subcontractor development 中文意思是什麼

subcontractor development 解釋
分承包方的開發
  • subcontractor : 次承包商
  • development : n. 1. 發展,發達;進化。2. 展開;擴充;開發。3. 發達物,新事物,發展階段。4. 【生物學】發育(史);【軍,數】展開;【攝影】顯影,顯像;【音樂】展開(部);研製,研製成果。
  1. The real estate development cost control methods are specified of decision, design, execution stage to reduce the construction cost, and it is compiling feasibility study report and capital invest estimation in decision, optimizing the design scheme and designed rationally in the technique and construction drawing design stage, electing rational construction scheme in construction stage, controlling the change in the work and field visas strictly, examining and approving budge detailed, budge planning use the quantities list, electing the best subcontractor, preventing some monopoly raise the price, collecting the detailed data in the fieldwork, making strict bargain

    討論了房地產開發項目的決策階段、設計階段、實施階段分別需要採取的相關措施和方法,以盡量降低項目的工程造價,即在決策階段編寫詳細的可行性研究報告和編制投資估算;在設計階段優化設計方案,進行合理的技術設計和施工圖設計;在實施階段選擇合理的施工方案,嚴格控制工程變更和現場簽證,嚴格審核工程施工圖預算,工程造價的預算採用工程量清單報價,擇優確定專業分包單位,防止少數壟斷性行業任意抬價,深入現場,收集和掌握施工有關資料,制定嚴密的合同條款。
  2. A wanted subcontractor of the housing department was arrested and charged for allegedly offering 2 million in bribes to an hd architect and soliciting bribes from other subcontractors in connection with hd development projects in fanling and tin shui wai

    廉政公署拘捕及落案起訴一名被通緝的房屋署分判商,懷疑他在粉嶺及天水圍建屋工程中,提供二百萬元賄款予一名房署建築師,及向其他分判商索取利益。
  3. The remote subcontractor at site b is tasked with maintenance development and unit testing on the existing client server application

    Site b的遠程轉包商承擔維護開發、對現存的客戶/服務器應用軟體進行單元測試任務。
  4. Such premium portion of overtime wages shall not include any overhead, profit or markups of the development manager or the subcontractor ( s ), or any other costs, expenses, general conditions costs or fees

    該等加班費的超出部分不得包含任何開發管理人或分包商的管理費用、利潤或加價,或任何其他的成本、支出、一般條件造價或費用。
  5. Participating in trade specific risk assessment review for trades or systems under your responsibility, development of a swms for all work activities, and trade kick off meetings for trades under your responsibility, attending contractors ' daily “ toolbox talk ” safety meetings and other eh & s training as directed by the construction manager, partly reviewing subcontractor ' s eh & s plan and follow safety documentation process

    在施工經理的指導下,參加在你負責的包段或系統包段具體的危險評估審查,編制安全工作方法陳述,以及出席所負責包段的開工會議,出席承包商每天的「工具箱安全會議」和其他環境、健康和安全培訓,部分審閱分包商的環境、健康和安全計劃並遵從安全文件上的程序。
分享友人