side load 中文意思是什麼

side load 解釋
邊荷載
  • side : n 1 (左右上下等的)邊,側面;(事物內外等的)面,方面;(人、物等的)旁,旁邊。2 〈數〉(三角形...
  • load : n 1 裝載,擔子;負擔;工作(負荷)量。2 (車船等的)裝載量;一馱,一車,一飛機。3 【電、機】(機...
  1. They put a stock of candle ends into the lantern, hung the latter to the off side of the load, and directed the horse onward, walking at his shoulder at first during the uphill parts of the way, in order not to overload an animal of so little vigour

    他們把一些蠟燭頭放進提燈,把提燈掛在車右邊,就牽著馬向前走,最初的一段路是向上走的坡路,他們就走在馬的旁邊,免得這匹缺少力氣的老馬負載過重。
  2. Abstract : the paper probed the analysis on the adding mode of perpendicular load in multistorey building structures, the bending moment of frame side beams and the top, the bending moment of secondary beams, the difference between the tie - beam, plane - frame analysis and the space analysis on the path of conduct force, ect. it can be used as a reference when probing these problems

    文摘:討論了在多項高層建築結構分析中垂直荷載加載模式的選擇,框架邊梁和次梁端部的彎矩計算,連梁問題和平面框架分析與空間分析在傳力路徑上的差別以及單片剪力墻平面外彎矩等問題,可供同類結構內力分析時參考
  3. Unfortunately, the numerating model used in such method is quite different from the actual instance, and the constraints are to o simple, the effects of the side load, elastic modular of the stone body of the foundation and the compatible structural deformation are not involved in. due to the asymmetry of the spatial load, it is quite different between the analysis results and the test data

    這種集中計算方法力學模型的建立與結構的實際受力情況出入較大,且對邊界條件考慮過于簡單,對邊荷載的影響、基礎巖體彈模的影響及結構本身變形協調一致等均未能一併考慮,對于空間受力不對稱的狀況,作為二維問題分析時計算結果與應力測試結果出入較大。
  4. 3. we attack the reduction of peak load problem at repository side applying queue theory

    基於排隊論,提出一種在存儲庫端應用緩存器的證書狀態信息分發方法。
  5. The major meaning provided in this paper is that it provides a load balancing design scheme about signaling gateway, involving protocol side and protocol itself, complet the integration of trillium distributed strategy and signaling gateway. this load banlacing design has a general framework that is independent from the actual protocol stack, and can give a reference to load balancing design of telcom software product as well

    本文工作的主要意義在於提供了一種基於負載均衡的信令網關實現方案,涉及了協議體間和協議體內的負載均衡,完成了基於trillium分散式策略的大型電信軟體與信令網關的集成。這種負載均衡方案,具有獨立於協議棧的通用結構,可以成為類似電信軟體的負載均衡設計的借鑒。
  6. This paper uses for reference with an example of frame - shear wall structure and studies the conceptual design and method for optimizationof structural system. through establishing frame - shear wall structure unisonous differential eguation and finding a result, the side shifting curve, moment and shear force distribution curve are obtained under inverted triangle load action on the frame - shear wall structure. after analyzing and comparing, the range of best rigid characteristics for such structure has be gotten

    本文結合框架-剪力墻實例,研討了結構體系的概念設計和整體優化方法。通過建立框-剪結構協同工作的微分方程及求解,得出框-剪結構在倒三角形荷載作用下的側移曲線、彎矩、剪力分佈曲線,經分析對比,得出框-剪結構最佳剛度特徵值區間。
  7. The air conditioning or heating water systems with primary water system in heat source or cold source side and secondary water system in load side divided by direct connection mode need to adopt connectors or water mixers

    摘要用直接連接方式劃分熱源(或冷源)側一次水和負荷側二次水的供暖或空調水系統,需要採用連通器或混水器。
  8. The stresses and nonlinear deformations of thin strip - plate with two simply supported edges under the coupled action of the electromagnetic field arid mechanical load are calculated, the magneto - elastic effects on thin current - carrying strip - plate by the side current and electromagnetic induction density are studied

    由此計算分析兩邊簡支條形薄板在電磁場和機械載荷耦合作用下的應力與變形,研究側向電流和外磁場強度對載流條形薄板的磁彈性效應。
  9. Through analyzing all kinds of construction methods of building metro station under shield driven method in many countries, this paper studies the construction technique ( method ) of building metro station under shield driven method, taking in guangzhou no. 3 metro line, and linhe xilu station as the actual object. according to station class, function and topography and geology, the station schemes of twin - bore tunnel ( island ), firstly, three parallel tunnels ( island ), tri - bore tunnel ( island or side ) and four parallel tunnels ( island or side ) are proposed. secondly, the shape and main parameters of station structure on two schemes are analyzed with load - structure mode, for different overburden depth of tunnel and lining thickness, etc. thirdly, the construction process is simulated in 2d fem.,

    根據建站的規模、使用功能及站位地形地質條件,提出了兩連拱結構島式站臺車站、三條平行隧道島式站臺車站、三連拱結構島式和側式站臺車站以及四條平行隧道島式和側式站臺車站方案;採用荷載?結構模式,對四種方案的主體結構的形式和重要參數進行分析研究,分不同的埋深、襯砌結構厚度和拱形結構的拱跨比進行了多組數值計算;採用平面有限元方法對四種車站結構的開挖施作過程進行了模擬分析。
  10. There are parallel grooves or scratches produced when the glacier moved with its load of embedded rock on the lower side.

    冰川帶著低處嵌著的巖石活動時,形成了這些一條條平行的溝槽或擦痕。
  11. Secondly, the math model of the high - speed pm generator with a shielding is deduced. the method of how to analyze the electromagnetic field of the generator is introduced. and with the help of a kind of fem software, the parameters of a model machine are calculated and simulated, including the electromagnetic field, no - load voltage, single - side magnetic force, loaded torque and axial force

    其次,對轉子帶防護罩的高速永磁發電機數學模型進行了推導,介紹了利用有限元法對電機磁場進行分析的方法,並運用有限元軟體對一臺樣機的參數進行了模擬,包括電機磁場分析、空載電壓波形、單邊磁拉力、負載轉矩以及軸向力等方面的內容。
  12. Firstly, for the system of moulding board and support frame in construction the side pressure and screws are analyzed. the material and structure form of support frame are discussed. the design of support frame uses the method of limited state, and also it analyses the integer stability, part stability, and single stability, and then proposes the load analysis of multi - level support frame

    首先,針對轉換層梁模體系及支撐架施工,重點分析了轉換層結構現澆混凝土對模板側壓力值及模板對拉螺桿的計算;討論了轉換層支撐體系的形式及構造,詳細論述了基於極限狀態設計的支撐架計算方法,包括縱橫向水平桿的強度驗算、立桿的整體穩定性、局部穩定性、單肢桿件穩定性等驗算,並提出了多層支撐架的施工荷載計算方法。
  13. On the bright side, there s plenty of space for the web page root var www htdocs, and if i really need to load something else, i can probably move some files into home and set up a symbolic link

    如果程序是用java語言編寫的,並使用sax解析器讀取xml ,那麼可以安裝norm walsh的編目篩選程序(現在屬于apache xml commons project )作為
  14. In the mean time, i fitted my self up for a battle, as before ; though with more caution, knowing i had to do with another kind of enemy than i had at first : i order d friday also, who i had made an excellent marks - man with his gun, to load himself with arms : i took my self two fowling - pieces, and i gave him three muskets ; my figure indeed was very fierce ; i had my formidable goat - skin coat on, with the great cap i have mention d, a naked sword by my side, two pistols in my belt, and a gun upon each shoulder

    我自己拿了兩支鳥槍,給了他三支短槍。我現在的樣子,真是猙獰可怕:身上穿件羊皮襖,樣子已夠嚇人,頭上戴頂大帽子,那古怪勁兒我前面也曾提到過。腰間照常掛著一把沒有刀鞘的刀,皮帶上插了兩支手槍,雙肩上各背了一支槍。
  15. The same type of cement - soil mixing pile with concrete core, concrete pile and cement - soil pile that means they have the same pile length and pile diameter is deeply analyzed by finite element program. we get the q - s curve, the axis force of pile body curve, the stress of pile curve and the side and the end sharing load ratio of the pile curve by finite element program. with the help of the finite element program, the paper finds the relations between the pile ' s parameter and its bearing capacity and load transferring properties

    利用有限元計算分析了同比(樁長相同、樁徑相同)水泥土組合樁、水泥土攪拌樁和混凝土鉆孔灌注樁,得到了它們的荷載沉降曲線、樁身應力曲線、樁身軸力曲線、樁側樁端分擔荷載曲線等,通過這些曲線對它們的荷載傳遞規律以及變形特性進行了深入的分析。
  16. It is 260m long and 20m wide ( including 14m of traffic lanes and 3m of pavement of each side ) with a designed load of grade 20 of automobile and grade 100 of trailer

    橋梁全長260米,寬20米,其中行車道14米,兩邊人行道各3米,設計荷載為汽車- 20級,掛車- 100級。
  17. Wheels side load fatigue test methods for tractors, agricultural and forestry machines

    拖拉機和農林機械車輪側向負載疲勞試驗方法
  18. Fibre optic interconnecting devices and passive components - basic test and measurement procedures - tests - static side load for connectors

    纖維光學互連器件和無源元件.基本試驗和測量程序.試驗.連接器靜態側向負荷
  19. Fibre optic interconnecting devices and passive components - basic test and measurement procedures - part 2 - 42 : tests - static side load for connectors

    光纖互聯裝置和無源部件.基本試驗和測量步驟.第2 - 42部分:連接件靜態邊負載
  20. Fibre optic interconnecting devices and passive components - basic test and measurement procedures - part 2 - 42 : tests - static side load for connectors iec 61300 - 2 - 42 : 2005 ; german version en 61300 - 2 - 42 : 2005

    光纖互連設備和無源元件.基本試驗和測量程序.第2 - 42部
分享友人