step load 中文意思是什麼

step load 解釋
階梯荷載
  • step : vi ( pp )1 走;跨步。2 踩,踏上 (on)。3 跳舞,輕快地走,合著步調走。4 跨入,踏進。5 走上。vt ...
  • load : n 1 裝載,擔子;負擔;工作(負荷)量。2 (車船等的)裝載量;一馱,一車,一飛機。3 【電、機】(機...
  1. Midship section design is a vital step among ship ' s design. this section endures most bending load, and materializes the structure of the whole ship

    船舯所受彎矩最大,是全船結構主要矛盾之所在,組成了船體結構的全局性構想,因而是船舶設計的重中之重。
  2. In this dissertation, according to the theory of mechanical dynamics and multi - body dynamics, a simulation model of nj2046 light off - road vehicle including suspension system, steering system and tires is built with the software carsim and so the vehicle steering characteristics are analyzed with the step angle input of steering wheel. it is found that the steering characteristics are different when the velocity and load are different, and the relationship between steering characteristics and velocity and load is presented

    本文根據機械繫統動力學、多體動力學理論,運用動力學模擬軟體carsim建立了包括懸架系統、轉向系統和輪胎等模型的nj2046越野汽車整車模擬模型,在此基礎上分析了nj2046越野汽車在方向盤轉角階躍輸入時的轉向特性,通過對不同車速、不同載荷條件下的模擬計算,得出了在這些條件下該車具有的不同表現特徵,揭示了轉向特性與車速、載荷和輪胎的內在關系。
  3. The basic theory and step of whole process analysis of reinforced concrete beam section flexural rigidity is stated, the realization program is worked out and the academic example is analyzed. 4. based on the static - state load test result of two practical projects, the application of the reinforced concrete beam system bridge structure disease examination and structure damage evaluation method is stated, and satisfaction result is gained

    1 、綜述了當前混凝土橋梁結構檢測及損傷識別的各種方法體系,並簡要評價了各方法體系的應用與不足; 2 、論述了基於靜載試驗的梁分段剛度系統識別的基本原理,編制了實現程序,並進行了數值算例分析,提出基於本原理的梁橋結構損傷識別與結構評價方法體系; 3 、闡述了鋼筋混凝土梁截面抗彎剛度全過程分析的基本原理和方法步驟,編制了實現程序,並進行了相關算例分析; 4 、結合兩片工程實例梁的靜載試驗,詳述了梁橋結構損傷識別與結構評價方法的應用過程,得到了預期的效果。
  4. The first step is form finding ; the second is load analysis ; the last step is cutting pattern design. the first and the last step are the most important

    第一階段是找形設計階段;第二階段是荷載分析階段;第三個階段是裁剪分析階段。
  5. The last step is to pass the initial start and limit parameters to your data load

    最後一步是將原始啟動和權限參數加入你的數據裝載。
  6. If the total test duration is shorter than the time that is required to step up to the maximum user load, then the test stops after the elapsed duration and does not reach the max user count target

    如果總的測試持續時間比逐步增加到最大用戶負載所需的時間短,則經過測試持續時間后,測試將停止,並且不會達到「最大用戶計數」目標。
  7. In this paper, the drive theory of the large ratio friction transmission is studied ; a new type elliptical cam wave generator is designed ; the large ratio friction transmission prototype is designed and manufactured ; based on the ansys finite element method software, structure of the elliptical cam is analyzed ; precision index of the manufactured large ratio friction transmission prototype, such as transmission accuracy, least step, stability of the least step, load capacity is measured by the absolute rotary encoder. by analyzing the measurement data and research content, it is think that the new elliptical cam wave generator could overcome a good many problems brought by processing errors, facilitate size precision adjustments, input moment can be achieved in the form of a pure force couple importing ; through this study, " the large ratio friction transmission prototype " could apply in practical engineering basically

    本文研究了大速比摩擦傳動的傳動理論;設計了新型橢圓凸輪波發生器,設計製作了大速比摩擦傳動樣機;用軟體ansys對所設計的橢圓凸輪結構進行了有限元分析;用19位絕對式編碼器測試了大速比摩擦傳動機構的傳動精度、最小步距、最小步距的穩定性以及帶負載能力等各項精度指標;對測量數據和研究內容進行了歸納和整理,認為新型橢圓凸輪波發生器克服了加工誤差帶來的諸多問題,新型橢圓凸輪波發生器可以進行尺寸精度調整,能夠達到輸入力矩以純力偶的形式輸入;通過本項研究,基本可以使「大速比摩擦傳動機構」在工程中得以應用。
  8. According to the frndamental and the steps of this method, we cans use the linear regress filter method to make the simulation of the wind load and then we can educe the curve of the time - process wind velocity. after that step, we can get the chart of the dynamic wind load which we can deliver the crosswind into the particle wind load and put them on the corresponding cell nodes. then we can do the analysis of the dynamical wind load through the time - process analysis to get the max value of the displacement

    根據線性回歸濾波器法的基本原理和步驟,藉助相關軟體進行風荷載的人工模擬並得出風速時程曲線,進而轉化為風動力譜,由此將橫風向風力表達成節點風荷載作用於相應的單元節點上,按時程分析法對該空間桁架體系進行風荷載的動力分析,求出結構在進行風動力荷載分析時,結構相應節點對應的最值位移值。
  9. You should generally run several runs with different step durations and step user counts so that you can get good measurements for a given load

    通常應運行具有不同的單步持續時間和單步用戶計數的幾個運行,這樣在給定的負載下可以準確地衡量。
  10. When the governing valve was series - connected on the return oil - line in the metering - out control system, under the same flow area and the same adjusted pressure of relief valve, with the incremental quantity of step load, the pressure highly - adjusted capacity of the hydraulic cylinder chamber with piston - rod increased, meanwhile, it ' s time of rise, time to peak and the governing time all increased. at the same time, the pressure highly - adjusted capacity of the hydraulic cylinder chamber without piston - rod increased

    當出口節流調速系統的回油路上串接調速閥時,隨階躍負載的增加,在相同流量閥開度、相同溢流閥調節壓力的情況下,液壓缸有桿腔壓力p _ 2 ( t )的超調量是增加的,上升時間、峰值時間以及調整時間也是增加的;液壓缸無桿腔壓力p _ 1 ( t )的超調量是增加的。
  11. The torque sensor is used to measure the load. the step motor and ball skew are used to drive the headstock

    使用扭矩轉速傳感器來測量轉速和載荷,並通過磁粉加載器來控制載荷。
  12. Used the metering - out control system in which the hydraulic cylinder was the executive element as research object in this thesis, the experimental research about the effect on the pressure p1, p2 of the hydraulic cylinder chambers when series - connecting throttle valve or governor valve on the return oil - line under the step load changing have made

    本文以單出桿液壓缸為執行元件的出口節流調速系統為研究對象,在其迴路上分別串接節流閥和調速閥,當負載發生階躍變化時,對液壓缸兩腔壓力p _ 1 、 p _ 2的影響進行了試驗研究。
  13. Through experimental research, the calculation formula that the pressure highly - adjusted capacity of two cylinder chambers varied with the change of step load and the formula about hydraulic elements main parameter ( rated pressure ) were both made, which had important valuation in selecting the main parameter about this hydraulic system

    通過試驗研究得出了出口節流調速系統中液壓缸兩腔壓力超調量隨負載變化的計算公式以及出口節流調速系統中液壓元件主參數(額定壓力)計算公式,有利於正確選擇系統的元件及主參數。
  14. Step load change

    負荷階躍
  15. Accorded to the experimental research, under different flow area of flow valve and different adjusted pressure of relief valve, conclusion that the regulation of the pressure p1, p2 in the two cylinder chambers varied with the change of step load were as follows : when the throttle valve was series - connected on the return oil - line in the metering - out control system, under the same flow area and the same adjusted pressure of relief valve, with the incremental quantity of step load, the pressure highly - adjusted capacity of the hydraulic cylinder chamber with piston - rod decreased, meanwhile, it ' s time of rise, time to peak and the governing time all decreased. while the pressure highly - adjusted capacity of the hydraulic cylinder chamber without piston - rod increased

    通過試驗研究得出系統在不同的流量閥開度、不同溢流閥調節壓力(進口壓力)下,液壓缸兩腔壓力p _ 1 、 p _ 2隨階躍負載變化的規律:當出口節流調速系統的回油路上串接節流閥時,隨階躍負載的增加,在相同流量閥開度、相同溢流閥調節壓力的情況下,液壓缸有桿腔壓力p _ 2 ( t )的超調量是減小的,上升時間、峰值時間以及調整時間也是減小的;液壓缸無桿腔壓力p _ 1 ( t )的超調量是增加的。
  16. The step load is a good way to determine the number of users at which this occurs

    單步負載是確定發生上述情況時的用戶數的好方法。
  17. Elastic - plastic dynamic response mechanism of a variable cross - section cantilever beam subjected to step load

    階躍載荷作用下變截面懸臂梁的彈塑性響應模式
  18. The step load pattern is used to specify a user load that increases with time up to a defined maximum user load

    單步負載模式單步負載模式用於指定隨時間不斷增加到定義的最大用戶負載的用戶負載。
  19. For example, set the start and maximum user counts for the step load pattern. after you choose the load pattern, click next

    選擇了負載模式之後,單擊「下一步」可前進到「負載測試向導」的「文本組合」頁。
  20. Under the integral control mode, the same simulation results are got with the difference integral and differential coefficient when the step load happens

    在積分控制工作方式下,取不同的積分、微分系數,在負載階躍變化時得到了與模擬控制相同的模擬波形。
分享友人