tension cable 中文意思是什麼

tension cable 解釋
受拉纜索
  • tension : n 1 拉緊;伸張。2 (精神、局勢等)緊張。3 【物理學】張力,拉力,牽力;(彈性體的)應力;(蒸氣等...
  • cable : n 凱布爾〈姓氏〉。n 1 【造船】錨鏈,錨索,(周長10英寸以上的)左捻三根三股索;粗索,巨纜;鋼絲繩...
  1. Application on heat - shrink converge enwind connection of high voltage tension cable in mine

    高壓電纜輻射交聯熱縮接頭在煤礦中的應用
  2. Captain hiller quickly backed the ship, and the cable was paid out to reduce towline tension.

    希勒船長急忙使船退行,放鬆纜繩以減少作用在它上面的張力。
  3. Unscreened high - tension ignition cable assemblies ; general requirements and test methods

    無屏蔽高壓點火電纜組件.一般要求和試驗
  4. Road vehicles. unscreened high - tension ignition cable assemblies. general requirements and test methods

    道路車輛.未屏蔽的高張力點火電纜組件.一般要求和試驗方法
  5. Another based mathematics model about the anchor cable is used for ship - anchor system. the numerical calculation have been worked by programmed in the matlab language. at the same time the influence that the dragging speed of antisubmarine helicopter and the height over the surface of ocean acts on the shape and the tension of underwater cable, and that the current velocity and the diameter of anchor cable acts on the shape and the tension of anchor cable, has been calculated

    把建立的水下拖索數學模型和錨索數學模型分別應用於航空吊放聲納探頭?纜繩動力學系統和船?錨系統,採用matlab語言編程進行了數值計算,同時分別計算和分析了反潛直升機拖速、距海面高度對拖索形狀和張力的影響以及海流速度、錨索直徑對錨索形狀和張力的影響。
  6. It is inevitable that some crane ' s parameter such as working temperature, actual span and so on will change because of the affection of install precision, the change of working condition and actual needs. as a result, it will affect the tension force of carrying cable and carrying capacity. and the tension force and carrying capacity have close relation to the performance of cable crane and operational security

    由於纜索起重機工作環境和性質的特殊性,安裝精度的影響、工作環境的變化以及實際工作的需要,不可避免的會引起的各項參數的變化,如工作溫度,實際的跨度等,造成與設計參數之間的差異,從而影響承載索的張力和承載能力,因而直接關繫到起重機的性能和生產的安全性,因此論文研究這些因素變化對張力和承載能力產生的影響,分析張力及承載能力對各因素變化的靈敏度,從而對生產實踐和安全生產作出有意義的指導。
  7. Some key issues in the modeling of a long span composite cable - stayed bridge are discussed such as cable tension, dead load, large deflection, concrete deck stiffness, concrete deck - steel girder connection, and boundary condition. some conclusion can drawn from the thesis : 1. the initial equilibrium configuration of the bridge is clarified in the thesis

    本文深入討論大跨度結合梁斜拉橋"基準"有限元模型建立過程中的幾個關鍵問題並得到一些有意義的結論: 1 .明確斜拉橋在索初應力和恆載作用下的初始平衡構型? ?處于初始平衡狀態時的幾何位置,給出了其計算方法。
  8. A set of non - linear differential equation of this model is formulated based on lagrange ’ s equation. the tension of the cable, the control force of translation and the control torque of rotation are obtained by the method of newton ’ s laws in vector space. the tethered mass system is modeled as a spherical pendulum

    本文基於一種常見的繩系單體系統,運用lagrange方程建立了該系統的非線性運動微分方程,採用矢量法對該運動微分方程進行了校核,並推導出吊索的張力、變幅控制力和回轉控制力。
  9. According as distortion harmonious condition of traction cable ' s anchorage on cable - suspended traveler, increasing amount of cable tension during casting concrete was computed, and under every key operating condition of casting concrete, traveler ' s frontend elevations were educed. we seriously controlled wenhui bridge ' s course of cantilever casting concrete by this method, which assured that the bridge ' s construction went on successfully. and then, it was discussed how to simulate the effect of prestressing force in spatial analysis

    根據掛籃前端牽索錨固點處的變形協調條件建立了掛籃上混凝土澆築過程中牽索索力的增加量,並推導了掛籃上混凝土澆築過程中的各主要工況下掛籃前端標高的計算公式,對文暉大橋掛籃上混凝土澆築過程中的牽索索力和掛籃前端標高進行了細致地控制,確保了混凝土澆築的順利進行,為整個主梁線形和索力的雙控打下了良好的基礎。
  10. This paper also presents the methods of controlling unstressed length of cable, pre - displacement of saddle, anchor span tension, erection of wire strands, the fixed position for erecting cable band and cable length. determination and control approach of displacement of saddles during cable erection are also introduced. at the same time, the change course of linetype during construction period for suspension bridge is analyzed

    再次,介紹了懸索橋的施工控制內容與方法,利用軟體sgkz2000對多座懸索橋進行了施工計算,提出本文關于懸索橋的主纜無應力長度控制、索鞍預偏量控制、錨跨張力控制、絲股架設控制、索夾安裝位置與吊索長度控制的方法;介紹了吊梁階段鞍座頂推量的確定與控制方法,分析了施工階段懸索橋的線形變化過程。
  11. This paper analyses the tension of fiber optic micro cable ( fomc ) and presents the design of fomc deployment system considering its characteristics

    摘要通過對光纖微纜的受力分析,結合光纖微纜的特點設計並實現了光纖微纜收放系統。
  12. The two forces acting on the bucket are the weight and the tension of the cable.

    加在這吊桶的力為重量和綱纜的張力。
  13. Specific dead - end design and performance depends upon a number of factors such as cable brand and design, strength member construction, jacket type, tension load requirements, temperature and environmental operating conditions, and so on

    使adss光纜的表面及芯部光纖免受損傷。充分考慮有效地保護adss光纜,該類線夾採用內外層預絞絲結構。
  14. A portable wind cable can be measured in a variety of circumstances, not by the winds of change cable circumstances measuring wind cable tension ; both of arbitrary moment of absolute tension cable wind, the wind can monitor cable tension variation ; construction equipment to the wild environment ; lightweight structures, the demolition convenient, simple measurement ; the intelligent measurement mode, can provide a wide range of choices rope specifications directly measured wind cable tension that the absolute need for conversion, and misoperation automatic alarm functions, measurement more convenient, direct, accurate and high degree of automation

    一種便攜式纜風測力器可在各種施工環境下,在不改變纜風受力的情況下測量纜風張力;既能測量任意時刻纜風張力的絕對值,又可監測纜風的張力變化;裝置適應野外施工環境;結構輕巧、安拆方便、測量簡捷;在智能化測量模式下,能夠提供多種鋼絲繩規格的選擇,直接顯示被測纜風張力的絕對值,無需換算,並有誤操作自動報警功能,測量更加方便、直接、準確,自動化程度高。
  15. Supporting mechanism of pre - tension 3d - cable and its application

    預拉力三維錨索支護機理與實踐
  16. If wire tension exceeded 9, 000 kilograms, the cable would break, and $100, 000 worth of unique equipment would be lost.

    拖纜的張力如果超過了9,000公斤,就會斷裂,而價值100,000美元的這個僅有裝置就會損失掉。
  17. To avoid the probability, engineer calculate the cable tension and the pre - rising elevation with finite element theory, it cost much time in design the program and repeat calculation, the other hard work is to find out the place where the cables located in span arch structure, its must find out the optimized result manually which restrict the design work. recent years, lots of commercial fea software develop rapidly. engineers focus on the solution of commonness problems by the software existed

    為了解決這個問題,設計人員常常採用有限元方法計算扣索受力及拱肋控制標高,並根據計算結果設計扣索吊裝位置,在此過程中大量重復編程及計算工作佔用了很多工作時間,另外在扣索吊裝位置的選定過程中又沒有明確的方法,只能根據大量的計算結果人工尋找優化方案,這些都制約著設計工作的開展。
  18. Anchored tension cable

    錨定拉張鋼纜
  19. With the appearance of high strength concrete high tensile steel wire and cable, the cable - stayed bridge is more and more widely used and popular. it unites three diversely bearing structure style, compression tower tension cable and bending press beam, into one bridge style

    斜拉橋是隨著高強度混凝土材料、高強鋼絲和拉索的出現才得到廣泛推廣應用的橋型,它把主塔受壓、拉索受拉及主梁受壓彎的三種不同受力的構件有機地組合在一個統一體中。
  20. Road vehicles low - tension cable

    公路車輛用低壓電纜電線
分享友人