stage-area method 中文意思是什麼

stage-area method 解釋
水位面積法
  • stage : n 1 講臺;舞臺;戲院,劇場;〈the stage〉戲劇,戲劇藝術;戲劇文學;〈the stage〉戲劇業;劇壇。2 ...
  • area : n. 1. 面積;平地;地面。2. 空地;〈英國〉地下室前的空地。3. 地區,地方;〈比喻〉區域;范圍。
  • method : n 1 方法,方式;順序。2 (思想、言談上的)條理,規律,秩序。3 【生物學】分類法。4 〈M 〉【戲劇】...
  1. Nalysis of check and acceptance method of first stage resettlement in xiaolangdi reservoir area

    小浪底庫區第一期移民安置驗收方法分析
  2. Erosion damage decreases rock load area, after defining damage variable, the damage stress in rock can be calculated by the method bring forward by lemaitre conveniently. for surrounding rock of a deep buried tunnel under the condition of drained, its seepage character is not only controlled by the high stress in rock, but also influenced by the development of erosion damage. in the whole course of rock " s deformation and failure, its seepage character decreases with the increment of stress in elastic stage, while " increases with the development of failure

    巖樣中全應力?應變三軸滲透試驗過程中的典型表現為隨著應力的增加,巖體內的空隙和裂紋受載閉合,滲透性降低,應力達到一定閾西南交通大學鷹士研究生學位論文第11頁值后,巖體內部裂紋發生擴展和歸並,滲透性增強;同樣,地下水的動、靜壓力作用對裂紋的擴展和歸並也起著促進作用。
  3. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土斜心墻和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  4. In the stage of stereo matching, in order to get dense disparity images, we do a lot of research on area matching method and compare the effect caused by different operators and windows

    在立體匹配階段,本文以獲得緻密的視差場為目的,對區域匹配方法進行了詳細的研究,比較了不同運算元以及不同窗口對匹配性能的影響。
  5. Using biomechanics methods, through the study of the influence of different injection and maintain period on the expansion efficacy and shrinkage rate of skin, a rapid expansion method with relatively big expansion area is proposed ; biomechanics analysis in vivo is been made on the expanded skin ; comparing the biomechanics property in vitro of the rapid expansion and conventional expansion with different maintaining times, the parameters such as strength, stress - strain relationship, stress relaxation and creep which reflect the characteristic of the expanded skin have been obtained ; making the research of the expanded skin ' s biomechanics changes at different stage after grafting, the long - term and short term diversified regular has been obtained ; making experimental study and discussing the changes in the microcirculation and vessel structure of exceedingly expanded shin, the relationship between survival length of flap and the changes has been gotten

    本課題旨在用生物力學的方法通過動物實驗來研究不同注水擴張期和維持擴張期對皮膚擴張量和皮膚回縮的影響,探討有效獲取較大的擴張皮膚面積的快速擴張方法;對擴張皮膚進行在體生物力學特性分析;比較了快速擴張和常規擴張在不同維持期的皮膚離體生物力學特性,得到離體生物力學各參數,如強度、應力?應變、應力鬆弛、蠕變等;為全面了解擴張皮膚在移植后的近期和遠期的變化規律,做了擴張皮膚移植后不同階段的生物力學變化的實驗研究;探討了不同擴張量時皮膚的微循環變化和血管結構變化與皮瓣存活的關系。
  6. This is the working method of the interim that our country rural economics develops very lopsided place to decide, as the development of rural economics, be in conditional area to will increase the strength that the government drives stage by stage, in order to reflect the character with safe society

    這是我國農村經濟發展很不平衡所決定的過渡時期的工作方法,隨著農村經濟的發展,在有條件的地區將逐步加大政府推動的力度,以體現社會保險的特性。
分享友人