software cost engineering 中文意思是什麼

software cost engineering 解釋
軟體成本工程
  • software : (電腦的)軟體,軟設備;程序設備;語言設備;程度系統;設計電腦方法;計算程序;程序編排手段;方案;資料圖紙;【航空】軟體〈指乘員、載重及燃料等,不包括機械硬體設備〉。
  • cost : n 1 費用;代價,價格;成本。2 犧牲;損害,損失。3 〈pl 〉訟費。vt (cost; cost)1 值,要價(苦幹...
  • engineering : n. 1. 工程(技術),工程學。2. 開車技術。3. 土木工程,工事。4. 操縱,管理。
  1. Our mission is to provide test and measurement instrumentation, test - program software, and related electronics products and services to the china market and to apply china s vast reserve of cost - competitive engineering talent to design and manufacture electronic instrumentation and instrument driver software and manufacture an extensive range of electronics products for the international market

    我們同時提供ate自動測試系統集成咨詢環境科學咨詢儀器模塊軟體的開發服務。我們的產品與服務已經深入電子製造服務業ems oem國防航空航天電子通訊汽車冶金石油化工自動化鐵路船舶等多個領域。
  2. Following the software - engineering rule to develop the project, we divided the task into many simple and independent function units. the interface of all the units is as better as simple and independent. during the course of coding, we encapsulate some code, which can be used repeat, into some functions so we can reduce the complexity and the cost of the maintenance of our software

    在軟體的開發過程中,遵循軟體工程設計思想,按照工程的方法進行軟體設計。對軟體功能進行模塊化功能細分,盡量做到各模塊之間功能相互獨立,模塊介面盡量簡單。並且在編碼過程中,對一些可重復利用的代碼進行封裝,從而使程序結構簡潔易讀,修改靈活方便。
  3. At present, the company has 35 various professional senior and middle engineering technicians ; 6 state registered architects, registered structure engineers and cost engineers ; the company is also equipped with the following departments : electric department, civil engineering department, electricity distributing department, system department, technology department, planning and quality assuring department, market department, financial department, press and printing department etc. the company has also set up advanced lan and achieved shared sources with complete hardware and software configuration

    本公司按國家新的工程勘察工程設計資質分級標準配置相應的工程技術人員,有各類專業高中級工程技術人員35名國家注冊建築師注冊結構工程師造價工程師6名機構設置有:電氣一次室電氣二次室土建室送電室系統室配電室技經室計劃質保室市場部財務部出版曬印室。
  4. This system integrates visual basic with autocad, microsoft excel and other application software, including such six modules as determination of irrigation parameter, irrigation canal system, drainage canal system, evaluation of engineering cost and economic analysis. depending upon the requirements of irrigation district planning and through man - machine conversations, calculations in design, cross - sectional drawing of canals and printing of design results can be automatically done

    本文運用microsoftvisualbasic6 . 0 ( vb6 . 0 )開發了灌區規劃計算機設計系統,該系統集成了vb6 . 0 、 autocad 、 microsoftexcel等應用軟體,充分利用了它們各自的特點,並結合灌區規劃設計的要求,實現了通過人機對話的方式,自動計算、自動繪制斷面圖及列印等功能。
  5. Future directions on the pads domain are proposed which include research on the existed pads modeling defects to find out realistic method accommodating the pads synchronization mechanisms and compatible general software design patterns based on software engineering and research on operatable pads performance model helping modelers to predict the pads performance at a accepted cost before implementation. mrm ( multi - resolution modeling ) is becoming more important as large complex distributed simulations are carried out inside and out of military simulation community

    提出了pads以後研究的方向:結合軟體工程的方法,研究現有pads建模的上的缺陷,探尋既容納pads模擬同步機制又兼容於普通軟體設計方法的可操作的實用方法,減少pads系統設計和實現的額外開銷和復雜性;研究包含pads性能實際影響因素的解析性性能模型和工具,使得用戶在并行模擬實現之前能以相對較小的開銷較為準確地預測pads系統的性能。
  6. At the present time, there are some kinds of project management software. these software try to perfect the highway engineering project management from the drawing up of tempo planning, the controlling of the tempo and cost to the analysis of the practical tempo at the angle of economy type

    目前已有多種項目管理軟體,力圖從實用的角度分析在工程項目管理過程中,從進度計劃的編制、進度、費用控制、實際進度分析等方面完善公路工程項目管理。
  7. Because the digital map is used as the background for navigation, we can rectify the digital map by the trace of the navigation vehicle and reduce the cost price of map. this software is developed with international oop software engineering and advanced development tool - vc + + 6. 0

    本軟體包的最大特點就是做到了gis系統與gps系統間的無縫聯接,採用矢量地圖作為導航背景,可以通過車輛行駛軌跡來糾正地圖,降低了精確制圖的成本。
  8. This paper has recommended the status in quo of the sstms skill, and has widely deepened the discussion about it. this paper has put forward a sstms of a kind of high cost performance - - the airport surface traffic management system based on dgps / gis technologies, it main integrated differential gps technology, geographical information system, route plan technology, wireless communication technology, computer software engineering, etc.

    本文提出了一種高性價比的機場場面交通管理系統? ?基於dgps gis機場場面交通管理系統,它主要集成了差分gps技術、地理信息系統、路徑規劃技術、無線通信技術、計算機軟體技術等,具有機場場面監視、機場場面交通管理、對機場交通工具進行路徑規劃與滑行引導等功能。
  9. And the cost of development and maintenance are decreased distinctively, because cos is based on the software engineering technologies and cus tomer requirements are understood basically

    由於嚴格按照軟體工程的要求開發以及基本了解並實施了用戶的需求,因此大幅度地降低了開發成本以及維護成本。
  10. With the foundation of low cost expand. as well as all of resource of zhong tong bus holdeig co., ltd. using the method of automobile systems engineering, combine modern enterprise management idea and modern automobile develop and design technology, as a tool, make use of high configured computer and high edition cad software autocad2002, catia, and office & project management software microsoft office xp ( word, excel ), microsoft project2002. develop and design of lck6600 emphases, systemly, comprehensive and whole course ( maket investigation and study, overall design, modeling select design, large scale custom - tailor output design namely platform and modularization in course

    以巨大的市場需求為導向,以交通部推出的「村村通」工程為契機,以低成本擴張為基礎,以中通客車控股股份有限公司的各種軟體和硬體資源為條件,利用汽車系統工程的方法,結合現代企業管理理念和現代汽車研發技術,使用高配置計算機和最新版本的三維輔助設計軟體catia 、二維輔助設計軟體autocad2002 、辦公軟體microsoftofficexp ( word , excel ) ,項目管理軟體microsoftproject2002等為工具,有重點的,系統的,全面的,全流程的對lck6600輕型客車進行綜合開發(市場調研,總體設計,選型設計,大規模的定製產出設計即流程的平臺化和模塊化設計,市場準入成本設計) 。
  11. Based on coal quality engineering analysis, the software of optimization steam coal blending is developed. it is for the least total cost of the current plant

    基於煤質工程分析優化得到的配煤,追求的是當前條件下電廠總費用最小,是針對當前設備狀態和運行情況進行的優化。
  12. Most software engineering texts spend some amount of copy on project planning and estimating, including tools like the constructive cost model cocomo

    大多數軟體工程學課本都花費篇幅介紹項目計劃和估計,包括類似constructive cost model ( cocomo )這樣的工具。
  13. The significance of the method was that it solved the problems of the demands of software reverse engineering, the demands of software reuse, the reliability of software, the module of software, the time span and the cost of the development

    基於微軟基礎類庫mfc ( microsofffoundationclasslibrary )實現多線程通信程序。其意義在於恰當地解決了軟體逆向工程的需要、軟體復用、軟體可靠性、模塊化及開發時間、費用等方面的綜合要求。
分享友人