高剪力墻。
  16. 3 ) a study is carried out to understand the changing rule of ultimate load and stiffness with the different reinforcement ratio of anti - punching shear bar. the increasing speed of the ultimate load is slower than that of the reinforcement ratio is indicated

    3 .對不同抗拔鋼筋配筋率的鋼筋混凝土承臺-鋼柱腳抗拔極限承載力和剛度變化規律進行了計算分析,發現了隨著承臺中抗拔鋼筋配筋率的提高,其承載力提高的比例逐步減小的規律。
  17. 3. some suggestions for seismic tectonic measure of shear wall with concealed steel bar truss have been presented. and some advice for seismic design of this new shear wall has been put forward

    3 .給出了內藏鋼桁架混凝土組合剪力墻的抗震構造措施,提出了該新型剪力墻結構的抗震設計建議。
  18. Analysis of shear failure characteristic of non - web bar circular reinforced concrete beam

    圓形截面無腹筋梁斜截面破壞形態分析
  19. The curves showed that the moisture contents of straw and the shear bar are the main factors impacting the cutting ratio besides cutting speed. the speed of 40mm / s is necessary to cut off wet straw. ( 4 ) the testing results indicate that the rotary speed of the blade axle need to be more then 1230 rpm ( rotary radius of the blade is 25cm ) to cut off straw ( with moisture content less then 20 % )

    試驗結果表明,對于乾的長秸稈,刀片切割速度達到15m / s時,切斷率達100 ;對于乾的短秸稈,刀片切割速度需達到20m / m / s以上;要切斷濕秸稈需要有40m / s以上的切割線速度;加定刀與不加定刀對于切斷麥秸這類軟質秸稈是非常重要的,其切斷速度差別很大;另外,麥秸不同部位所需要的切斷速度也是不一樣的,根部較之頂部和中部更難切斷。
  20. This paper solved the optimum installed angle anchor bar in anchored joint by considering the shear dilatatility of joint and utlizing the mises yield criterion

    本文根據基本理論分析,考慮節理的剪脹效應並利用mises屈服準則求解得出了加錨節理面抗剪的最優安裝角。
分享友人