silting 中文意思是什麼

silting 解釋
沉積淤泥
  1. Analysis on the silting mechanisms of the terminal drainpipes of sibao sewage treatment plant

    四堡污水處理廠江心排放管的淤積機制分析
  2. Then river width increased and the intensity of deep point lowing and bed material coarsening decreased and water level lowed continuously. so the bed form changed toward to u type. the bed regulation is realized through sediment silting in different parts in cross section during silting period and the deformation of bed form changed from broad u type channel to narrow and deep v type channel

    研究表明,河道在持續沖刷前期深泓點及水位下降與河床粗化同步發展,河床向v型發展;沖刷後期深泓點下降、河床粗化減弱,河道展寬增大,水位繼續下降,河床向u型發展;在以淤積為主時期的調整,是通過斷面不同部位的淤積來實現的,但都是由u型較大河槽向v型窄深小槽發展。
  3. Based on analysing all kinds of sediment silting basins and their suitable conditions, the traditional sedimentation basin has been improved in three aspects, i. e., setting an adjusting flow board in the fore of setting basin, adding a spillway trough along the flow direction, and redesigning the flush gallery by adding auxiliary flushing facilities

    摘要在對各種類型沉沙池及適用條件進行分析的基礎上,通過在沉沙池的首部加調流板、在溢流堰上沿水流方向設溢流槽、對沖沙廊道進行改進並設置輔助沖沙設施這3個方面對傳統沉沙池進行了改進。
  4. In recent years it is more severe because of temperature changes, mankind activities, scouring and silting. the special geographical position, hydrometeorological condition, river course characteristics are main reasons for ice flood

    由於近幾年來氣溫的變化、人類活動、河床沖淤等流域環境的變化,使得凌汛的威脅不僅依然存在,而且發生冰害的河段有所增多,影響范圍隨之擴大。
  5. Picture of the type of amphibious dredger that will be used for de - silting the water channel

    圖為疏浚17號基圍水道所使用的水陸兩用挖土機類型。
  6. Analysis on silting up in center river discharging system of sibao sewage treatment plant in hangzhou

    杭州市四堡污水處理廠江心排放系統淤積現象分析
  7. The characteristic of bed regulating is that the width and area of main channel and medium flowing channel increased greatly during the sustained silting period and decreased during scouring period

    河道調整特點為持續沖刷時期主槽、中水河槽的河寬、面積都明顯增大,持續淤積時期則減小。
  8. Based on the topographic features and data of sediment particle size of bed load at the fluctuating backwater reach of liujiaxia reservoir, the streamwise variation and variation process of median diameter of bed load during silting and scouring periods of the fluctuating backwater reach are analyzed, and it can be seen that the turning point for the sediment diameter variation from coarse to fine is located at the outlet of shigou gorge of the fluctuating backwater reach

    摘要根據劉家峽水庫變動回水區的河段地形特徵和歷年河床質泥沙粒徑級配資料,分析了變動回水區河段淤積和沖刷時,河床質泥沙中值粒徑的沿程變化和歷年河床質泥沙中值粒徑變化過程,並指出粒徑分佈由粗變細的轉折點在變動回水區寺溝峽峽口處。
  9. First, erosion resulting from exce ive deforestation in the u er reaches of the river and, second, heavy silting which raised the riverbed in the main cha el

    第一,過度砍伐引起的河流上游的侵蝕,第二,嚴重的泥沙淤積抬高了主幹道的河床。
  10. First, erosion resulting from excessive deforestation in the upper reaches of the river and, second, heavy silting which raised the riverbed in the main channel

    第一,過度砍伐引起的河流上游的侵蝕,第二,嚴重的泥沙淤積抬高了主幹道的河床。
  11. The result showed that the numerical model could satisfactorily reflect the sediment concentration field, and calculate the back silting intensity on the approach channel in lianyungang harbor

    研究結果表明,所介紹的研究方法可以合理地描述含沙量場特性以及計算進港航道回淤量。
  12. On the basis of sediment concentration field, the annual back silting intensity on the approach channel of 70000 dwt at lianyungang harbor was also simulated, and the calculated results was coincident with actual data

    鑒于進港航道回淤量是當地海域潮流、波浪、泥沙長期共同作用的結果,建議採用年平均含沙量場進行回淤計算,並在此基礎上模擬了連雲港7萬噸級進港航道的年回淤強度,計算結果與實測資料吻合較好。
  13. Based on the back silting analyses of the sandbar - dotted waterway in the oujiang river estuary after three times dredging, reasons for back silting in the waterway are presented considering influences of flow dynamics, waves and salinity distribution on sediment concentration

    摘要通過對甌江口攔門沙航道3次疏浚后的回淤分析,以及從甌江口的水流動力條件、風浪、鹽度分佈對含沙量影響等的初步分析,得出了攔門沙航道回淤的原因。
  14. Silting - $ 9. 0 per cubic metre or $ 1, 800 per dau chung paid according to actual damage up to a maximum of $ 5, 400

    淤泥堆積-按實際受損情況發給補助,每立方米9 . 0元或每斗種1 , 800元,最高可達5 , 400元。
  15. Thirdly, several problems are discussed, such as the calculation of the silting velocity of sediment, the sediment transport capacity, the coefficient of sediment resume saturation, etc. on the basis of these discussions, the mathematical model is improved

    其次對泥沙沉速計算、水流挾沙力和恢復飽和系數的取值等問題進行了探討,在此基礎上對現有的泥沙數模學型進行了改進和完善。
  16. Abstract : based on references and works of authors, this paper presents the developments, key techniques of immersed tunnel tube in abroad and home recently years, and an alyses its advantages and shortcomings. finally, it gives an intro duction of so me model experiments ( including transportation, immersing, silting and ventilating ) for immersed tube

    文摘:對沉管隧道的國內外發展情況、沉管隧道的防水、地基處理、浮運沉放等技術作了概述,文中還將沉管隧道與橋梁、沉埋法與盾構法進行了相應比較,指出了沉管隧道的優點及有關顧慮,最後就有關沉管隧道的模型試驗作了相應介紹
  17. The results indicated that with the change of water and sand condition and the altitude of tongguan and the development of the industry and agriculture in recent decades, the water environment of wei river had changed largely, which were shown as follow : annual runoff and seasonal flood decreased sharply ; water stream of large discharge decreased and the range of runoff decreased greatly ; sediment load per year decreased generally, sediment concentration of water increased, and the sand silting up was serious ; water channel swung and shrank, and water regime deteriorated ; frequencies of big floods decreased obviously, and hyper concentrated flood increased obviously ; water levels of the same runoff rose universally, and the frequencies of the floods increased and aggravated ; water pollution was very serious

    結果表明,近期隨著水沙條件、潼關高程等的變化及工農業的發展,渭河的水環境發生了巨大變化,表現在年水量及汛期水量銳減;大流量級水流出現次數減少,水量減少幅度大;年輸沙量總體減少,河水含沙量增大,泥沙淤積嚴重;河道向擺動型發展,河道萎縮,河勢惡化;大洪水發生的次數顯著減少,高含沙小洪水明顯增多;同流量洪水位普遍抬高,洪災發生次數增加,洪災加重;水質污染極為嚴重。
  18. The silting mechanism downstream of sluices and limits of the 2 - d suspended sediment model to simulate the silting downstream of sluices in a tidal reach are analyzed

    摘要分析了感潮河段閘下淤積機理及用平面二維懸沙數學模型模擬閘下淤積存在的缺陷。
  19. The scour and silting situation of the reversed equalizing pond of shimen hydropower station and the capacity of regulating volume after the flexible dam restored are expounded, the operation mode for shimen reservoir is put forward

    根據實測結果,闡明了石門電站反調節池沖淤形態和橡膠壩恢復后的水量調節能力,提出了石門電站運行調度的基本模式。
  20. Two major factors contributed to devastating summer flooding along the yangtze river and its tributaries. first, erosion resulting from excessive deforestation in the upper reaches of the river and, second, heavy silting which raised the riverbed in the main channel

    兩個主要因素導致了夏季長江及其支流的特大洪水。第一,過度砍伐引起的河流上游的侵蝕,第二,嚴重的泥沙淤積抬高了主幹道的河床。
分享友人