state-space graph 中文意思是什麼

state-space graph 解釋
狀態空間圖
  • state : n 1 〈常作 S 〉國,國家;〈通例作 S 〉(美國、澳洲的)州;〈the States〉 美國。2 國務,政權,政府...
  • space : n 1 空間;太空。2 空隙,空地;場地;(火車輪船飛機中的)座位;餘地;篇幅。3 空白;間隔;距離。4 ...
  • graph : n. 1. 【數學】曲線圖;坐標圖,圖表。2. 統計曲線。vt. 用圖表表示,把…繪入圖表。n. 膠版。vt. 用膠版印刷。n. 【語言學】1. 詞的拼法。2. 表示音素的最小字母單位。
  1. In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future

    本文結合重慶市大渡口區「三木花園」開發建設項目,從地下空間靜力結構穩定性分析角度出發,針對在該項目中涉及的高層和多層建築物以及在其地下20米處開挖了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體工程情況,採用2d - 3d -有限元結構分析程序對高層與多層建築物的地基基礎及其與城市軌道交通使用的地下隧道圍巖的應力與位移演變規律進行了有限元數值分析計算,探索了地下空間圍巖與高層或多層建築物地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層建築物狀態和地下開挖用於軌道交通的地下隧道狀態等三種不同狀態以及4個水平剖線和4個垂直剖線等不同情況,從以下幾個方面具體分析研究了計算斷面的應力與位移分佈規律: ( 1 )在各種不同狀態下計算斷面的主應力矢量圖、位移分布圖( ux 、 uy )以及應力等值線色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同水平與垂直剖線的應力_ 1 、 _ 2和_ ( xy )對比分佈曲線; ( 3 )不同狀態下相同水平或垂直剖線的應力_ 1 、 _ 2和_ ( xy )的對比分佈曲線等,為今後在對地下空間的開發利用以及在高層建築物地下開挖硐室時的工程設計和工程施工提供參考依據。
  2. Most artificial intelligent planning algorithms are based on planning graph or state space search. ff based on both planning graph and heuristic state space search and performed standout in the 2nd and 3rd international planning competition

    Ff規劃器將規劃圖和啟發式狀態空間搜索原理進行了很好的結合,在兩屆ipc ( internationalplanningcompetition )中取得了優異的成績。
  3. 4 ) by the bond graph theory, a bond graph model is established and the state - space equations of drive system of the cvt car are derived

    4 )應用鍵合圖理論,建立了金屬帶式無級變速汽車傳動系的鍵合圖模型,推導了系統的狀態方程。
  4. However, because coordination graph needs discrete state variant, it ca n ' t be applied in continuous state space such as robocup which communication condition is limited

    但是協作圖要求離散狀態變量,所以無法直接應用到類似robocup這種通訊條件受到限制的連續狀態空間。
  5. Power bond graph is used to established the bond graph model of the lifting and dropping of hydraulic pile hammer and state space equation in the paper for hydraulic pile hammer is perplexing nonlinear system. in order to attain the graph that pressure, position, velocity, acceleration vary with time in the course of driving pile simulation procedure solving state space equation is designed on the basis of combining four - order runge - kutta method with predicator - corrector method, dynamic simulation of the hydraulic system is studied in matlab 6. 5. it is convenient to analyse dynamic characteristics of the hydraulic syste m, beneficial to the design and parameter optimization of the hydraulic system. in the final part of the paper, under detailed analysis of the control characteristics for double - acting hydraulic pile hammer with double cylinders, control system based on the programmable logic controllers founded on technology of modern compute is designed

    由於液壓打樁錘液壓系統是一個復雜的非線性系統,本文採用功率鍵合圖法建立液壓打樁錘上行、下降的鍵合圖模型和狀態空間方程,通過四階龍格?庫塔法和預估?校正法相結合編制了模擬程序對狀態空間方程求解,在matlab6 . 5中進行液壓系統的動態模擬,獲得液壓打樁錘運動過程中壓力、位移、速度、加速度等隨時間變化的曲線圖。此曲線圖方便了對液壓系統動態特性分析,為液壓系統的設計和參數優化提供了有益的借鑒。最後,在深入分析雙缸雙作用液壓打樁錘控制系統的功能要求后,採用了以現代計算機技術為基礎的新型工業控制裝置? plc可編程式控制制器,設計出了雙缸雙作用液壓打樁錘的電器控制系統。
  6. So this article put forward a theory that the optimal problems can be summed up to the mathematic and computing models of state space search of optimal problems. this conclusion unifies the dijstra algorithm used in finding shortest path of traditional explicit graphs and the optimal search of implicit graphs, the search of graph and the search of graphs " tree into a common model and algorithm

    本文提出了將優化問題歸結為狀態空間最優化搜索問題的數學模型和通用演算法,將傳統的在顯式圖中求最短路的dijstra演算法與隱式圖的優化搜索,隱式圖搜索與隱式樹搜索全部統一到同一個模型和演算法中去。
分享友人