test station 中文意思是什麼

test station 解釋
測試機臺
  • test : n 1 檢驗,檢查;考查;測驗;考試;考驗。2 檢驗用品;試金石;【化學】試藥;(判斷的)標準。3 【化...
  • station : n 1 站,臺,車站;航空站,機場。2 派出所;署,局,所。3 【無線電】電臺,電視臺。 4 駐地,部戍地,...
  1. A detailed introduction was made to the properties of the wet coated sand suitable for multi - station shell mould shooting machine ; the development of a sort of high strength coated sand with low resin content : the shaping index and wetness adjusting process : analysis and prevention of peel back defect of shells made with overturning hopper process ; test method of peel back resistance of coated sand : pinhole defect analysis of high ni ductile iron shell mould castings and application of anti - pinhole coated sand

    詳細介紹適用於吹砂式多工位殼型機的濕態覆膜砂性能;高強度低樹脂量覆膜砂的研製;濕態殼型覆膜砂的成形性指數與調濕工藝;翻鬥法制殼時的脫殼問題分析和解決辦法;覆膜砂脫殼性檢測方法;高鎳球鐵件殼型鑄造表面針孔原因分析與抗針孔覆膜砂的應用。
  2. But a member of the player ' s entourage firmly denied the report, saying that essien had been taken to a police station to provide a blood sample after an inconclusive breathalyser test

    但埃辛身邊的一位工作人員堅決否認了這一報道,稱酒精測試並未確認結果,埃辛隨后被帶回警局,提取了血樣。
  3. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大量工程經驗的基礎上,結合蓮花水電站在1995年及1996年導流渡汛工程措施設計及水工模型試驗,對混凝土面板堆石壩的導流渡汛標準、導流方式及其選擇、施工期渡汛及壩體填築分期、圍堰設計以及施工方案及總進度等與混凝土面板堆石壩特點有關的問題進行研究,為工程建設提供一定的參考。
  4. Bring forward any dissidence ( disagreement ? ) about the test report to the test station within a month. no transacting if the time limit is exceeded

    對于檢驗報告若有異議,應于發出報告之日起一個月內向檢驗單位提出,過期不予受理。
  5. Efficiency test study on unit 2 of gongzui hydropower station by ultrasonic method

    水輪機發電機組超聲波法效率試驗研究
  6. According to the results of the satiable modle test and trdimensional seepage computation, the structure arrangement of the cushion bottom could be asserted. to recheck the factors of safety against overturning and float flotation of cushion bottom, the stability computation methods of bottom of the literature, xiao wan hydraulic power station and ertan hydraulic power station were refereed

    根據穩定模型試驗及三維滲流計算成果,確定水墊塘底板的結構布置,參考國內小灣、二灘及參考文獻建議的底板穩定計算方法,復核水墊塘底板的抗傾、抗浮穩定。
  7. Spot test and result analysis of a pumping station

    某泵站的現場測試及結果分析
  8. In the meantime, the tolerance limit of coordinate difference in the station for site testing is given and it is possible to test total station coordinate trave rse in site

    同時,根據該原理,給出了測站坐標差限值,從而實現了全站儀坐標導線的現場檢核。
  9. Test results show that under 2 - tone test in 5mhz tone spacing, the power amplifier system achieves - 50dbc imd3 with 20w output power, improved 20db in imd3 compared with the one without linearity. estimated value of aclr comes to 53db, which satisfies the 3gpp requirement for wcdma base - station transistor. further tests with alterative input power indicate a steady suppression to the imd3 controlled by the adaptive system

    測試結果表明,自適應前饋功放系統在雙音輸出功率20w時三階交調系數小於- 50dbc ,鄰通道泄漏抑制比( aclr )的估算結果大於53db ,在理論上滿足3gpp對wcdma基站發射機的指標要求。
  10. Based on seismic wave method, borehole acoustic method and indoor rock mechanics test, the dynamic and static parameters of the foundation rock for the toe slab of the concrete face rockfill dam for shuibuya hydropower station are tested, and then the relationship among the rock quality, dynamic parameter and static parameter are established with the parameters obtained from the test, furthermore, the classification and the quality evaluation are made as well

    摘要採用地震波法、鉆孔聲波法以及室內巖石力學試驗法,對水布埡水電站面板壩趾板建基巖體進行了動、靜參數測試,並根據所獲的參數建立了巖體質量、巖體動力學和靜力學參數三者之間的相關關系,對工程巖體進行了質量分級和質量評價。
  11. Inspection of xiluodu hydroelectric power station dam foundation consolidation grouting test

    溪洛渡水電站壩基固結灌漿試驗檢測
  12. Test process of consolidation grouting without ballast in dam foundation of goupitai hydropower station

    構皮灘水電站壩基無蓋重固結灌漿試驗工藝
  13. Highways winter maintenance plant and highways side equipment maintenance - deicing agent sprayer - fixed station test method for flow rate measurement

    高速公路冬季維修設備和高速路路邊設備維修.除冰劑噴灑機.流率測量固定站試驗方法
  14. Detecting test station of vehicle

    汽車檢測站
  15. The test system roots in the requirement of the devices " integration and intelligence for annual automobile brake performance test in the test station, and is mainly applied to the annual test for the car ' s brake force and the weight of axles ( dynamic or static ) by the traffic managerial apartment. the system can be used as a separated test unit, also shared by the whole test station through the database in master - control, even by the entire country

    該檢測系統來源於汽車檢測站的汽車制動性能年檢設備綜合化、智能化要求,主要用於交通管理部門對轎車進行年終檢測時的制動力與輪軸重量(動態、靜態)檢測,該系統既可以成為一個獨立的檢測單元來使用,也可以通過主控機的數據庫系統與整過檢測站乃至全國各汽車檢測站實現資源共享。
  16. General requirements for the competence of automotive multiple - function test station

    汽車綜合性能檢測站能力的通用要求
  17. Ganfa has over 50 years experience of designing and manufacturing and has many items of patent techninque. the synchronous generators and permanent magnet generators which are manufactured with advanced technology and excellent machining equipement, will be able to meet the requirement of different technical condition which matched with various type turbines. ganfa has manufactured the generators of 0. 1 to 20mw in capacity which have been put into operation at present and owns the capability to manufacture the following generators : the capacity per unit up to 180mw, the stator outer diameter of generator up to 9, 000mm, the speed of vertical type generator up to 750r min, and thespeed of horizontal type generator up to 1, 500r min, both the b - grade and f - grade insulation class, the terminal voltage can up to 13. 8kv. ganfa manufactured 34, 500kw water turbine generator sets for the donghewan power station, yongchang, gansu, china which is located in 2. 868. 5m height above sea level, and has successfully solved the difficult problems such as plateau corona - shielding. ganfa is equipped with the generator test station and insulation material laboratory which are advanced test facilites and testing means to make each item electrical performance of products meet designing requirements from purchasing to delivering

    公司具有50年的設計製造經驗,擁有多項專利技術,生產的同步發電機永磁機技術工藝先進,製造精良,能滿足與各式水輪機配套的不同技術條件要求。目前公司已製造投產的發電機容量范圍為0 . 120mw ,具備生產單擊容量50mw的能力,發電機機座號最大可達9000mm ,立式機最高轉速750r min ,臥式機最高轉速達1500r min ,絕緣等級有b級和f級,圈式線圈最高電壓達13 . 8kv ,公司製造的甘肅永昌東河水電站34500kw水輪發電機組,海拔為2868 . 5m ,成功解決了高原防暈等難題。公司擁有電機試驗站絕緣材料試驗室等先進的實驗室設施和測試手段,使產品從原材料進產,到成品出產的各項電器性能測試均能滿足設計要求。
  18. The model is adapted to be used in semiarid regions. this article presents wudaogou test site to carry on modeling simulations. based on the results of " four waters " conversion at wudaogou test station, groundwater evaporation and infiltration have been evaluated furthermore

    本文選取五道溝實驗區進行模型驗證,並在五道溝實驗站「四水」轉化關系研究成果的基礎上,對潛水蒸發和入滲補給作了進一步的分析研究。
  19. Follow all test station on smt line in the factory , solve all smt test problem

    跟蹤工廠smt線所有的測試工位,解決測試問題。
  20. Daily review and monitor the spc data collection by operator of test station

    日常評審和監控由測試工作站搜集在spc圖中的數據。
分享友人