survey station 中文意思是什麼

survey station 解釋
測點
  • survey : vt 1 眺望,俯瞰,環顧。2 審視;通盤考慮[考察],觀察(形勢);概括,綜合評述。3 測量(土地),勘查...
  • station : n 1 站,臺,車站;航空站,機場。2 派出所;署,局,所。3 【無線電】電臺,電視臺。 4 駐地,部戍地,...
  1. Method and accuracy of circular construction declivity survey based on intelligent total station

    基於全站儀的圓形建築物傾斜觀測的方法和精度
  2. Fourth, the paper treats two kinds of hoisting projects of high alititude construction in bulk and member assembly, hositing machine and plan layout, setting up scaffold and joints, and installing trunks, branches and joints etc. then in detail discusses the method which applys total station to measure three - dimensional coordinate of dendriform structure, including selecting survey sign points, creating survey system and converting survey coordinate system etc. the paper also deep research on the welding performance, welding method, welding process, welding stress and control, welding strain and rectification, weld defects analysis and weld quality inspection, and so on complicated heterogeneity steel weld proplems

    接著系統的論述了高空散裝法和分單元安裝法兩種樹狀結構吊裝方案,樹狀結構吊裝機械及平面布置,樹狀結構胎架及節點的搭設,以及樹狀結構樹干、樹枝和節點的吊裝工藝等諸多工藝問題。詳細的論述了採用全站儀對樹狀結構進行空間三維坐標測量的方法,包括測量標志點的選取、測量系統的建立及測量坐標的轉換等問題。深入地研究了樹狀結構可焊性、焊接方法、焊接工藝、焊接應力及控制、焊接變形及矯正、焊接缺陷分析及焊接質量檢查等復雜的異種鋼焊接問題。
  3. Survey of earth station antennas for mobile satellite communications

    衛星移動通信地球站天線發展綜述
  4. According to the engineering practice, the theoretical basis and method that survey directly the horizontal distance and height difference by the total station system as fourth grade and below fourth grade control network are put forward instead of surveying slant distance and zenith distance

    摘要根據工程實踐,提出了用全站儀直接測量平距、高差來代替測斜距、天頂距作四等及四等以下控制網測量的理論依據和方法,並以張河灣抽水蓄能電站施工控制網為例進行了比較計算。
  5. Location problem of survey station in road network

    一類公路網路檢查站尋址的問題
  6. Based on the spectral irradiance measured with the sun - atmosphere ultraviolet spectrum radiometer ( sauvs ) developed by the institute of atmosphere physics and the changchun institute of optics and fine mechanics, chinese academy of sciences, measuring the direct and scatter irradiance spectrum of ultraviolet waveband which arrives in beijing global surface, giving a method of retrieving the aerosol optical depth ( aod ) and put up with primary results that exponential function can fit the retrieval results according to its visibility, putting forth different coefficients and functions on variable visibility, also giving a primary analysis on the aod in dust - storm day and some contrast between sun - day and dust - storm day, analyzing the ratio between scatter and total irradiance, and its relationship with atmosphere mass and total atmosphere optical depth, lastly contrasting with the survey results by aeronet beijing station, the results of retrieval is in reason, this work gives some help in researching the co - effect of aerosol - radiance - climate and makes preparation for further survey on the radiance characteristics of dust

    利用中國科學院大氣物理研究所與長春光學精密機械研究所合作研製的太陽?大氣紫外光譜輻射計( sauvs ) ,測量到達北京地表的太陽直接和散射紫外光譜輻射,導出了大氣氣溶膠的光學厚度。初步結果表明:北京紫外波段大氣氣溶膠的光學厚度在絕大部分情況下隨波長的增加而單調減小,用指數函數可以較好地擬合反演結果,統計得到了三個水平能見度狀況下擬合函數的系數值和公式表達式;初步分析了揚沙、浮塵、沙塵暴天氣條件下氣溶膠光學厚度的特點,並與一般晴朗天氣條件下的氣溶膠光學厚度特點做了比較分析;分析了太陽紫外譜輻射中散射輻射與大氣質量、大氣總光學厚度的定性關系和定量表達式;最後與全球氣溶膠監測網路( aeronet )北京站的資料做比對,表明反演結果基本合理。
  7. In this dissertation, we studied the tcra1101plus total station position system, which introduced the principle and characters of the instrument ' s closed loop tracking system. also we explained the cause of prism ' s position error and brought forward mathematic model to correct, moreover, the good results has been drawn form the expenriments. the kinetic survey system have been realized, which the sampling rate attain more than 5hz and the position precision can be less than 2mm on condition that targeted - point moving slowly at the velocity below 2cm / s. having finished the survey system to examine whether the fine - tuning stewart platform in good status, we have finished mensurating the position reference of the fine - tuning stewart platform and the offset of the prism

    在此基礎上研製了多臺儀器在線控制高頻采樣動態跟蹤測量系統,采樣率大於5hz ,在跟蹤小於2cm / s低速運動目標時,測量精度好於2mm ;完成對饋源二次精調系統的檢測,包括對二次精調平臺位置基準的標定和觀測棱鏡偏心差的測定;設計不同動態測量實驗,對全站儀動態跟蹤的誤差來源和特點進行了分析;從實驗角度,對全站儀的測量時滯及其穩定性進行了測試分析,給出了定量的結果;比較了全站儀和計算機的內部時間系統,發現兩者存在較大差異。
  8. Application of integration of total station and autocad software in construction survey

    軟體結合在施工測量中的應用技術
  9. Construction survey technology for upper reservoir of zhanghewan pumped storage power station

    張河灣抽水蓄能電站上水庫施工測量技術
  10. 3 abundance of microzooplankton hi jiaozhou bay varied significantly among sampling stations during the survey period. in general, high densities of microzooplankton appeared in water bodies of the inner bay, low densities were recorded at estuary and outer part of the bay. the highest annual average densities was recorded at station 3 ( 346. 45 ind. / l ), the lowest at station 10 ( 55. 54 ind. / l )

    3 、在不同采樣站,小型浮遊動物豐度差異明顯,灣內較高,灣口和灣外較低,年平均最高和最低密度出現於3號站和10號站,分別為346 . 45個升和55 . 54個升不同水層,小型浮遊動物豐度差異不明顯。
  11. The survey result made by hengshui environment survey station shows that the air pollution in hengshui in recent years is mainly due to coal fume and second - time dust and the water pollution is very serious and noise pollution is far beyond the standard

    摘要據衡水市環境監測站監測結果表明:近幾年衡水市空氣污染主要屬于煤煙和二次揚塵混合型污染;水質污染嚴重,噪聲污染嚴重超標。
  12. This text takes hydropower station of hunan town of wuxijiang river as an example, introduce hydro - generator unit operation parameter survey principle and method of the operation parameters online monitoring system for hydro - generator unit in detail, and carry on certain analysis by disposition and composition of hardware to system, design and realizing going on intact description of the software especially, make introduction of a certain degree to involve about database and communication technology at the same time

    本文以烏溪江水力發電廠湖南鎮電站為例,詳細介紹了水輪發電機組效率監測系統所監測參數的測定原理和方法,並對系統硬體的配置和構成進行了一定的分析,重點對軟體的設計和實現進行了完整的描述,同時對涉及到的有關數據庫和通信技術都做了一定程度的介紹。
  13. Under this circumstance, the advanced instruments and techniques such as total station and gps are applied during the construction survey, which play important roles in the controlled survey and the detailed survey with good effects

    施工測量中採用了全球定位系統( gps )和全站儀等先進的儀器和技術,它們在及時完成控制測量和細部測量中發揮了重要作用,取得了好的效果。
  14. Survey at stop, survey at station

    駐站調查
  15. After the field survey, the technique and implementation group of igcsb chose dajianshan where is 18km away from lanzhou seismic station in the south - west as the array site among several backup sites, and enforced a site survey on august, 1999. eignt suits of instruments supported by the analysis and prediction center, csb were used for the field observation, and 18 sites were deployed on two concentric circles and a beeline respectively. during the 18 days, we achieved about 3gb waveform data

    1999年8月,中國地震局地球物理研究所臺陣建設技術實施組經過實地考察,從幾個候選陣址中選中蘭州地震臺西南方向18km的大尖山作為ims蘭州臺陣陣址,在中國地震局分析預報中心的支持下,投入了8套地震儀器以同心圓分佈和直線分佈方式在蘭州大尖山陣址對18個測點進行了為期18天的野外觀測,取得了約3gb的地震數據。
  16. Based on adequate survey to faults of sodium pump for the china experiment fast reactor, in order that the advanced diagnosis methods are used in the sodium pump which is under fabrication, different methods of fault diagnosis system of sodium pump are designed and programmed ; and the principal component analysis ( pca ) is used to fault diagnosis system of main coolant pump in a nuclear power station. the feasibility of fault diagnosis systems developed have been proved by simulation results

    本課題對中國實驗快堆鈉泵的故障進行了研究,把先進的診斷方法應用到正在製造中的鈉泵上,設計和開發了不同方法的鈉泵的故障診斷系統;同時也應用主元分析方法,建立了某核電廠的主冷卻劑泵的故障診斷系統,模擬實驗證明了以上三個系統的可行性。
  17. Slcad easily adapts to the wide range of technologies used for line surveys such as total station instruments. it accepts survey data in both the plan and the profile coordinate systems. survey data can be keyed in, or can be electronically imported from a survey data file. slcad has a customizable data import routine that can read a wide range of survey data formats

    控制尺寸調整了,修改一下前面輸入的控制尺寸的數據,后續生成的桿件和圖形自動就隨之變化,包括尺寸標注都自動隨之移動節點板設計改變了,相關的其餘的桿件會自動調整並且材料表會自動修改!
  18. 7. electric survey for the rebuilding project of donghu pump station

    7 .東湖泵站改造工程電法勘探
  19. Zhang baoquan, zhao lihua environmental protection survey station, benxi, 117021

    本溪市環境保護監測站,本溪, 117021
  20. The result show that degree of mineralization and total hardness have both increased to different extent in majority survey station, hydrochemistry type has transformed in individual station and reflecting the deteriorated water quality

    對比結果表明:大多數測站的礦化度和總硬度均有一定程度的增大,水化學類型個別站點有所改變,顯示水質變差。
分享友人