spot curve 中文意思是什麼

spot curve 解釋
零息票利率曲線
  • spot : SPOT =satellite positioning and tracking 人造衛星定位及跟蹤。n 1 斑點;污點;疵點,缺點。2 地點...
  • curve : n 1 曲線;彎曲;彎曲物。2 曲線規 (=French curve);【機械工程】曲線板;【棒球】曲線球;【統計學...
  1. Types of pay structures are graded, broad - banded, job family, individual pay grade, pay curve, spot rate and pay spine

    薪酬結構的類型包括分級廣分職級職位群個人薪級薪酬曲線職位等級和薪酬主幹等。
  2. Second, this paper analyzes the relation of reactive support service with voltage, power limit curve, transaction amounts. according to the power limit curve, this paper analyzes the source of the reactive cost to get an interzone cost function. using marginal cost theory, it concludes that the reactive spot price is the derivative of the cost function in generator buses

    另外,本文還從發電機角度上分析了無功服務與電壓、功率限制曲線、發電機向負荷傳輸電能大小的關系;根據功率限制曲線對發電機無功成本的來源進行詳盡剖析,從理論上確定一個分區間的成本函數;並依據短期邊際成本理論可推出,計算發電機節點的電價可採用無功成本函數的偏導數的方法。
  3. The paper on the basis of the study on the control of the changing slope curve paving in theory, through the study on the responses of the screed to different input signal in condition of the erected string, the controller of the transverse gradient and the floating beam on the spot experimentations, and through the analyzes the three paving design method in theory and the experimentation, on through the analyzes the three paying design method in theory and the experimentation data, provides some material solving measures to solve the changing slope curve paving

    摘要根據彎道變坡攤鋪控制特性的理論研究,在工程實際中採用掛線法、橫坡控制器和浮動均衡梁進行了不同輸入激勵函數下熨平板響應的試驗研究,並通過對這3種攤鋪設計方法的理論和試驗數據的分析,提出了解決彎道變坡攤鋪的具體措施。
  4. The inverted pwm changing electric current the technique is applied in the prototype model. the prototype model was tested and operated on spot, power factor could reach beyond 0. 95, the effect of following modulating voltage was better, the curve of factor of modulated voltage of exchanging systems changed following load rate was linear, the output of wave form was a flat and steady sinusoidal wave

    樣機採用了逆變式pwm變流技術,對其進行了現場測試與試運行,測試結果是電網側的功率因數可達0 . 95以上,跟蹤調壓效果良好,變流系統輸出調壓系數( k )隨負載率( p )的變化曲線基本滿足直線關系,輸出波形呈平滑穩定的正弦波。
  5. It was found out that the prevalence of tobacco brown spot disease alternaria alternata ( fr. ) keissler presented growth with logistic curve pattern, and the degree of disease fluctuated greatly among different years in the tobacco region of hunan

    摘要通過在湖南主產煙區5點16年次以上系統調查,發現赤星病季節流行呈邏輯斯蒂曲線增長,發病程度年間波動大。
  6. 4. through our research, the whole measuring scheme is finalized for pulse - counting method with analog intervene chosen to measure distance, the differential coefficient method based on the least - squares curve fitting based on power functions chosen to measure velocity and qd optical spot location method chosen to measure angle

    4 .通過研究,最終確定了以模擬插入脈沖計數法測距,冪函數族基最小二乘曲線擬合微分法測速,四象限探測器( qd )光斑定位法測角的脈沖激光雷達整體測量方案。
  7. This article aims at the characteristics of a baibie harbor great bridge, by the spot construction test and mechanicses, limited an analysis, dissolve to the construction technics and loading capacity, stake deliver mechanism, bearing stratum and glazing rock depth area curve etc. s of the borehole cast - in - place concrete pile in the karst terrain do the some study research

    國內外對于巖溶地區鉆孔灌注樁的研究,主要是針對具體工程的施工方案描述和施工故障及處理措施,對巖溶地段基樁的承載機理及承載力的綜合研究則未見報道。本文針對白墅港大橋的特點,通過現場施工試驗及力學、有限元分析,對巖溶地區鉆孔灌注樁的施工工藝、荷載傳遞機理、持力層厚度及嵌巖深度等方面做一些探討性研究。
  8. After analyzing, the author got the basic character of tidal flat hydrodynamic : the time of flooding on bare flat and ebbing is basically the same and the time of flooding on pioneer zone of salt marsh is a little short ; the process curve of current speed on bare flat did not appear peak value on the beginning of flooding and at the end of ebbing but presented double peak, that is, it presented double peak in winter and spring and ebbing peak value disappeared in summer and autumn, salt marsh presented single peak character in a year and the process curve in tidal creek presented double peak ; all current direction on every spot presented gyration current and the current speed changed rapidly during the high water level without obvious slack water period

    分析得到了潮灘水動力基本特徵:光灘水位漲潮和落潮時間基本相等,而鹽沼前緣帶水位漲潮時間略短;光灘流速過程線在漲潮初和落潮末出現峰值,呈現「雙峰型」特徵,鹽沼前緣帶則冬、春季節呈現「雙峰型」 ,夏、秋季節落潮峰值消失,鹽沼帶四季呈現單峰特徵,潮溝內過程線為「雙峰型」 ;各測點流向均呈現回轉流特徵,在高水位時流向迅速改變,不存在明顯的憩流。
  9. Samples are prepared at 1100 and 1200 for different time from 5 minutes to 4 hours to study direct - nitridation kinetics. the thickness of the silicon nitride films is measured by single - spot thickness system produced by filmetrics co. ltd. the direct - nitridation kinetics curve is attained and the maximum thickness of the silicon nitride film is about 50nm

    為研究矽片氮化動力學,在1100和1200的溫度下制備了從5分鐘到4小時的各個氮化時間的樣品,並採用了不同晶面取向的矽片和不同的矽片放置位置,用filmetrics公司生產的f20型膜厚測量儀測得各個樣品的厚度,得到了實際的氮化動力學曲線和氮化薄膜的最終膜厚約為50納米,氮氣曲線較好地符合了氣固反應類型的動力學曲線。
  10. Through the comparison between test and commission of low water - cut oil layers and the analysis of electric property and logging display characteristics, this paper brings forward the methods for identifying oil layer, low water - cut oil layers and oil and water layers, namely, through the comparison between natural potential and natural gamma as well as the varieties of oil saturation, electric resistivity, curve shape of hydrocarbon, volumetric coefficient and geochemical bright spot index to identify the layers

    通過對低含水油層的試油與投產對比,對電性、錄井顯示特點的分析,提出了用測井自然電位與自然伽馬對比、含油飽和度、電阻度、氣測全烴曲線形態、灌滿系數、地化亮點指數的變化等識別油層、低含水油層、油水同層的方法。
分享友人