shifting of load 中文意思是什麼

shifting of load 解釋
裝載貨物的移動
  • shifting : adj. 1. 變動的;移動的;多[易]變的。2. 想盡辦法的;盡量設法的。3. 用權謀的;哄騙的;狡賴的;詭詐的。n. 1. 轉移;移動;移位;偏移。2. 變化;轉變。3. 狡賴;遁詞詐術等的使用。
  • of : OF =Old French 古法語。
  • load : n 1 裝載,擔子;負擔;工作(負荷)量。2 (車船等的)裝載量;一馱,一車,一飛機。3 【電、機】(機...
  1. This paper uses for reference with an example of frame - shear wall structure and studies the conceptual design and method for optimizationof structural system. through establishing frame - shear wall structure unisonous differential eguation and finding a result, the side shifting curve, moment and shear force distribution curve are obtained under inverted triangle load action on the frame - shear wall structure. after analyzing and comparing, the range of best rigid characteristics for such structure has be gotten

    本文結合框架-剪力墻實例,研討了結構體系的概念設計和整體優化方法。通過建立框-剪結構協同工作的微分方程及求解,得出框-剪結構在倒三角形荷載作用下的側移曲線、彎矩、剪力分佈曲線,經分析對比,得出框-剪結構最佳剛度特徵值區間。
  2. Through the analysis of application effect of heat - stored electric boiler in changdu hotel, the article brings forward that the system s benefit for the environmental protection and peak load shifting and improvement of the economic operation level of the power grid

    摘要通過蓄熱式電鍋爐系統在昌都飯店的實際應用效果分析,提出採用該系統有利於保護生態環境,有利於電網移峰填谷,提高電網經濟運行水平。
  3. In order to describe the actual working processes of dielectric barrier discharge ( dbd ) circuit, an analysis model of differential - difference equations was presented, based on the working modes of full bridge serial load resonant dbd circuit, which was adopted with phase shifting control

    摘要為描述介質阻擋放電型臭氧發生器電路的實際工作過程,在分析一種移相全橋脈寬調制下串聯負載諧振電源供電的臭氧發生器電路的基礎上,提出了採用微分差分方程來描述電路的工作過程,並給出了電路可能的工作軌跡。
  4. The static loading test for three group of testing piles of jiading power plant secend stage project are analyzed and studied in this thesis, and the practical applying of high - accurate data collector, technique of waterproof insulation and testing technique of burying in the body of pile are introduced also. the vertical and horizontal loading features of three group of piles of different kind and constructing technique in different earth layer at the pile point are analyzed and compared and summed up with basic integro - differential equation calculating the pile earth system load transmit, transforming principle of stress - deforming and pile body rating of burying electric measuring element. changing law of stress, and changing law of pile body shifting and bending for different testing piles under vertical and horizontal load are showed so that the loading features of soil layer and pile at testing spot, reliable design data for pile type and base for scientific construction technique are provided

    本文僅就嘉定電廠二期工程中的三根試驗樁的靜載試驗進行了分析和研究,利用樁土體系荷載傳遞分析計算的基本微分方程及應力-應變轉換原理,結合預埋電測元件的樁身率定,對三組不同種類、不同施工工藝、不同持力層中的樁的豎直、水平承載特性進行了分析、比較和歸納,通過大量、全面的實測數據,經過整理、轉換和推演,揭示了不同試驗樁在豎直、水平荷載作用下的應力變化規律和樁身變位、撓曲變化規律,最終提供試驗場地土層和樁的承載特性,為該工程合理設計樁型提供了可靠的設計參數,為確定科學的施工工藝提供了有力的依據。
  5. Then take power usage of the commercial and residents for example, the paper analyzed these two kinds of consumers ’ potential of shifting load by using quantitative method. the analysis told that tou tariff should be spread wider and applied in electricity employment of the business and the residents throughout all of the country

    同時,以商業用電、居民用電為例,採用量化分析方法分析其移荷潛力,說明峰谷分時電價應擴大實行范圍,在全國范圍內對商業用電、居民用電實行分時電價。
  6. As one of power prices to consumers, tou ( time - of - use ) power price is applied in many countries in the world, and it is one of the important methods of dsm ( demand service management ). it can accomplish the goal of load shifting and reducing costs of power consumers

    作為用戶側電價的一種,分時電價目前在世界各國得到了廣泛的應用,而且分時電價是需求側管理的一種重要手段,可以達到削峰填谷與減少用戶購電費用的目的。
  7. Simulation results show that tou power price determined in this paper can achieve the objective of load shifting and reducing costs of power consumers. compared with existing work, tou power price determined in this paper can get better effect of load shifting and reducing costs of power consumers

    模擬結果表明,本文確定的分時電價可以達到削峰填谷和減少用戶購電費用的目標,與現有工作比較,本文方法確定的分時電價可以達到更好的削峰填谷作用,使用戶購電費用更小。
  8. In this paper determination of tou power price is studied and three approaches are brought out : use mcp ( market clearing price ) to determine flat load ' s power price, then determine the power price of peak and valley loads ; determine power price of peak, flat and valley loads according to optimization of load shifting ; determine power price of peak, flat and valley loads according to load shifting and reducing costs of power consumers

    本文對分時電價的確定進行了探索性研究,提出了確定分時電價的三種方法:用市場清除價確定平時段電價,然後在此平時段電價基礎上確定峰、谷電價;根據削峰填谷最優同時確定峰、平、谷時段電價;根據削峰填谷和用戶購電費用最佳均衡同時確定峰、平、谷時段電價。
  9. The initial strain must be the optimum value obtained by multiple - trial method. 5. in the static analysis of the bridge model under live load, assuming a shifting concentrated load on the girder, analyzing the relation map of each section deflection and the location of the concentrated load, finishing the load - on of the worst - case live load, then the moment and deflection envelope diagrams of the girder were obtained

    成橋模型建立后,在後續活載作用下的靜力分析必須首先在主樑上作用移動集中荷載,分析主梁各斷面的活載撓度與集中荷載作用位置關系曲線圖,完成最不利活載的加載,從而最後得到懸索橋主梁的彎矩包絡圖及撓度包絡圖。
分享友人