tailings reservoir 中文意思是什麼

tailings reservoir 解釋
尾礦池
  • tailings : 廢料;篩下料;尾餾分
  • reservoir : n. 1. 貯藏所;貯氣筒;貯水池,水庫;貯水槽,水槽;貯存器;貯油器,油筒,油箱;貯墨管;【解剖學】貯液囊。2. (知識、精力等的)貯藏,蓄積。vt. 貯藏;在…設貯藏所[貯水槽]。
  1. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam bodys tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田尾礦庫區域地質構造、庫區不良地質觀察、尾礦淋濾固結和化學固結、壩體滲透水和庫區特大洪水等因素對馬家田尾礦堆積壩體穩定性影響的分析,初步論證了壩體尾礦砂土的地震液化、滲透破壞、壩肩滑坡使壩體失穩和洪水漫頂的可能性,以及尾礦淋濾固結和化學固結作用有助於壩體的穩定性。
  2. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam body ' s tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田尾礦庫區域地質構造、庫區不良地質觀察、尾礦淋濾固結和化學固結、壩體滲透水和庫區特大洪水等因素對馬家田尾礦堆積壩體穩定性影響的分析,初步論證了壩體尾礦砂土的地震液化、滲透破壞、壩肩滑坡使壩體失穩和洪水漫頂的可能性,以及尾礦淋濾固結和化學固結作用有助於壩體的穩定性。
  3. Test research on treating acid mine drainage of tailings reservoir in an iron mine

    某鐵礦尾礦庫酸性廢水處理試驗研究
  4. Research on site selection of mine tailings reservoir based on gis

    以個舊錫礦某礦山為例
  5. The ground base of the newly added chute in 4 tailings reservoir at dexing copper mine is characterised by thick weathered layer, loose structure, fractured zone and landslip mass accumulation. as a result, the ground has a great subsidence and inefficient carrying capacity. in view of this, the grouting technology was adopted to reinforce the chute ground base. the on - site testing shows that the subsidence of the chute has been efficiently controlled and the carrying capacity of the ground base improved so that the stability requirement has been met

    潘洛鐵礦主要使用的采礦方法是淺眼落礦的全面法和留礦全面法. 23礦體160m以上礦段上部為氧化礦和風化巖層,形成擠壓爆破和鬆散巖石覆蓋下的放礦條件.介紹了無底柱分段崩落法在該礦體開采中的應用.實際使用獲得的各項技術經濟指標還比較理想
  6. Feasibility study of planting peony in copper - ore - tailings reservoir has been conducted

    對銅陵市鳳凰山銅礦廢棄尾礦庫上復墾種植牡丹可行性進行了試驗。
  7. The soil in copper - ore - tailings reservoir was compared with that in reference lands to find out the differences between them in physical and chemical natures and in heavy metals pollution

    通過合理選擇不同對照地,從土壤的理化性質、被污染程度比較,為尾礦庫復墾的土壤改良提供依據。
  8. Test study on the dust preventives for the dry sands of tailings reservoir

    尾礦庫干灘防塵抑塵劑的試驗研究
  9. Key issues concerning transforming an underground mined area into tailings reservoir

    地下采空區改建尾礦庫的幾個關鍵問題
  10. Study on influencing of ph value to heavy metals pollution and fathering techniques of wastewater in tailings reservoir

    值對重金屬污染的影響及治理技術研究
  11. A point that majiatian tailings fill dam might induce earthquake and rainfall water might result in declination of shear strength of tailings sand soil once the reservoir is closed has been put forward

    並初步提出了馬家田尾礦庫可能會誘發地震和封庫停運后大氣降雨會導致壩體尾礦砂土抗剪強度降低的觀點。
分享友人