stage construction 中文意思是什麼

stage construction 解釋
分期構造 ,多層面構造
  • stage : n 1 講臺;舞臺;戲院,劇場;〈the stage〉戲劇,戲劇藝術;戲劇文學;〈the stage〉戲劇業;劇壇。2 ...
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. This paper is a study of narrative embedding, which, as a rewarding method of plot construction in narrative texts, constitutes an important component in the poetic presentation of theme on the absurdist stage

    摘要本文探討了嵌入式敘事模式在兩部荒誕派戲劇經典名作貝克特的《克拉普的最後一盤錄音帶》和阿爾比的《動物園的故事》中的共性和特質,指出這一敘事策略的不同形態在兩劇中的詩性特徵。
  2. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總結了斜拉橋的發展及其施工工藝,並指出了橋梁施工控制的重要性之後,簡要的介紹了工程概況,敘述了炳草崗金沙江大橋監控細則、組織機構及監控的主要工作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋施工控制與監測工作的前期實驗工作和施工各工況標高、各節段支模標高、澆注混凝土后的標高的結構計算和其理論計算結果之後,詳細論述了主梁的標高線形控制方法和內容,實際支模標高的提出,結構應力監控的方法、布點、測讀及其對測讀數據的合理分析方法,索力檢測和結構溫度監測的方法。
  3. Destabilization style of an arcuated built - up system bridge, influence of nonconservative force of hanger rods, comparative between stress value in construction stage and stress value in finished bridge stage, stability coefficients in bridge code, these are discussed deep

    著重對失穩類型、橫撐在穩定中所起的作用、吊桿非保向力的作用以及施工階段的應力和成橋階段應力的比較、規范中穩定安全系數的規定進行探討。
  4. The required levels of construction cost estimates vary at different stages of project development , ranging from ball park figures in the early stage to fairly reliable figures for budget control prior to construction

    ?建築成本估算要求的精確程度在項目發展的不同階段發生著變化,從早期的相近數字到施工前預算控制時相當準確的是數字。
  5. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大量工程經驗的基礎上,結合蓮花水電站在1995年及1996年導流渡汛工程措施設計及水工模型試驗,對混凝土面板堆石壩的導流渡汛標準、導流方式及其選擇、施工期渡汛及壩體填築分期、圍堰設計以及施工方案及總進度等與混凝土面板堆石壩特點有關的問題進行研究,為工程建設提供一定的參考。
  6. The paper is based on the construction of the express - highway between yiyang and changde in hunan province, aiming at enhancing the serviceability of cement concrete pavement, probing into the structural assemblage of the cement concrete pavement, the roadway drainage system, contraction joint with the dowel bar and precaution of bumping at the end of the abutment. it presents some achievements of the research, including more reasonable structural assemblage and roadway drainage system, the method of setting dowelled bar in contraction joint, putting forward the concept of stage - transition from rigid to flexile behind abutment

    本文以湖南省益陽至常德高速公路項目為依託,以提高水泥混凝土路面使用性能為目標,就水泥混凝土路面結構組合、路面排水系統、縮縫設置傳力桿、橋頭跳車問題的防治等方面開展研究和工程實踐,取得了豐富的研究成果,如研究採用了更合理的路面結構組合,設置了較完善的路面排水系統,在國內高速公路上率先全面採用縮縫加傳力桿技術,對所有橋涵構造物臺背全部採用剛柔過渡技術處理橋頭跳車問題等。
  7. The monitoring of cracks of floor slab at construction stage

    現澆混凝土樓板裂縫的施工階段試驗研究
  8. Roll over protective structure ( rops ) is a device which installs on out of construction vehicle. the main functions are : when the vehicle rolling over. rops can prevent the vehicle from rolling over further, and reduce the possibility of rolling vehicle injures operator ; when the vehicle traveling on freezing soil. concrete and rock, it has large resist continuous impact ability ; when the vehicle overturning rops can support the whole vehicle. arrangement of falling object protective structure ( fops ) can block objects ( such as trees, rocks ) so that supply protection for operator. this problem is that research rolling over and falling objects protective structure of bulldozer by learning research condition of rops / fops and relative lay down international standard. on the base of theory analysis. detrudes counting formula of rops / fops deformation through founding mechanics analysis model of rops / fops at the stage of elasticity and plastoelastic. and finds a set of feasible nonlinear finite element analysis counting. lt calculates rops / fops plastoelastic deforma variable of 320hp bulldozer, bulldozer has been carried out by optimizing design method

    其主要功能是:當車輛滾翻時, rops能刺入未凍土壤而阻止車輛的進一步滾翻,降低滾翻的車輛對系著安全帶司機軋傷的可能性;保證rops在碰撞和沖擊變形不大的地面(如凍土、混疑土上、巖石)時,能具有相當大的抗連續沖擊能力;當車輛已經處于顛覆狀態時,已經變形的rops應能支撐住整車。落物保護裝置(簡稱fops ) ,其構件的布置方式要能遮蔽墜落的物體(如,樹木、巖石等) ,以便對司機提供適當的保護。本課題主要通過了解國內外有關對rops fops的研究情況和有關國際標準的制定,對大型推土機傾翻和落物保護裝置進行研究,在理論分析的基礎上,通過建立rops fops的力學分析模型,推導彈性、彈塑性階段rops fops變形的計算公式,建立一套可行的rops fops的非線性有限元分析計算方法。
  9. According to the situation of china, the generalization should follow these two steps : the first is test - product stage. the main task of first stage is to impolder high - equality and costly wood - frame - construction house, focusing in depth on the sufficent - ability consumers

    根據我國國情,我國推廣輕型木構小住宅,須分兩步走:第一階段為實驗、試生產階段,針對有足夠消費能力的客戶群,研發高品質、高價位的木構小住宅。
  10. The single - stage hammer crusher are suitable used to crushing ordinary fragile ores of the compressive strength no more than 200mpa, such as limestone, gypsum, coal, marl, sand - shale etc. this series product features of high crushing ratio, even product graininess, simple construction, reliable operation, easily maintenance, economical running cost etc., so are widely used. hammer crusher models hammer crusher max

    錘破系經高速轉動的錘體與物料碰撞面破碎物料,錘式破碎機具有結構簡單,破碎比大,生產效率高等特點,錘式破碎機可作干濕兩種形式破碎,錘式破碎機適用於礦山水泥煤炭冶金建材公路燃化等部門對中等硬度及脆性物料進行細碎。
  11. The construction of a music hall is still on the blueprint stage

    音樂廳的建造還在籌劃的階段。
  12. The project content : construct first production line for period 102 thousand tons per year ; the consequence will be started when the surrounding bamboo source develops in scale to guanrentee the enough material for the second stage construction

    項目內容:建設首期10 . 2萬噸/年漂白竹漿生產線;待項目建設及周邊竹材資源有更大發展時,能保證第二期項目建設原料之需時,建設第二期項目。
  13. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  14. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  15. Main quality management stages are project design stage, pre - construction stage, construction stage, check before acceptance stage

    主要有以下的一些階段:項目設計階段的質量管理、項目施工前期的質量管理、項目施工過程的質量管理和項目竣工驗收階段的質量管理。
  16. The scheme of natural draining and pre - compression with stacking load has not only treated the dredging region, but also prepared a great deal of rocks for the second - stage construction of dayaowan and saved time for backfill work. and it will be possible that the berth 11 # of the second - stage construction is put into production as soon as possible. the scheme simplifies the unnecessary process of foundation treatment and its direct economic benefit and the social benefit are very remarkable

    在隨后進行的大窯灣吹填區兩個場地堆載處理的工程實踐中,借鑒了本次方案研究的成果,採用自然排水堆載預壓方案,既進行了吹填區的處理,也為大窯灣二期準備了大量的開山石料,節省了回填工期,從而使二期11泊位盡早投產成為可能;從經濟效益角度分析,採用此方案簡化了不必要的基礎處理過程,直接效益與社會效益非常顯著。
  17. The first - stage construction of dayaowan has formed a region about 1 km2 by dredging. in this area, because the dredging points were set scarcely, soil formed becomes a regional and radial distribution, in which the soft deposits occupies about 40 %

    大窯灣一期工程利用疏浚吹填形成了約1km的區域,在此區域中,由於設置的吹填點較少,形成的土質呈區域性放射形分佈,軟基佔40左右。
  18. Proceed from development of peasant household ' s micro - economic analysis model, summarized, summed up and settled the peasant households " utility models, utility behavior models, production behavior models, etc. adopted systematical effective analytical method to research peasant household production, consumption, utility, etc. stage construction, many angle, have explored out the function mechanism of the structural adjustment decision behavior of peasant households further

    從農戶微觀經濟分析模型的演變出發,對農戶的效用模型、效用行為模型、生產行為模型等進行總結、歸納和梳理。對農戶生產、消費、效用等多層面、多角度採用系統有效的分析方法,進一步發掘出了農戶的結構調整決策行為的作用機理,得到了一個包含消費、投資、效用與需求在內的農戶決策行為的成因機理的核心方程,並建立了理論模型和計量經濟模型相互溝通的具體「橋梁」 。
  19. Risk analysis on pre - stage construction schedule of tunnels for laxiwa hydropower project

    戈蘭灘水電站施工前期設計與施工回顧
  20. According to the situation that the map cracking appears in some fill section in the first stage construction of the connecting line of bay bridge in zhanjiang city, this paper makes the experimental analysis on it and advances some corresponding measures

    根據湛江海灣大橋連接線一期工程某些填方路段出現龜裂的情況,進行了試驗分析並提出了相應措施。
分享友人