soil stack 中文意思是什麼

soil stack 解釋
生活污水立管
  • soil : n 1 泥土,土壤;土質。2 土地,國土。3 滋生地,溫床。4 農業生活,務農。n 1 臟東西,污物,污穢,污...
  • stack : n 1 (麥桿等的)堆,垛;乾草堆。2 積材,層積,堆積;〈英國〉一堆〈木材等的計量單位,=108立方英尺...
  1. Too much embankment of filled soil will result the destroy of road surface or instability of high - stack soil ; soil pressure at the top of culvert is the key parameter of culvert structure design, more or less of the parameter will result in economic waste or failure of structure

    堤頂沉降過大,輕者破壞路面,重者路堤失穩,涵洞頂部土壓力是涵洞結構設計的控制指標,計算過大導致經濟浪費,過小導致涵洞開裂,影響其使用壽命。
  2. Through discussion of numerical solution, the author get the effect of height of filled soil, size of culvert, width of valley, property of filled soil, construction procedure and techniques on soil stress of the culvert top ; 3. through the centrifuge test, the paper validates the reliability of numerical calculating on high - stack soil ; 4. the paper puts forward the simplified calculating method of soil stress of the culvert top on the foundation of numerical simulating and centrifuge modeling

    通過對數值解的討論,得到填土高度,涵洞截面尺寸,溝谷底部寬度,溝壁坡角,填築體性狀,施工速度,地下水對豎向位移場及涵洞頂部土壓力的影響情況; 3通過離心機的模擬試驗,驗證了數值計算對高路堤的計算結果的可靠性; 4在數值模擬和室內離心機模型試驗的基礎上,提出了高填方涵洞頂部土壓力簡化計算方法。
  3. Culvert under high - stack soil is a ubiquitous phenomena in road constructions in mountain, self - compression of high - stack soil can not be ignored, soil pressure at the top of culvert is affected by many factors, including the height of high - stack soil, section size of culvert, width of the bottom of valley, grade of valley, property of filled soil, construction procedure and techniques

    高路堤下埋設涵洞是山區公路建設的一種較為普遍的現象,高路堤自身壓縮較大,不可忽視,涵洞頂部土壓力的大小又受很多因素的影響,包括填土高度,涵洞截面尺寸,溝谷底部寬度,溝壁坡角,填築體性狀,施工工序與工藝等。
  4. Each soil stack collects effluent from the water closets, the basins, the bathtubs and the floor drains of the toilets of all the units that it serves

    每條污水管收集來自水廁洗手盆浴缸和浴室的地面排水口的污水。
  5. Exhaust fans that have been installed in bathrooms were running with the door closed and contaminated droplets could have been drawn from the soil stack into the bathroom through the dried out floor drains

    當關上浴室門,並啟動抽氣扇時,受污染的液滴可能經排污渠從乾涸的地臺排水口直接倒抽入浴室。
  6. This reflux of air could contain contaminated droplets of sewage present in the soil stack. the contaminated droplets could deposit virus on various surfaces, such as the floor mat, towels and other bathroom equipment

    這倒流的空氣可能把存於污水管內帶病毒的水滴散發至浴室內的不同表面,包括地席、毛巾及其它浴室設備。
  7. The application of preloading method of vacuum - stack in the construction of soft soil ground

    真空聯合堆載預壓法在軟土地基施工中的應用
  8. The conventional stack - preloading method which we use at present can not meet the requirement of stabilization, time limit of construction and the settlement after completion of works, so a new kind of technique is to be introduced to soft soil treatment

    高速公路的建設必須首先對這種地基進行處理。目前,常規堆載預壓法很難滿足施工穩定、工期和工后沉降的要求,必須採用新的技術措施進行處理。
  9. The investigation team led by secretary for environment, transport and works, dr sarah liao, did not find any leakage in the pipes when a tracer dye was used to test the soil stack

    由環境運輸及工務局局長廖秀冬率領的調查隊曾用示蹤感染測試污水管,當時並未發現污水管有任何裂縫。
  10. 1. on the bases of some basic suppositions, terzaghi ' s one dimensional consolidation and principles of layered summation method, the paper draw the formula which can calculate the embankment of layered filling and take the formula into programme ; 2. building the finite difference model of layered high - stack soil, carrying out numerical simulation of construction sequence, construction velocity, interface element of layer - stacked, the author get the numerical solution

    1利用一些基本假定,根據太沙基一維固結理論和分層總和法的基本原理,推導出來計算分層填築體自身沉降的公式,並編制了程序; 2建立了分層填築高填方路堤問題的有限差分模型,並對分層填築的施工順序、施工速度,界面單元進行了數值模擬,獲得了位移場和應力場的數值解。
  11. Through the research of theory, centrifuge test and numerical simulating, the paper brings forward the evidences in theory for the design and construction of high - stack soil, so the paper is valuable in engineering application

    本文通過理論,試驗和數值計算的研究,為高路堤的設計和施工提供了理論依據,因而本文的研究具有廣泛的工程適用價值。
  12. It is postulated that the reflux could have contained droplets of contaminated sewage present in the soil stack, be dispersed into the bathroom, and be extracted by the bathroom exhaust fan into the light well between adjacent units. the contaminated droplets could then enter other units through open windows

    我們推測這氣流可能把存於污水管內帶病毒的水滴散發至浴室內,而浴室的抽氣扇亦可能把這些水滴排放在分隔相鄰單位的天井,最後帶病毒的水滴通過窗戶進入其他單位。
  13. The vent pipe runs in parallel to the soil stack and is connected to the branch soil pipe from a bathroom on the fourth floor. it serves to equalize the air pressure between the main soil stack and the branch soil pipe

    污水排氣管與污水管平衡敷設,並與四樓一浴室的支污水管連接,作用是平衡主污水管及支污水管之間氣壓。
  14. At the time of the outbreak, the floor drain traps ( which when filled up with water are designed to prevent a reflux and act as a barrier between the floor drain and the soil stack ) in many apartments seemed to have dried out and did not contain water for long periods

    出現爆發時,多個單位的連接地面排水口的聚水器似乎已乾涸多時,沒有貯水。 (這些聚水器的設計是在貯滿水時防止污水倒流,形成地面排水口和排污渠之間的屏障。 )
  15. Both investigation results pointed to the dry floor drain traps in the bathrooms of individual apartments which had provided an open connection to the soil stack through which contaminated droplets were drawn into the bathrooms when the exhaust fans were turned on. the droplets could have been drawn into the light - well by the powerful exhaust fans and re - entered into other apartments by natural currents through open windows

    兩個調查結果均顯示,由於個別單位浴室的連接地面排水口的聚水器乾涸,排水口與排污渠變得毫無阻隔,當強力的抽氣扇啟動時,帶病毒的液滴可能從地臺排水口倒流入浴室,這些液滴有可能被抽至天井,並經由打開的?戶隨著氣流飄進其他單位。
分享友人