side rail 中文意思是什麼

side rail 解釋
護側軌
  • side : n 1 (左右上下等的)邊,側面;(事物內外等的)面,方面;(人、物等的)旁,旁邊。2 〈數〉(三角形...
  • rail : n 1 (圍欄等的)橫木,橫檔;(釘帽架等用的)橫條,欄桿,扶手;〈pl 〉圍欄。2 軌道;鋼軌;鐵路;〈...
  1. On the road tom he told me all about how it was reckoned i was murdered, and how pap disappeared pretty soon, and didn t come back no more, and what a stir there was when jim run away ; and i told tom all about our royal nonesuch rapscallions, and as much of the raft voyage as i had time to ; and as we struck into the town and up through the - here comes a raging rush of people with torches, and an awful whooping and yelling, and banging tin pans and blowing horns ; and we jumped to one side to let them go by ; and as they went by i see they had the king and the duke astraddle of a rail - that is, i knowed it was the king and the duke, though they was all over tar and feathers, and didn t look like nothing in the world that was human - just looked like a couple of monstrous big soldier - plumes

    我們到了鎮上,直奔鎮子的中心那時是八點半鐘只見有一大群人象潮水般涌來,手執火把,一路吼啊,叫啊,使勁地敲起白鐵鍋,吹起號角。我們跳到了一旁,讓大夥兒過去。隊伍走過時,只見國王和公爵給騎在一根單杠上其實,那只是我認為是國王和公爵,因為他們遍身給塗了漆,粘滿了羽毛,簡直已經不成人形乍一看,簡直象兩根軍人戴的猙獰可怕的粗翎子。
  2. On the far side of the rail line was a maze of small, mean streets.

    鐵路對面是一條條縱橫交錯的小街陋巷。
  3. What you ' ve done is to be perseverant without any hesitation, or lay whose soul on the opsite side of restriction, face to face from far way, wallow in each other ' s grief, or else have your soft spot in the deepest, and rail the love into somewhere to be fired all by a great fire

    是義無反顧地執著,還是把誰的心擺在矜持的對岸,兩兩相看,悱惻纏綿;又或是把你的留戀深藏在心裏,讓時間放一把大火,把記憶圈到某個角落裡燒掉。
  4. Recently, with the development of railage, passenger transport, freight and the density of train have increased mostly. it results in rail - wear day after day, especially the side rail - wear. so the ministry of railway has been taking the situation of rail into account greatly to insure train and rail safely

    近年來隨著鐵路重載運輸的大力發展,客貨運量和行車密度大幅度增長,從而導致鋼軌磨耗日益嚴重,尤其是曲線鋼軌的側面磨耗急劇上升,因此鐵路工務部門十分重視對鋼軌傷損情況的檢測,以確保行車的平穩性和安全性。
  5. Cross rail side gear box

    橫導軌側面齒輪箱
  6. This thesis also studied the influence of the spacing, which is between the central action point on the shackle and the exterior plate of the chassis frame side rail, because the spacing influenced the local stress distribution and the stress concentration of the bus body frame and the chassis frame, and the related variational tendency was summarized

    本文還研究了吊耳銷作用力中心點與縱梁腹板間距對車架和客車骨架的應力分佈與集中的影響,總結了相關的變化趨勢。
  7. Using vogel ' s wear index as the rail side wear index, the paper analyzes the side wear variations of rail head when the parameters in the wheel / rail system vary, analyzes the influences of track irregularity on rail uneven wear on gauge corner emphatically. this paper analyzes the rail side wear dates measured by track division of shan hai guan since 1990, then gains the relationship between side wear and traffic volume and sums up the characteristics and regularities in the formation and development of side wear. in the end, some measures for regarding the side wear on curves are put forward

    從輪軌摩擦、輪軌接觸幾何關系、輪軌接觸應力和輪軌蠕滑等方面對鋼軌側面磨耗機理進行了探討,從軌道幾何參數、機車車輛運營條件等方面對鋼軌側面磨耗的影響因素進行了重點分析和總結;應用輪軌系統動力學,建立了輪軌空間耦合振動時變模型,採用vogel側磨指數作為鋼軌側磨指標,系統分析了輪軌參數變化的情況下,軌頭側面磨耗的變化規律,重點分析了軌道不平順對鋼軌不均勻側磨的影響;對山海關工務段1990年以後現場測得的曲線鋼軌側磨數據進行了分析,通過擬合得到了鋼軌側磨量與運量的關系曲線,並總結了曲線上股鋼軌側面磨耗的特徵和發生、發展規律;最後提出了一些減緩曲線鋼軌側面磨耗的措施。
  8. Side skirt rail

    側圍裙邊梁
  9. Side wall sheilf rail

    側圍擱梁
  10. Rail vehicles ; self - discharging wagon with side - wall flaps ; square for locking shaft

    鐵路車輛.帶側壁活門的自卸車.鎖環軸的方頭
  11. Under the railway development strategy 2000, there are proposals for the freight rail system on hong kong side ( termed as the port rail line ( prl ) )

    根據鐵路發展策略2000 ,香港的貨運鐵路系統(稱為港口鐵路線)有兩個方案可供選擇。
  12. Since several years, with the speed rising and 5000t heavy haul train running, the problem of rail side wear on curves stand out increasingly

    近年來,隨著列車提速和5000t重載列車的開行,鋼軌側面磨耗的問題更顯突出。
  13. Side wear of rail on curves is a normal phenomenon in railway engineering. a great quantity of rail wear results in decreasing rail life in use and increasing railway transportation costs

    鋼軌側面磨耗是工務工程中普遍存在的問題,大量的鋼軌磨耗縮短了鋼軌的使用壽命,增加了鐵路運營成本。
  14. Left side and right side are movable material discharge connections, equipped with one set of roller guide rail respectively four pieces on side

    左右側為活動式出料口,配滾輪導軌各一套側四塊。
  15. The kcr provides commuter train service in the new territories to the boundary with mainland china, and long - distance rail into mainland china. the kcr east rail runs between east tsim sha tsui and lowu. the kcr west rail links kowloon to the western side of the new territories

    九廣鐵路服務包括城際直通車,提供往返香港與北京上海及廣州的長途鐵路客運服務東鐵則連接尖東至羅湖邊界馬鞍山鐵路行走新界東北部西鐵行走九市區至新界西之間而輕鐵則提供地區鐵路服務,往來新界區屯門及元朗。
  16. The thesis summarizes the characters of three generation - side electricity markets that have been put into function in our country : single - buyer model, part power go to network through competitions, double rail competitive price system, attempters and trade synthesize together and so on

    論文總結了國內已投入試運行的3個發電側電力市場的運行特點:單一購買模式、部分電量競價上網、雙軌制競價體系、調度與市場交易一體化等。
  17. Testing the vibration acceleration signal of rail top ( lateral and vertical ), rail middle ( lateral ), rail bed side ( vertical ) and rail bed middle ( vertical ) with dasp vibration testing system, calculation of signals obtains the power spectral density and frequency response curves of different position

    測試橫向和垂向激振力下鋼軌不同部位的振動信號,進行頻譜分析,得出不同部位的頻率響應曲線。通過對頻響曲線的分析,得出不同方向激振力下鋼軌振動能量集中的頻率,確定不同方向激振力下鋼軌的主要振動部位和振動形式。
  18. Aiming at the coal under the building, rail and water, difficultly - mined coal and the side of strip mine, hardly mined, but it is utilization for the ucg study on field test of air coal gas, water coal gas, rich oxygen coal on the side of strip the side of strip mine mine of fu xin, using the ucg for the mineral well, getting the method for building stove of ucg, obtain different coal gas group and heat value for the different gasification craft high volatile, multiple thin coal seams on the side of strip mine are suitable to underground coal gasification to produce middle low heat value gas

    摘要針對「三下」煤層,難採煤層,復雜煤層以及露天邊坡剩餘的煤炭資源,並工開采不經濟或難以開采,可利用煤炭地下氣化將這些殘余資源得以回收利用,試驗利用礦井式煤炭地下氣化方式,對阜新礦露天邊坡進行了空氣煤氣、水煤氣、富氧煤氣的工業性試驗研究,通過煤炭地下氣化工業性試驗,得出在露天邊坡礦井式氣化建爐方式,不同氣化工藝的煤氣組分,熱值。
  19. Due to the road width shortfall on section 4 of wufu road and west river road, this section is planned as a single track 3. 14 kilometers long. this lrt line is planned to be mainly of the at - grade type, except for the area at the intersection of section 3 of chushan road and section 4 of kishon road, as well as on the north side of genko bridge over the love river, where underground sections are planned. there will be 23 stations on the double - rail sections and 9 stations on the single rail sections

    並提出其輕軌系統優先發展路網,建議路線全長約9 . 6公里,設置9個車站,總成本以88年幣值估算,約需新臺幣86億,包括2 . 2公里高架,佔全長之23 , 2個高架站; 0 . 7公里地下,佔全長之7 , 1個地下車站;其餘6 . 7公里為平面型式,佔全長之70 , 6個地面車站。
  20. Analysis on the cause of abnormal side - rail fractures on farm vehicles

    農用運輸車車架縱梁異常開裂原因的分析
分享友人