slope wall 中文意思是什麼

slope wall 解釋
護坡墻
  • slope : n 1 傾斜,坡度;坡,斜坡,斜面;【印刷】斜體。2 【軍事】掮槍的姿勢。3 【數學】斜率。4 【礦物】斜...
  • wall : n 1 墻壁;(石、磚等的)圍墻;城墻。2 (形狀、用途)像墻壁的東西,障壁;土堤,堤防。3 (礦井、容...
  1. The wall is beginning to slope backwards.

    這堵墻往後坐了。
  2. We begin climb the great wall, we go the top < bawcock slope >, i ‘ m very happy, because i ' m a real bawcock

    我們開始攀登長城,我們到了最頂峰「好漢坡」 ,我非常高興,因為我是一名真正的好漢。
  3. The report takes account into the influence of foreshore and shallow foreshore, roughness, slope, berm, wave attack angle, vertical wall and so on

    報告給出了復雜斷面上波浪爬高和越浪量的計算公式,計算中考慮了前灘、邊坡糙率、邊坡坡度、平臺、波浪入射角以及豎墻等因素的影響。
  4. The comprehensive treatment project of lin jia ya slide el consists of whittling slope, anti - slide pile with anchoring cable, retaining wall, building ground drainages, level ing off and calking slope, vegetation protection etc. after managing, under the action of earthquake load and watery the stability coefficient of slide is up to 1

    林家崖號滑坡的綜合治理方案是由削方、錨索抗滑樁、護坡擋墻、地表排水、整坡填縫、生物防護等多種工程措施優化組合而成。治理后,在飽水有地震荷載狀態下滑坡的安全儲備系數為1 . 10 。
  5. It is suggested that the impervious wall combined with curtain grouting should be taken as the main vertical impervious body for seepage control, and that the full use of slope wash and fully weathered zone as horizontal impervious blanket should be taken to reduce work load for seepage control

    建議採取截滲墻結合帷幕灌漿作垂直防滲體為主的防滲措施,同時充分利用坡積土和全風化帶作為水平防滲鋪蓋以減少防滲處理工作量。
  6. Re - alignment of existing carriageways and construction of new at - grade carriageways for the road junction ; and associated drainage, retaining wall and slope works

    為有關路口的現有行車道重新定線,並興建新的地面行車道及進行相關的渠務斜坡及護土墻工程。
  7. In view of the engineering practice that retaining wall in the front edge of landslide is only deformed but not destructed completely as a result of the slide of slope, this paper presents a back calculation method of landslide shear strength index considering the residual resistance of retaining wall occurring topple, translation and shear deformation

    摘要針對滑坡的滑動僅使其前緣的擋墻發生位移或變形,但未使之完全破壞的工程實踐,系統提出了滑坡前緣的擋墻在發生傾覆、前移和剪切三種變形下,考慮擋墻變形后對滑坡的剩餘抗滑作用進行滑帶土抗剪強度指標反算的理論和方法。
  8. We were only a wall apart, but the slope behind our apartment complex remained wooded, while the area behind this adjacent building looked as though it had been skinned and ripped apart. we thanked god that the supporting backdrop of trees on the slope behind us had stood firmly

    而我們這一棟雖只有一墻之隔,但後山卻依然樹青草綠,與隔棟後山被剝了一層皮似的皮開肉綻比較,直是天壤之別,真要感謝樹神牢牢地抓著大地不放,我們的靠山才能依然健在。
  9. Widening of the eastbound carriageway of this section of tuen mun road to four lanes with provision of a hard - shoulder and verge, and associated retaining wall and slope works

    擴闊此段屯門公路九方向行車道至四線行車並加設路肩和路旁帶及進行有關的斜坡和擋土墻工程
  10. The cellular retaining wall with the continuous multiple cells filled by the larth cut from the landslide slope for reducing its weight not only increases the weight of the wall itself to equilibrate its horizontal slide and overturn, but also does not reduce its strength too much to attain the goal of landslide control

    將滑坡體上削方卸載下來的土填入連續型多格倉內的擋墻不但能增加其自重,以平衡它的水平滑移和傾覆;而且其強度也不致減弱太多,能達到治理滑坡的目的。
  11. The principal conclusions include : ( a ) the composite system is composed of both active - bearing structural members and inactive - bearing ones, being of a character of combination of rigid retaining structures with flexible ones, so its working mechanism will be behaved as sharing loadings, waterproof and impermeability, loading transfer, local reinforcement and pre - reinforcement ; ( b ) the experimental results show that much more subsoil will participate in retaining action, soil stresses of internal slope will be shared uniformly and deflections caused by excavation will be reduced notably because of cooperation of nails and cement - soil mixing pile wall ; and ( c ) the internal forces of facing in vertical model will be a control factor of design and the cross section tensile strength of cement - soil wall will govern strength of the

    主要研究結論有: ( 1 )復合土釘支護的作用機理主要為臨時加固土體以保證局部穩定、有機聯系以共同承擔荷載、改善土體性質起到止水抗滲作用。 ( 2 )試驗結果表明:復合土釘支護能夠充分調動周圍土體共同作用,有效地控制基坑變形;復合土釘支護中止水帷幕的插入深度和強度對控制邊坡變形與失穩有較大作用;復合土釘支護效果明顯優於一般的土釘支護。 ( 3 )面層與邊坡土體共同變形,設計時可按外力作用下的彈性地基梁進行計算。
  12. The retaining wall reclining on the slight slope built on soft foundation is usually used in protecting the shore of river, the contradiction between the lack of impartiality in stress of the base and the small stress allowed by the foundation as well as the lack of stabilization of the breast wall is a hard nut to crack in the engineering. in the paper, a tenon - base is added under the base of the retaining wall, on the study of the choice of the parameters and formulas used in calculation and the research of theory used in calculation, method used to deal with the load, etc, the writer gives a way to crack the nut mentioned above paragraphs and presents a qualitative and quantitative analysis about them, such as the equivalent inner friction - angle ( d ) and the passive press of the clay ( ep ), etc. in the end of the paper, using modern optimization method, a design of the retaining wall reclining on the slight slope built on soft foundation is done, the result is economical, and accords with the fact

    軟基上的仰斜式擋土墻在水利工程河道護岸中經常遇到,仰斜式擋土墻基底偏心應力較大和軟基土地基容許承載力偏小的矛盾以及擋土墻抗滑穩定不足是工程中難以解決的難題。本文在對仰斜式擋土墻設計中有關計算參數的選擇、公式的選用應該注意的問題進行了研究,對河道護岸軟基礎上的仰斜式擋土墻採用凸榫基礎處理的方法,就其計算理論、設計驗算中各荷載的具體處理方法進行了較為細致的研究,提出了解決軟基礎上的水工仰斜式擋土墻難以解決的難題的方法,並對有水情況下粘土等效內摩擦角_ d 、凸榫被動土壓力e _ p等在計算中的取值提出了定性和定量的分析。最後利用現代優化方法對軟基礎上的水工仰斜式擋土墻進行了結構優化設計,得出了符合實際的結果,與其它重力式擋土墻形式進行比較,取得了明顯的經濟效益。
  13. The study results reveal some laws : ( 1 ) two failure modes exist in different obliquity slope and influence the internal force of soil nailing ; ( 2 ) the connection between face shield and soil nailing determines the distribution of the axial force along length ; ( 3 ) the influence of face shield involves its connection with soil nailing and its stiffness on soil nailing wall ; ( 4 ) the transversal effect of soil nailing depended on the joint of nail head is little ; ( 5 ) the maximum axial forces of other soil nailings except the first soil nailing increase gradually with excavation

    研究表明: ( 1 )素土坡隨著坡角的變化,存在兩種破壞方式,破壞方式不同,土釘受力狀態不同; ( 2 )土釘和面層的連接方式決定著土釘長度方向上的軸力分佈形態; ( 3 )面層主要通過面層與土釘的連接和面層的本身剛度兩個方面對土釘內力和墻體變形產生影響; ( 4 )土釘橫向抗剪抗彎作用的發揮程度和土釘釘頭的連接方式有關,但作用不大,實際設計時可以忽略其影響; ( 5 )隨著坡體的開挖,第一排土釘的最大軸力變化不大,其它土釘的軸力都穩步增加。
  14. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土斜心墻和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  15. In this thesis, analysis of whole performance and interior mechanism of plain soil slope and soil nailing wall with flag finite difference program has been carried out. at the same time, the impacts on the internal force distribution of soil nailing and the deformation of soil nailing wall of many factors, including the connection between face shield and soil nailing, the friction decline between soil nailing and soil, the shear force & bending moment resistance of soil nailing, the cement crack in soil nailing, face shield, excavation, the obliquity of slope, and so on are studied in this thesis

    本文通過flac有限差分程序,分析了素土基坑和土釘墻體的整體性能和內在機理,研究了土釘和面層的連接變化、土釘表面性能的下降、土釘的橫向抗剪抗彎作用、土釘漿體的開裂、面層的有無、基坑的開挖過程、基坑放坡角度等因素對土釘內力分佈和土釘墻變形的影響。
  16. The works mainly comprise the construction of an access road of approximately 320m long at lung mei, tai po and an access road of approximately 980m long at tsiu keng, sheung shui, and associated drainage, slope, retaining wall and earthworks

    工程主要包括在大埔尾興建一條約320米長的通路及在上水蕉徑興建一條約980米長的通路,以及相關的排水,斜坡,護土墻和土方工程。
  17. Introduces some anti - seepage high embankment dams in the world with bitumen concrete inclined core wall, and analyzes, taking the existing maopingxi embankment dam as an example, the effect of slope thereof on the stress and deformation of the wall by non - linear adhesive elastic finite element calculation changing the type and thickness of the core wall

    摘要介紹世界上幾座瀝青混凝土斜心墻防滲高土石壩,並結合國內已建的茅坪溪瀝青混凝土心墻壩,通過改變其心墻形式和厚度,並用非線性粘彈性有限元對其進行計算分析,探討了斜心墻的傾斜斜率對心墻的應力與變形的影響。
  18. Discussion on the application of 3. 5 m single hydraulic prop mining all height at one times in slope long wall mining

    單體液壓支柱一次采全高在傾斜長壁開采中的應用
  19. Designing retailing wall for high slope taking advantage of the bedrock

    充分利用基巖設計高邊坡擋土墻
  20. Construction of retaining wall at slope f16

    于斜坡f16建造護土墻
分享友人