t-loading 中文意思是什麼

t-loading 解釋
載重汽車荷載
  • t : 中世紀羅馬數字的160。
  • loading : n. 1. 裝貨。2. 裝載量;重量;載荷;(船隻等的)貨載。 3. 填充物,填料。4. 額外人壽保險。
  1. Vsi -. s the feasibility of transformation and rebuilding the deep - water wharf of this port. taking into co :. s id < ' rat ion loading and, t he lack of large size iron ore knar ; ", ; ?. _ ' / >

    從天津港目前的接卸情況分析,由於沒有大型鐵礦石專用碼頭及配套的航道設施,大大制約著天津港鐵礦石吞吐量的增長。
  2. In the course of stowage of heavy article, officers and engineers concertrat their attention on the calculation of vessel " s parameters and the limitation that be bringed by many factors to loading position, and don " t think much of the affection of awkward lengthy cargo " space size to loading position

    在一般的重大件貨物積載過程中,往往側重於船舶的吃水、吃水差、穩性高度和傾角各參數及各因素對裝貨位置的限制,不太重視重大件貨物的空間形狀大小對裝貨位置的影響。
  3. Time - temperature superposition principle could bee applied to g " dependence on cd, and the dependence of shifted factor at on temperature demonstrated a linear relationship by a plot of in at vs. t - 1. the steady rheological measurements for nanocomposites melts were conducted. the results revealed that the melts of exfoliated nanocomposites with lower loading of org - mmt exhibited shear - thinning even at lower shear rate as compared with polymers filled with common particles, while the melts flow depended weakl

    研究結果表明仁復合體系g 『和動態損耗模量寧的對數關系性呀g 『一109夕, _印維乖溫動態模量滿足時溫疊加原理,頻率移動因子( at )的對數與塌度的倒攀即種馬與了一『有良好的線性關系?一_面,復合體系熔體的穩態剪切流變行為具有不同於普通粒子填充聚合性。
  4. The protector of electromotor have used heat relay for a long time, but heat relay not only has a dead area in the light over - loading area, but also ca n ' t protect open phase under so much circumstances

    電動機保護裝置採用熱繼電器已有很長的歷史,但熱繼電器在電機的輕過載區存在著「保護死區」 ,而且對斷相保護在許多情況下起不到保護作用。
  5. "i don't like having a loading gun in the house, " she said.

    她說道:「我不喜歡屋子裡放一枝子彈上了膛的槍。」
  6. 5 for cargo lots over 1, 000 m / t each, or any other lots less than1, 000 metric tons but identified by the buyer, the seller shall, at least10 days prior to the date of shipment, inform the buyer by telex or cableof the following information : the contract number, the name of commodity, quantity, the name of the carrying vessel, the age, nationality, andparticulars of the carrying vessel, the expected date of loading, theexpected time of arrival at the port of destination, the name, telex andcable address of the carrier

    一次裝運數量超過一千噸的貨載或其它少於一千噸但買方指明的貨載,賣方應在裝船日前至少10天用電傳或電報通知買方合同號、商品名稱、數量、船名、船齡、船籍、船隻主要規范、預計裝貨日、預計到達目的港時間、船公司名稱、電傳和電報掛號。
  7. T : the loading is now over. here are the mate ' s receipts for you to sign and the shipping orders for your reference

    裝船現已結束。這些大副收據需要你簽字,裝貨單供你參考。
  8. The height of media 、 the ratio of gas to liquid 、 hydraulic loadingthe organic and ammonia loading of influent are the key factors influence the performance of one - stage aerobic baf. the conclusions of the experiment are as following : the best height to remove the organic matter and ammonia is at 60cm 、 120cm from the influent side respectively. the best ratio of gas to liquid is 3 : 1 4 : 1 ; the organic and ammonia loading of influent have litlle influence on the performance of one - stage aerobic baf when the concentration are low ; whe the ratio of gas to liquid is 3 : 1, the ammonia loading is blow 0. 87kgnh _ 4 ~ + - n / m ~ 3. d, the enfluent concentration of ammonia is blow 5mg / l which satisfies the water reuse standard ; at different organic loadings, the removal of organic matter keeps 35 % 45 %. hypothermia is unfavourable to nitrification for one - stage aerobic baf to removel ammonia, the influent concentration of ammonia can ’ t satisfy the water reuse standard

    試驗表明:對有機物的去除主要發生在進水端60cm內,對氨氮的去除主要發生在進水端120cm內;曝氣生物濾池運行的最佳氣水比為3 : 1 4 : 1 ;在進水有機物和氨氮濃度比較小時,水力負荷對其去除率影響不大;在氣水比為3 : 1 ,進水氨氮負荷小於0 . 87kgnh4 + - n / m3 (濾料) ? d時,出水氨氮小於5mg / l ,滿足回用水的要求;在不同有機負荷下,有機物去除率保持在35 % 45 % 。
  9. Dcs play a pivotal role in the development of antitumor immunity. t lymphocytes immune response induced by direct antigen - pulsed dcs can not maintain longer for peptides - mhc department or mhc molecules degeneration. the method of dcs loading with tumor antigen gene is another potential approach to enhancing and maintaining immune response

    在用抗原直接刺激dc時,由於抗原- mhc復合物解離或細胞mhc分子降解而不能維持所誘導的t細胞免疫應答,藉助載體把腫瘤抗原基因導入dc后腫瘤抗原在dc內的持續表達能增強其抗原提呈能力並能維持所誘導的免疫效應。
  10. This part, by way of how state - owned railway industry and railway transportation networks relation, analyzes the problems in railway industry on defining the state - owned assets, function establishing, carrying out the responsibility and the dealership, and establishing mordern industry system and inspired system for railway netsworks, also encounter, etc., analyzing characteristics of changsha and other railway industry, to compare with europe, japan and russianjanalyzes what problems are with railway industry and transportation networks in the process of " enterprises independent, financing dividing, staff separating " and are with changsha railway industry in scale, facilities, capitals, quality of staff members and the violently competed environment inside and outside, etc. ; studing substance, special feature, principle, check - up target for railway industry perform capital responsibilities. in railway industry enterprises and manaing, investigates how to classify railway industry and transportation networks ' s managemen t scope - sticking to assets basis establishing market position of railway industry, endowing sufficient and free dealership to enterprises, at the same time, creating effectively supervised confined system ; analyzes chang tie machine - loading mill decline its competion - power can be behaved makes readers better understand some main problems in managing railway industry and why the problems occurs, at last some relevant countermeasures are proposed to solve these problems

    面對激烈的市場競爭環境,研究工附業企業的經營管理現狀,找出應對措施具有十分重要的意義。本文從鐵路工附業企業與運輸主業的關系,分析了鐵路工附業在國有資產的界定、職能定位、企業經營責任和經營權的落實、鐵路建立現代企業制度、企業如何建立有效的監督機制以及存在的三個不到位等方面的問題;分析了路內和長沙鐵路工附業的特點,比較了歐洲、俄羅斯和日本鐵路經營管理的特點;分析了鐵路工附業企業與運輸主業在「企業分設、財務分賬、人員分開」過程中,長沙鐵路工附業企業在規模、設備、資金、人員素質以及內外部激烈的競爭環境等方面面臨的問題;研究鐵路實行資產經營責任制的內涵和特徵、必須堅持的原則,提出了工附業實行資產經營責任制的考核指標及主要內容。
  11. 5 for cargo lots over 1, 000 m / t each, or any other lots less than 1, 000 metric tons but identified by the buyer, the seller shall, at least 10 days prior to the date of shipment, inform the buyer by telex or cable of the following information : the contract number, the name of commodity, quantity, the name of the carrying vessel, the age, nationality, and particulars of the carrying vessel, the expected date of loading, the expected time of arrival at the port of destination, the name and telex of the carrier

    一次裝運數量超過1000噸的貨載或其他少於1000噸但買方指明的貨載,賣方應在裝船日前至少10天用電傳或電報通知買方合同號、商品名稱、數量、船名、船齡、船籍、船隻主要規范、預計裝貨日、預計到達目的港時間、船隻公司名稱和電傳。
  12. It is provided by the result of observing for the trial of pile, if the cast - in - place is constructed according to strict technological process, the limit load - bearing capacity of single pile is more larger then its calculational value, and under the function of the most trial loading, the frictional drag haven " t occur yield in every major loading layer, so the pile have greatly safety reserve in engineering

    樁試驗的觀測結果證明,按照嚴格工藝流程施工的鉆孔灌注樁,其單樁極限承載能力遠大於計算值;在最大試驗荷載作用下,各主要持力層均未出現摩阻力屈服現象,樁有較大的工程安全儲備。
  13. But routine electronic protector ca n ' t realize the protection for counter time limit, which is matching with the graph of heat over - loading protect. it can only realize " single point protection " and ca n ' t protect the failure happened during start - up

    但是常規電子式保護器無法實現與電機熱過載保護特性曲線相匹配的反時限特性保護,只能實現「單點式」保護,無法保護啟動過程中出現的故障。
  14. 5 results of an experimental investigation on shear behavior of l, t and + - shaped columns are presented. the effects of shear - span ratio, axial compression ratio, stirrup contents and loading direction on shear behaviors of l, t, and + - shaped columns are discussed. combining with test data of others, the formulas for shear strength of l and + - shaped columns are given

    5對l 、 t 、十形柱受剪性能進行了低周反復荷載試驗研究,討論了剪跨比、軸壓比、配箍率、荷載作用方向對l 、 t 、十形柱承載力和延性的影響,並結合他人試驗結果,提出了l 、十形柱的偏下線受剪承載力公式。
  15. At last this paper also analyses special - shaped section columns subjected to biaxially eccentric loading using finite element program ansys5. 7. according to comparing of analytical results, the ductile behavior of r. c. t, l - shaped and " + " shaped columns are investigated

    本論文最後採用大型有限元程序州sys5 . 7對上述幾種截面柱構件也進行了分析,通過比較計算結果,得出異形截面柱延性變化規律,並檢驗本論文所編制分析程序的可靠度。
  16. Standard test method for strength properties of tissue adhesives in t - peel by tension loading

    通過拉伸載荷測定t形剝落狀態下組織粘合劑強度特性的標準試驗方法
  17. Thirdly, some shortcomings that numerical simulation ca n ' t effectively applied in jacked pile are proposed. several problems need to be resolved in numerical simulation of jacked pile ; for instance, finite deformation problem, constitutive model of soil, contact between pile and soil and loading problem

    3 、根據目前有限元在模擬靜壓沉樁方面存在的不足,指出了模擬沉樁過程需要解決的問題:土體的有限變形;接觸問題;本構關系;位移貫入法的加載問題。
  18. On the other hand, due to the difference of the loading form on eccentric loading column with push - out test and short - column test, the bond - slip performance ca n ' t be displayed in it

    同時,由於推出試驗( push - outtest )和短柱試驗( short - columntest )與偏壓柱的受力狀況有差別,並不能真正反映出構件中的粘結滑移性能。
  19. This is because the latter doesn t include jvm activity prior to the loading of the platform runtime or cpu activity outside of plug - in startup

    這是因為後者不包括platform runtime加載之前jvm的運行時間或者插件啟動之外的cpu運行時間。
  20. The recommended way to implement a satellite dll - loading mechanism with language fallback in case the selected language isn t available

    實現附屬dll加載機制的建議方法,此機制具有在選定語言不可用時可供替換的語言。
分享友人