stress anchor 中文意思是什麼

stress anchor 解釋
預應力錨具
  • stress : n 1 壓力,壓迫,緊迫,緊張。2 【語音】重音;重讀;【詩】揚音;語勢,著重點。3 重要(性),重點,...
  • anchor : n 1 掛錨;錨狀物。2 樁,支架。3 〈比喻〉依靠。4 【體育】一隊運動員中最後參加比賽的人;殿後的人〈...
  1. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    首先,在前人研究成果的基礎上,對錨桿與圍巖的相互作用機理進行研究,利用全長錨固錨桿的中性點理論,從等效均化的角度來考慮錨桿對圍巖的加固作用,並推導了在簡單荷載作用下,含有襯砌、等效加固后的圍巖、原始圍巖三者的彈塑性解析解,對工程設計有著重要的參考意義;在數值模擬方面,以考慮錨固圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有限元方程的計算格式,為開發運用大型商用有限元軟體msc . marc提供了理論根據,也形成了本文的理論基礎:最後,論文以南水北調東線穿黃隧洞穩定性分析項目為工程實例,利用本文所述的接觸問題的摩擦模型理論,對錨桿支護結構的應力場、位移場的變化規律進行了研究,分析了加錨支護對隧洞圍巖應力、變形的影響。
  2. The existing theoretical analyses have n ' t refelcted this true mechanism of the force transfering in fixed segment of anchor bar. for the sake of studying the working course from elastic to elastoplasticity slide better, this paper put forward shear stress - displacement curve, and solve the internal force distribution along anchor bar by the basic equntion. at the same time, this paper analysize the difference of columniform fixed segment and the segmeng with anchor slab at the foot of anchor bar

    為了更好的研究錨桿在不同荷載作用下,錨桿的工作狀態從彈性到彈塑性發展的整個過程,本文進行了錨桿受力的模型實驗研究,根據實驗結果提出了剪應力與位移的彈塑性本構關系表達式,並根據錨桿受力的基本方程,求解得出了錨桿在不同工作狀態下從彈性到彈塑性滑移的全過程中錨桿的內力分佈。
  3. Stusy on the bolt - mesh - anchor supporting technique in the high - stress soft coal roadway

    高應力軟巖煤巷錨網索支護技術研究
  4. The suspension bridge consists of the following parts : bridge tower, main cable, hanger rod, stiffened girder and anchor bank. in the past, analytic method based on the suspension mechanics was mostly adopted in stress analysis of suspension bridge

    過去對懸索橋的受力分析多採用基於懸索力學的解析法,將主纜、加勁梁以及索塔各部分化整為零,對各部分的受力情況單獨考慮,並且分別計算各自的內力。
  5. The article structure the landslide prevention and cure, the structure of prestress anchors and its application in detail. basing on the geology condition of fabricating yard, we calculate the solid power and the length of anchor rope. we have worked out the experiment research scheme, and has carried on the earlier stage experiment, field demarcation experiment and has opened pulling the experiment on the spot. ten teams of steel rope to two teams of structure types twist the experimental data that thread internal stress and the total pulling force has been in progress research, and has put forward raising the measure of solid capability of prestress anchor and administering possessing

    本文以川藏公路滑坡路段為研究對象,對滑坡的治理、預應力錨索的結構、作用及其在滑坡防治中的應用進行了詳細的分析;基於施工現場的地質條件,對錨索錨固力及錨索最佳錨固段長度進行了理論計算;制定了實驗研究方案,進行了前期實驗、現場標定實驗、實地張拉實驗;對兩組結構型式的十組鋼絞線內應力及總張拉力的實驗數據進行了研究,提出了提高預應力錨索錨固性能的措施,以及具體的施工方案和施工工藝。
  6. This paper has come to some comprehensive conclusions on the basis of the practical use of this double - index evaluation method in the slope of pishihang channel. a calculating program for the double - index evaluation method is compiled to raise the calculating efficiency. the reinforce measures that adopt the new thesis of renewing stress and the expansive anchor are presented

    本文針對淠河總乾渠(城區段)邊坡這一實際工程引入了安全系數和可靠度相結合的雙重指標體系分析方法進行穩定分析,得出了較為全面的結論;在雙重指標體系分析方法的基礎上編制了計算程序,提高了計算效率;應用應力重塑新思想及其配套實施手段?膨脹錨提出了初步的邊坡加固解決措施。
  7. Analysis on monitoring results of locked anchor - bar stress at tgp permanent lock s vertical slope

    三峽永久船閘直立坡鎖口錨桿應力監測分析
  8. Depend on the advantage of military industry, it has been a professional company which could research, develop, design and machining pre - stress cable anchor, bolt and other machine

    藉助軍工優勢成為一家集科研設計加工預應力錨索錨具和機具的專業企業。
  9. The pre - stress anchor board supporting technology is economical, speedy and safe enough. it can broaden the constructing space and can promote the efficiency and quality of excavation and restructuring construction

    預應力錨板墻支護技術具有經濟、快捷、安全性高的優點,它可提供開闊的施工空間,提高挖土和結構施工的效率和質量。
  10. In order to find out an economical, practical and reliable supporting method, some relevant technical personnel and i, based on successful experiences and project instances, designed the pre - stress anchor board supporting system, which is to exert pressure on the anchors and to independently support slopes. this system has successed and replaced the pile - anchor supporting system used in past

    為探索一種經濟、實用、可靠的支護方法,結合一些成功的經驗和工程實例,筆者與有關技術人員一起設計了預應力錨板墻支護技術,在錨桿上施加預應力,主動、獨立支護邊坡,取代了過去了常用的樁?錨支護體系,並實施成功,成為島城近年來深基坑支護主要技術之一。
  11. The supporting mechanism of pre - stress anchor is given in following sentences in this paragraph : make full use of sectional stability, put - up steel - net shot concrete to the stratified earth as the trench is being excavated, and by this means, the little liding of soil layers and small broken slumps of rock slopes can be avoided

    預應力錨板的支護機理:充分利用巖土層自身或預處理的局部的穩定性,隨基坑開挖分層掛鋼筋網噴射砼,以避免土層幫片及巖石邊坡小的節理破碎滑塌,並把土壓力傳給錨板,由錨桿集中受力,通過錨桿的錨固力平衡土壓力。
  12. First scheme is cantilever anti - slide pile with drain system ; the other scheme is pre - stress anchor rope anti - slide pile with drain system

    方案一為採用懸臂抗滑樁加排水措施;方案二採用抗滑錨樁加排水措施。
  13. Besides experiments, the present domestic and abroad study on anti - slide pile is mainly analysis by traditional cantilever beam method, foundation coefficient method and elastic mechanic method. on the basis of previous studies, this paper carries out a research on relevant design and calculation theory about anti - slide piles, comprising the interaction between anti - slide piles and rock and soil of side slopes, the soil arching model of anti - slide piles and the internal stress calculation method of prestressed anchor cables

    目前國內外對抗滑樁的研究,除試驗研究外,主要採用傳統的懸臂梁法、地基系數法及彈性力學方法來進行分析。本文在前人的研究基礎上,通過對抗滑樁相關設計計算理論進行研究,包括抗滑樁與邊坡巖土體的相互作用,抗滑樁的土拱效應模型以及抗滑樁預應力錨索的內力計算方法進行分析。
  14. These measures included the slope horizontal displacement monitor, the supporting structure swag monitor, the subsidence monitor, the pre - stress of anchor monitor, the ribbed beam steel stress monitor. we monitored the whole process and got feedback information in time, so the trend and development of slope " s displa

    在施工過程中,我們採取了邊坡穩定性安全監測措施,主要包括邊坡水平位移觀測及支護結構撓度觀測;沉降觀測;以及錨桿應力監測;助梁鋼筋應力監測等。進行全過程的檢測並及時反饋信息,隨時掌握邊坡的位移趨勢與發展。
  15. Through inversion analyzing the results of inspection and observation which was applied the multipoint displacement measures and the drilling anchor stress measures to the top surface in the xianggui gypsummine eastern workings, this article will attempt to propose the deformation law of stope terrane after the underwater mine area, which provided a reliable basis for taking measures to control the strata movement

    摘要為了研究湘桂石膏礦的巖體變形規律,對該礦東采區頂板巖孔多點位移計觀測和鉆孔錨桿應力計檢測的結果進行綜合反演分析,提出了水下礦區開挖后采場巖層的變形規律,為採取有效措施控制巖層移動提供了依據。
  16. Introduced by prestressed pier in the gate of spillway in xiao xia hydroelectric power station, the text reasonably established 3 - d finite elements mechanic model by the advanced finite elements popular in the world which can expediently impose tension of anchor funicular at its place. it also considered possible diversified combination of loading, and indicated that the effect of its prestressed action is fruitful compared with its conventional counterpart by study of mechanic calculation in comparison. as a result, it vastly improved burdening state of pier. by analysis of 3 - d finite element method, it also gained the stress result indifferent boundary conditions such as breast wall joint support and fixed support, and the displacement result in diversified loading combination. those results gained the instructive and reference value in design of prestressed pier

    本文結合黃河小峽水電站泄洪閘預應力閘墩這一工程實踐,採用國際上已成熟的有限元方法,合理地建立了預應力閘墩的三維有限元模型,該模型可方便地按預應力錨索的點位施加錨索預張拉力,考慮了可能發生的多種荷載工況組合,並與無預應力閘墩結構進行了對比分析研究,指出其預應力效果是明顯的,可以大大改善閘墩結構的受力狀態,通過三維有限元分析,還得到了胸墻簡支、固端不同情況下的應力成果和各荷載下的位移成果,這些成果的取得對預應力閘墩的設計具有一定的指導和參考價值。
  17. It is difficult to use pre - stress anchor technique to the deep excavation pit on the coast, in which the stra - tum is highly filled with water and subjected to the penetration of sea water, therefore there is no suc - cessful experience

    瀕臨海邊的深基坑,地層含水量高,滲透性大,易受海水滲透影響,在這類基坑中應用預應力錨桿技術困難極大,鮮有成功的工程經驗。
  18. According to the special stratum condition 、 soil parameter 、 pile frame system in the protecting landslide of hongtian jianfeng in yongan city in fujian province, compile a fem program of plane strain and analyze the interaction by nonlinear fem on intensity discount. in the program, duncan - chang model is applied to earth, elasticity model is applied to pile and rock ; goodman element is set between pile and rock - earth and applied to simulate sliding plane and flexible floor ; sequential pole elements with original stress are applied to anchor cable

    在程序中土體採用了duncan - chang雙曲線本構模型,樁和錨固層以下的巖體採用了線彈性本構模型,並且在樁和巖土體間設置了無厚度的古德曼( goodman )單元,對于軟弱夾層和已知的滑裂面也採用古德曼單元模擬,錨索採用的是具有初始應力的連續桿單元模擬。
  19. Stress analysis of fushun wanxin bridge ' s anchor span

    撫順萬新大橋錨固跨應力分析
  20. But now, succeasful application for the pre - stress anchor technique in the same case has been gained by use of one construction method of orifice ponding pouring in the deep excavation pit supporting in xiamen postal edifice, which can be taken for example on similar engineerings

    在廈門郵電大廈探基坑支護的預應力錨桿工程中,採用一種「孔口堵水注漿」的施工方法,取得成功,可為類似工程提供借鑒。
分享友人