superior item 中文意思是什麼

superior item 解釋
優質製品
  • superior : adj (opp inferior)1 在上的,上部的,比…高的,上級的,高級的。2 優良的,上等的,優秀的。3 優勢的...
  • item : n. 1. 條,條款,項目,品目,細目。2. (新聞的)一條,一則;(戲劇的)節目。adv. 〈逐條列舉時開頭用〉又,同上。
  1. Consultant consults - the flowers and plants tea - changes clothes - fragrant to smoke takes a bath - relaxes the volatile oil whole body affable massage - contemplates drop oil - forebody spa the affable massage - superior standard run skin - changes clothes - the flowers and plants tea dessert warm prompt : please ahead of time one day appointment, this service item does not participate puts crease in it

    專業護理流程:顧問咨詢品花草茶更衣香熏沐浴放鬆精油全身舒緩按摩冥想滴油頭部spa舒緩按摩優格潤膚更衣花草茶點心溫馨提示:請提前一天預約,此服務項目不參與打折。
  2. This item, superior in quality and moderate in price, is sure to be salable in your market

    本產品質量上乘,價格適中,在你方市場一定有銷路。
  3. By virtue of its superior quality, this item has marketed with a warm reception and quick sale in most european countries

    由於品質優良,該品種在大多數歐洲國家深受歡迎,銷售很快。
  4. In this dissertation, a novel drive system used in electromotion chair, rare earth permanent magnet brushless direct current machine ( repm bldcm ) drive system is proposed, which is provided background by ministry of nation science and technology " shiwu " programming momentous critical item - rare earth application project item - direct current brushless superior reliability rare earth permanent magnet machines

    本論文以國家科技部「十五」重大攻關項目? ?稀土應用工程項目之直流無刷高可靠稀土永磁電機為研究背景,結合課題要求,進行了充分的市場調研,確定了論文研究的主要內容為電動座椅用稀土永磁無刷直流電動機驅動系統。
  5. That how to enhance the rational method and countermeasure of the universities construction items design stage cost is studied emphatic, and on the foundation of the concrete example in the universities construction item, the article carries on the science assignment to the design quota of the construction item to the universities using the value engineering, and carries on the overall appraises to three kinds of design to choose the most superior plan using the level analytic method, thus to enhance the cost rationality of the universities construction item design stage

    簡要介紹了高校建設項目的建築設計與成本的相關概念和相互關系,重點研究了設計階段合理控製成本的方法與對策,並在分析具體實例的基礎上,利用價值工程對設計限額進行科學的分配,運用層次分析法對多種設計方案進行總體評價來選擇最優方案,從而探討在設計階段(特別是建築設計階段)合理控製成本的有效途徑。
  6. To get even the smallest item from the sores at work, you have to fill in a form, get it countersigned by your immediate superior, and then submit the request to the storekeeper between ten and eleven in the morning or three and four in the afternoon ? what a way to run a railway

    甚至要從工作的倉庫里領一件最小的東西,你都必須先填表,然後讓你的頂頭上司簽字,再在早晨10點到11點或下午3點到4點之間向倉庫保管員提交申請這是個多麼繁瑣的辦事過程!
分享友人