test spring 中文意思是什麼

test spring 解釋
測試簧片
  • test : n 1 檢驗,檢查;考查;測驗;考試;考驗。2 檢驗用品;試金石;【化學】試藥;(判斷的)標準。3 【化...
  • spring : n 1 春季,春天。2 青春;初期。3 〈pl 〉大潮時期。4 泉。5 源頭,水源,根源,本源;發生;動機,原動...
  1. This machine adopts an automatic way to measure torsional stiffness and hysteresis of damper spring on driven plate, the whole machine is controlled by industrial computer. all performances are carried byitself. it is exerted torsion by itself or by manul, then it gathers data, sets up data base for test, and outputs data and figures automatically

    該機採用自動方式檢測汽車離合器中從動盤減震器的扭轉特性,工業計算機控制,自動施加扭矩,自動採集數據,自動建立測試數據庫及輸出數據和圖形。
  2. In ohio growth test trees from northern states started growth earliest in the spring, developed most intense autumn color.

    在俄亥俄的生長試驗樹中,北方各州的春季生長開始最早,秋色表現得最強烈。
  3. This article designs the calculation and the structure of the mechanism, using elastic and vertical raiser mechanism ( papilionaceous spring ), and makes concussion test towards the special failure of take up

    採用彈性垂直托貨機構(碟簧式) ,對該機構進行設計計算和結構設計,並對提升機的特殊故障進行了沖擊校核。
  4. Nowadays, company has been equipped with perfect gas spring assembling lines, microcomputer controlling function testing platforms, fatigue longevity test - beds, high and low temperature function concussion test - beds and sodium fog experiment tables

    公司現已配備有性能完善的氣彈簧裝配流水線、微機控制性能測試臺、疲勞壽命試驗臺;高低溫性能沖擊試驗臺、鹽霧實驗臺等專用設備。
  5. The objective of the test process was to examine how the signal - path loss varied after exposure to different levels of vibration, and if discontinuities could be forced through long - term fretting wear or by unbiasing the spring contact with excessive shock

    測試的目標是檢驗在施加不同程度的振動之後,信號路徑損失是如何變化的,以及是否會通過長期接觸磨損或通過用過度沖擊使彈簧不偏置而形成不連續性。
  6. Most in - circuit test fixtures use spring - loaded probes and are vacuum actuated

    很多在線測試固定裝置是帶有彈簧的探針或者採用真空啟動的。
  7. Spring back and its compensation test in deep - drawning process of automobile panels by fem

    汽車覆蓋件深拉延有限元模擬過程中的回彈及補償試驗
  8. Test on rearing spring silkworm with new autrmn silkworm variety

    秋蠶新品種的秋種春養試驗簡報
  9. Standard test methods for bend testing of metallic flat materials for spring applications involving static loading

    涉及靜負載的彈簧用金屬板材彎曲試驗的方法
  10. The test research continuous two years, carry out land membrane cover, the ambient conditions that can improve garlic growth growth, raises winter spring soil temperature, maintenance has moist soil, loose, reduce moisture to evaporate run off, it is good to promote garlic to make sprout early, growth better, and take out moss early, raise output and quality, promote garlic to increase production and receipt

    摘要經過連續兩年的試驗研究,實行地膜覆蓋,可以改善大蒜生長發育的環境條件,提高冬春季土壤溫度,保持土壤濕潤、疏鬆,減少水分蒸發流失,可以促進大蒜早出苗、齊苗、長勢好、早抽苔,提高產量和質量,促進大蒜增產增收。
  11. It ' s an ideal structural system and has multi - earthquake resistance ability because of a great deal of slabs removed in floors above the transfer - story amended the lateral stiffness of the stories near the transfer - story. based on the available references, the five - spring line element, the three - spring line element and the multiple vertical - line - element model are introduced to model special column, beam and shear - wall, the relevant stiffness matrixes are deduced and the restoring - force models are gaven to deep into the elasto - plastic seismic characteristics of the structure. acording to the results of shaking table test and elastic finite element analysis, a new making model melhod is presented in which uses the linear and the nonlinear element and the assumption that the floor is infinitely rigid in different areas

    為進一步研究這種復雜高層建築結構的彈塑性性能,本文在國內外現有研究的基礎上,提出利用五彈簧桿元、三彈簧桿元及多豎線單元模型分別模擬空間柱、梁和剪力墻,推導了相應的剛度矩陣並給出了恢復力模型;結合試驗研究和精細有限元分析的結論,提出線性和非線性單元相結合,剛性樓板假定和彈性樓板相結合的建模方法,較好地解決了空間結構彈塑性分析中佔用計算機資源較多的問題;接力大型有限元分析程序? ? ansys ,在上述建模思路的指導下建立了結構的空間非線性分析模型,進行了空間三維彈塑性時程分析。
  12. Material composition appears, and reading material in - put makes the chinese test change from two - dimensional construction to three - dimensional construction ( chinese knowledge, reading and composition ). graduation tests departing from entrance tests, exploration of the standardized test, weakening the chinese knowledge, the researches of controlling error of judging composition, pattern set " 3 + x ", judging test papers on net, and experiments of spring and summer university entrance test. all the above, having made remarkable achievements, make the current chinese test more modernizing and scientific

    供料作文的出現,閱讀內容的增加使語文試卷由二維結構到三維結構的轉變,畢業會考與升學考試的分離,標準化考試的探索,語文知識考試的淡化,對語文能力測試的重視,作文評分誤差控制的研究以及高考「 3 + x 」科目設置試驗,網上閱卷和春夏兩季招生考試試驗等都為語文考試現代化、科學化作了有益的嘗試,也取得了顯著的成就。
  13. It now possesses of not only some production equipment advanced in the national level, such as automatic hydraulic pressure spring eye machines, automatic control quenching furnaces and automatic control tempering furnaces the control accuracy attains 5 and shot blasting machines of landscape and vertical orientation, but also some sophisticated quality detection equipment, such as durometers, metallographic microscopes, stiffness and endurance test machines, etc. besides the hardware equipment, the company has a group of senior specialized technical personnel in the field of the design of the leaf spring processing, the leaf heat treatment as well as the tqc total quality control

    擁有自動液壓卷耳機自動控溫的淬火爐和回火爐爐溫控制精度達到5橫向和縱向噴丸機等國內先進的生產設備。同時還有為保證質量購置的硬度計金相顯微鏡剛度檢測及疲勞試驗機等先進的質量檢驗設備。從產品生產開始的每一個環節進行全方位的質量控制。
  14. Pressure seal design without live load bonnet ( no spring washers ) : the gasket bolt tightness must be rechecked after operating test pressure and temperature has been achieved

    沒有動負載閥帽的壓力密封結構(沒有彈簧墊圈) :在工作試驗壓力和溫度達到限制值時,必須重新檢查墊圈螺栓的緊固性。
  15. The variational trait of the first temporal coefficient is that the coefficient is often positive in 1960s, often negative in 1970s, the break point often happen in 1960s and 1970s, especialy 1970s ; the fluctuate of the second temporal coefficient of year. spring and autumn appears little change, but appears much change of summer and winter, the break point often happen in 1980s and 1990s, specially 1980s ; the change trend of the third temporal coefficient is not obvious during 1961 to 2000, only appears clear raise in the anaphase 1990s ; it is difficult to detail the positive and negative trend of the fourth temporal coefficient, the situation of the coefficient appears alternant change of positive value and negative value, the break points happen concentratively in 1990s, the situation of the fifth temporal coefficient is like the fourth ' s ; the alternate of positive value and negative value of the sixth temporal coefficient is obvious, then the negative trend take advantage after 1990s, the distribution of the break point is even, but most of them still in 1990s ; the break points happen many times, but it is limited that the break points attain 0. 05 significance test

    第一時間系數變化大體有如下特點:對年和季節來說, 60年代系數多表現為正值, 70年代多表現為負值,突變點多發生於60 、 70年代,特別是60年代;第二時間系數在年、春季、秋季表現為波動很小,夏季和冬季則很大,突變點多發生於80 、 90年代,特別是80年代;第三時間系數正負變化趨勢不明顯,只是90年代後期在年和夏季降水中升高明顯;第四時間系數基本無明顯正負趨勢可言,只是正負交替出現,突變點集中出現在90年代;同第四時間系數相似,第五時間系數亦無明顯正負趨勢,突變點多出現在90年代;第六時間系數正負交替明顯,進入叨年代后負趨勢為主,突變點分佈較均勻,但仍以904atvjz多;突變點出良多,但突變區域艾擇no 05 ggrr著性以上的卻有限。
  16. Test engineers refer to spring - loaded probes as " nails " and refer to a fixture using spring - loaded probes as a " bed - of - nails " fixture

    測試工程師把帶有彈簧的探針當作「釘子」 ,把帶有這種探針的固定裝置當作「針床」 。
  17. On the basis of the finite element analysis of the press - mounting machine, to solve the modeling error of the previous modeling method, a new mixed - model method using the spring element and thin - layer solid element was introduced in this thesis. an experiment designed to test the interface static stiffness was carried out and the needed modeling datum was obtained

    在對壓裝機進行了整體建模模擬的基礎上,針對壓裝機整體建模存在的誤差問題,本文提出了一種改進的彈簧單元和薄層實體單元混合建模的方法,並依此設計了螺栓結合面靜剛度測試試驗,通過試驗獲得了建模所需的參數。
  18. Study on the design about the flux of the by - way and the resistance characteristic test of adjustable hydro - pneumatic spring value with the triangle throttle - slice

    三角閥片式可調油氣彈簧旁通閥流量及阻力特性試驗
  19. Solderless connections - spring clamp connections - general requirements, test methods and practical guidance

    無焊連接.彈簧卡箍連接.一般要求試驗方法和實用指南
  20. Solderless connections - part 7 : spring clamp connections ; general requirements, test methods and practical guidance

    無焊連接.第7部分:彈簧夾件連接.一般要求試驗方法和實施指南
分享友人