slope course 中文意思是什麼

slope course 解釋
斜坡道路
  • slope : n 1 傾斜,坡度;坡,斜坡,斜面;【印刷】斜體。2 【軍事】掮槍的姿勢。3 【數學】斜率。4 【礦物】斜...
  • course : n 1 進程,經過,過程,趨勢;經過期間。2 進路;水路;路程;路線;航線;【火箭】導引。3 行進方向;...
  1. This continental slope usually starts at a place somewhere near the 100 - fatheom mark and in the course of a few hundred miles reaches the true ocean floor at 2, 500 - 3, 500 fathoms

    大陸架慢坡一般是從差不多100英尋水深的地方開始的,一直延伸到幾百英里遠深達2 , 500至3 , 500的地方,那裡才是真正的海底。
  2. The results indicated that the ree tracer technology has high precision to quantify the spatial - temporal process of soil erosion ; in earlier rainfall course, the development degree of sheet and nil erosion was general equation ; otherwise in the following course, the rill erosion was dominant in the total erosion, its average erosion acceleration and the average erosion rate was 15 and 9 times of sheet erosion, respectively ; in the end of experiment, the rill erosion took up 90 % of total erosion amount ; the section of slope bottom occupying about 1 / 3 slope area was active erosion segment in this experiment

    結果表明: ree示蹤技術對定量研究土壤侵蝕具有較高的精度;降雨前期,片蝕與細溝侵蝕發育程度基本相當;後期細溝侵蝕占據坡面侵蝕的主導地位,其侵蝕平均加速度和平均侵蝕率分別是片蝕的15倍、 9倍;試驗結束,細溝侵蝕占據坡面總侵蝕的90 % ;本試驗條件下,坡面下1 / 3區域為侵蝕活躍帶。
  3. Combining with the research task researching on the deformation and stability of deep excavated cuts and high filled embankment of the traffic department in fujian province, based on the residual soil slope project on the project site at k15 + 183 of yong - zhang highway ( yong ' an section ), adopting non - linear theory, modern monitoring technology and numerical simulation technology, the deformation and stability of cutting cliff debris and residual soil slopes have been studied systemically and synthetically in the thesis. at the same time theory analysis, the analysis and estimate of field monitoring are taken into account in this course. main research work and working achievement are summed up as follows : ( 1 ) with the acquaintance of the trends and development about the deformation and stability of slopes at home and abroad, slopes are classified and summarized systemically

    並通過k15 + 183工點路塹土質邊坡的各類位移變形的監測成果驗證了該程序的正確性及適用性; ( 5 )通過應用大型有限元軟體ansys模擬分析,不僅分析了其隨著開挖時間步的應力應變關系,並模擬了與實際測斜管相匹配的測斜路徑,通過對各開挖時間步的模擬計算分析,得到了與實測數據較符合的結果; ( 6 )綜合監測分析成果和極限平衡理論計算分析成果,對k15 + 183工點路塹邊坡的原設計坡率和幾何形態進行了優化計算分析,取得了較為滿意的結果。
  4. And combining with compound analysis, this thesis has calculated and estimated the deformation and stability of slopes of the cliff debris and residual soil slope project on the project site at k15 + 183 of yong ' an section of yong - zhang highway ; ( 3 ) in the course of the cut slope excavation inner displacement has been in control of real time field monitoring

    同時邊坡開挖後期坡頂會出現回彈現象。 3 、數值計算成果表明,隨著開挖階數的增加,大小主應力在邊坡內也進行不斷的調整。邊坡開挖后坡腳處大小主應力值nlfep程序結果與ansys計算結果較為相似,兩者吻合性較好。
  5. According to the special surface structure and actualities that the city is extending along the transportation line and river region because of the restriction caused by the mountains in the two sides of every cities in qingyang. the author thinks it is not good to squeeze out the existence of cave dwellings during the course of urban construction, and it is necessary to emphasize the symbiosis between urban and cave dwellings. the author conceives that it is feasible to develop group - dwellings in the steep - sides of mountain and especially to adapt to constructing " climb - slope cave dwellings which are covered with earth "

    根據慶陽特殊的地表結構和城鎮發展受兩側山體限制而沿交通線與川區無限蔓延的現狀,筆者認為在慶陽城鎮建設中不應完全排擠窯居的存在,而是要強調城鎮與窯居的共生,並設想充分利用兩側陡坡地帶發展居住組團模式,建設新型「爬坡式覆土窯洞」建築群落,這種「城鎮型窯洞」可作為城鎮建設空間橫向的延續和拓展,防止城鎮呈線狀無限蔓延的畸形發展態勢;提倡運用現代科學技術對傳統窯洞民居進行改造與創新,要加快新式窯居的試點建設;建議積極開發慶陽窯洞旅遊資源,並提出了「窯洞地產」和「綠色窯洞產業」的全新概念。
  6. The major activities involved during the construction stage of the project are cut and fill earthworks, slope works, earth retaining walls, irrigation buffer lake, detention ponds and tanks, sand bunkers and golf course capping and turfing

    2 . 3 . 1在工程項目的施工期內,主要的工程活動包括挖填土方工程斜坡工程護土墻灌溉緩沖湖靜水塘缸沙坑及高爾夫球場的加蓋草皮鋪設。
  7. It is proved that the stability of rock mass high slope is mostly affected by lots of discontinuous structural faces like joints and faults, etc. it makes the rock mass be different from intact rocks completely in mechanical properties. so it is necessary for us to do some research on the deformation failure mechanism, and accordingly, we should do some research on the evolvement course and evaluation methods of stability about rock mass high slope

    工程實踐證明,節理巖體高邊坡的穩定性取決于邊坡中的不連續結構面,如節理、裂隙、軟弱面和不同巖層的分界面,這類結構面的存在使巖體變形破壞的特性與完整巖石截然不同,因此,有必要加強對節理巖體高邊坡變形破壞機制的研究及相應的節理巖體高邊坡穩定性評價方法的研究。
  8. John farra carries his 110 - pound wife, tess, over a 278 - yard obstacle course to win the north american wife carrying championship, saturday, oct. 7, 2006, at the sunday river ski resort, in newry, maine. john farra, a former winter olympian from caribou who trained by running up a ski slope with 80 pounds of mortar mix, won the seventh annual north american wife carrying championship on saturday at sunday river

    第七屆北美年度背老婆錦標賽于上周六在星期日河地區舉行,來自加里本美國緬因州北部的前冬奧會冠軍約翰法拉獲得比賽冠軍,他賽前的訓練是背80磅重的混凝土包跑上一個滑雪坡。
  9. During the course of design and construction of highway, for the purpose of length, turning radius and longitudinal gradient, we have to construct a lot of high slope engineerings. so the slip of roadbed ' s slope often happen

    在公路的設計、建設過程中,為滿足直線長度、轉彎半徑及縱坡的坡度等要求,不得不劈山填谷,從而形成大量的高邊坡工程。
  10. 2. for a given rain, the initial condition and boundary condition is determined, then the distribution of water in the slope at difference moments is got from the result by the fdm program calculation, and variation law of water distribution during the whole course is also obtained. 3

    模擬一次降雨過程,通過確定初始條件和邊界條件,用本文編制的有限差分法程序計算了降雨及雨後共128小時內不同時刻土坡的水分分佈場,得到了坡體內水分分佈隨時間變化的規律。
  11. This paper expounds the relation of side slope ' s stability with all explosion methods, discusses the development and basic principle of presplit blasting energy - focusing cutting, and introduces the course of development and research on precracking explosion by energy - focusing cutting and its application in dayaowan phase project

    摘要綜述邊坡穩定性與各種爆破方法之間的關系,探討聚能切割預裂爆破的發展與基本原理,並對聚能切割預裂爆破的研製過程及其在大窯灣二期工程中的應用作簡單介紹。
  12. This thesis, according to limestone environmental characteristic and characteristic of construction of highway of mountain area of limestone, sets out in excavating from the road bed of the angle of environmental protection, according to trying not to excavate, how to reduce to excavate, how to reduce and excavate the impact on surrounding environment of the course, how to go on the expressway view and ecological environment and how to carry on environmental quality resume, we employ theories such as engineering of traffic, rock soil engineering, traffic psychology, traffic aesthetics, operations research, etc. we have excavated environmental protection theory and method and carried on research to the mountain area expressway road bed of limestone systematically, propose the road bed to excavate and optimize, slope protect, discard cubic meter of earth and stone deal with, natural river system recuperate recovery, view environmental recovery, environmental quality resume theory system of appraising etc.

    本論文依據石灰巖山區環境特徵和石灰巖山區高速公路建設特徵,從路基開挖中環境保護角度出發,按照盡量不開挖、如何減少開挖、如何減少開挖過程對周圍環境的影響以及如何對高速公路景觀和生態環境進行恢復、如何對建設項目進行環境質量評價等思路,應用交通工程學、巖土工程學、交通心理學、交通美學、運籌學等理論與方法,系統地對石灰巖山區高速公路路基開挖環境保護理論與方法進行了研究,構建了包括路基開挖優化、邊坡防護、土石方處理、自然水系調治恢復、景觀環境恢復、環境質量評價等理論或方法的石灰巖山區高速公路環境保護理論框架,為促進石灰巖山區高速公路的可持續發展提供了基本思路。
  13. In general, for the stability of side slope, we should specify a safety factor. because the work state on limiting equilibrium theory of rigid body is assumed, it ca n ' t be used to analyze the course of the rock breakage

    評價邊坡的穩定性,一般來說要給出一個安全系數,建立在剛體極限平衡基礎上的各種方法由於其工作狀態是虛擬的,因此無法分析邊坡破壞的過程。
  14. On the basis of stability analysis, the author takes the k27 + 825 slope from the type of slope which has lest stability as an example. according to its basic feature, the design ueses the choosed best reinforce and control scheme : lattice beam, anchor wire, grouting and abstraction of water. in the course of design, the author takes into account not only reasonable optimize of whole control plan but also local measure such as whether the unstable block will shear from vnlnerable sections when control plan is laid out concretely, in order to reach the goal of reasonable design and effective control

    在穩定性分析的基礎上,以邊坡穩定性最差的一類中的k27 + 825邊坡為例,結合其自身的特點,用優選出的加固防治方案:框架梁+錨索斗灌漿+排水進行設計,設計中既考慮總體防治方案的合理優化,又充分考慮了加固工程的具體布置時是否存在不穩定體從錨索或框架梁的薄弱部位剪出的可能性等一些細部措施,以達到合理設計,有效及經濟治理的目的。
  15. The optimal course is automatically implemented with matlab. the cusp catastrophe model is established by means of the upper bound theorem of plastic limit theory. the characteristic formula of the failure of slope is also deduced

    根據分析邊坡穩定性的塑性極限方法的上限理論建立了邊坡失穩尖點突變模型,並得出邊坡突發式滑坡的特徵關系式,用突變理論對非飽和土邊坡穩定進行了初步研究。
  16. That did not use double slope integral amplifier to realize equivalent sampling. in the course of testing the use of two methods designed to achieve equivalent sampling, the final selection of one of the best ways to be able to meet the demand of users results and performance indicators

    該方案的優點是運用了大規模可編程邏輯器件fpga來實現隨機等效采樣而不是採用典型的基於雙斜率電容充放電的電路來實現的。在設計過程中試驗用兩種方法來實現等效采樣,最後選用了一種最好的方法,得到的結果能夠滿足用戶的要求和性能指標
分享友人